Tender For Electrical Work Schedule Of Rates & Quantum Of Works Involved For Replacement Of Olod Damaged And Non Serviceable 11 Kv Vcb Switchgear At 33/11 Kkv Substation Deeh Under Electricity Distribution Division-Salon Raebareli
Tender Overview
Project Description
Schedule Of Rates & Quantum Of Works Involved For Replacement Of Olod Damaged And Non Serviceable 11 Kv Vcb Switchgear At 33 / 11 Kkv Substation Deeh Under Electricity Distribution Division-Salon Raebareli
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-Apr-2023 | DATE EXTENSION | Date | 27-Apr-2023 |
| 2 | 28-Apr-2023 | DATE EX | Date | 29-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | SAFE CARRIAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO 33/11 KV SUBSTATION DEEH, SALON RAEBARELI ALONGWITH LOADING-UNLOADING :- |
| 2 | Safe Carriage ofIncomming11 KV VCB CTR 600/300/5A 350 MVA (02 No),Outgoing 11 KV VCBFDR CTR 200/100/5A 350 MVA (06 Nos.),11KV VCB Bus Capular (01 No.) from Electy. Store Centre Tripula Raebareli to 33/11 KV Sub-Station Deeh, Salon under EE, EDD Lalganj Raebareli alongwith loading unloading. |
| 3 | Safe Carriage of old & used VCB .incomming- 02 Nos.,Outgoing 11 KV VCBFDR CTR 200/100/5A 350 MVA (06 Nos.) and11KV VCB Bus Capular (01 No.) from 33/11 KV Sub Station-Deeh to Electricity Store Centre Tripula alongwith Loading Unloading. |
| 4 | Labour & Erection Charges:- |
| 5 | Dismantling of old & used VCB .incomming- 02 Nos.,Outgoing 11 KV VCBFDR CTR 200/100/5A 350 MVA (06 Nos.) and11KV VCB Bus Capular (01 No.) alongwith all accessories. |
| 6 | Errection and Installation ofIncomming11 KV VCB CTR 600/300/5A 350 MVA. (02 Nos.) Outgoing 11 KV VCBFDR CTR 200/100/5A 350 MVA (06 Nos.), Bus Capular, 11 KV (01 No.)at Control Room of 33/11 KV Sub Station Deeh, Salon with Complete Fitting of all required accessories etc, as per RESPO Norms . |
| 7 | Making/Fixing of Control Cable 4X2.5/2X2.5 sq.mm. Cable. Required Cablewill be provided by Contractor. |
| 8 | The work of Earthing ofIndoor equipments. |
| 9 | The work for Testing & Commissioning of 11 KV S/G Panel and Transformer. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender