Power Boards / Undertakings / PSU Closing in 0 days TDR #37320989

Schedule Of Rates & Quantum Of Work For Under Deposit Work:-(1) G/S (150 Kva In Comm. Categories) Tom/S Vijai Chudamal Angle,Itaura Bujurg Unchahar (2) G/S Tom/S Pravin Mini Rice Mill Gadaganj Unchahar (3) G/S To M/S Sri Abhishekh Singh Laxami Ganjunchaha

Issued by Boards / Undertakings / PSU · salon, Uttar Pradesh
Tender Value
2 Lakhs
Estimated cost
Bid Submission
29 Apr 2023
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
salon → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Schedule Of Rates & Quantum Of Work For Under Deposit Work:- ( 1 ) G / S ( 150 Kva In Comm. Categories ) Tom / S Vijai Chudamal Angle, Itaura Bujurg Unchahar ( 2 ) G / S Tom / S Pravin Mini Rice Mill Gadaganj Unchahar ( 3 ) G / S To M / S Sri Abhishekh Singh Laxami Ganjunchahar ( 4 ) G / S To M / S Uco Bank Gadaganj Unchahar ( 5 ) G / S To M / Spublic Sauchalayaunchahar Under Deposit Work In Jurisdiction Of Edd-Unchahar Raebareli

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Apr-2023 DATE EXTENSION Date 27-Apr-2023
2 28-Apr-2023 DATE EXTE. Date 29-Apr-2023

BOQ

Name of Work: SCHEDULE OF RATES & QUANTUM OF WORK FOR UNDER DEPOSIT WORK:-(1) G/S (150 KVA IN COMM. CATEGORIES) TOM/S VIJAI CHUDAMAL ANGLE,ITAURA BUJURG UNCHAHAR (2) G/S TOM/S PRAVIN MINI RICE MILL GADAGANJ UNCHAHAR (3) G/S TO M/S SRI ABHISHEKH SINGH LAXAMI GANJUNCHAHAR (4) G/S TO M/S UCO BANK GADAGANJ UNCHAHAR(5) G/S TO M/SPUBLIC SAUCHALAYAUNCHAHAR UNDER DEPOSIT WORK IN JURISDICTION OF EDD-UNCHAHAR RAEBARELI.
Sl. No. Item Description
1CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE& SCRAP MATERIALS FORM SITE TO STORE CENTRE TRIPULA RAEBAREIALONGWITH LOADING UNLOADING AND PROPER STACKING:-
28.5 Mtr long PCC Pole.
311 Mtr long ST Pole.
4Loose line material including ACSR/RABBIT/AB CABLE/XLPE Cable/ weasel Conductor, Pin Insulators, Disc Insulatos, Top Channel, Stay Set, Disc Fitting 45/70 KN (T&C), Stay Clamp, 11KV F Clamp, V type Cross Arm, Disc Insulators, Stay Wire, SS Base Angle, Earthing Rod, Holding Clamp, T-Off Channel, G.I. Wire 6 SWG, Dropper Channel, Holding Clamp, F Clmp, LT Shackel Insulators, PVC Armed Cable (2X4mm). 3200 mtr. and other remaining items, as per estimate.
525 KVA T/F/63 KVA/100 KVA/250 KVA T/F with related materials. As per Estimate.
6Carrage of old/damaged material / T/F/Main Metering Unit from site to ESC Tripula Raebareli alongwith loading unloading.
7LABOUR AND ERRECTION CHARGES:-
8Errection of PCC Pole including dragging with Fitting of all accessories as per RESPO Norms.
9Grouting of PCC Pole with grouting materials including digging of Pole to pit side as per RESPO Norms.
10Errection of ST Pole including dragging with Fitting of all accessories as per RESPO Norms.
11Grouting of ST Pole with grouting materials including digging of Pole including fitting of all related accessories as per RESPO Norms.
12Digging of Pits then Errection/Re-Errection of double pole by PCC/ST Pole, grouuting of PCC/ST Pole with grouting materials including fitting of required all accessories as per RESPO Norms.
13Mounting of 16/25 /63/100 KVA/250 KVA Transformer onDouble Pole/Plinth with fitting of all required accessories as per RESPO norms, as per estimate
14Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms
15Laying,stringing & sagging of HT & LT Lineby DOG/AAAC/ ACSRweasal / RABBITconductor/AB Cable including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as per Estimate.
16Laying , stringing & sagging of XLPE Cable 3x120 sq.mm & 3X70 sq.mm with all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required.
17Earthing of Pole as per RESPO norms.
18Earthing of T/F body & neutral as per RESPO norms.
19Fabrication of Line materials like \"V\" type X-arm/Top Channel/T off Channel/M.S. Channel/ M.S. Angle/Gaurding Angle and other misc work, as required,
20Making/Installation/fixing of Switchgear/Cable box ID/OD, 11 KV 3x120 XLPE Cable / Disc Fitting/ 11 KV Cross Arms V-Type / SS Base Angle/ G.I. Pipe 6\" Dia/Cable Jointing Kit 3X120 & sq.mm/ M.S Channe/l Dropper Channel/Top Channel/Holding Clamp/Stay Clamp/Stay Insulators/PG Clamp/GI. Pipe 6\" Dia & Barbed wire with Nut & Bolts.as per RESPO Norms, as per estimate.
21Making/Installation of MET. U. O/D Type CT/PT 11 KV CTR 30/5, 15/5 Amp. & 10/5 amp. Pilfer Proof 11 KV CTR 30/5, 10/5 amp. & 15/5 Amp. As per Estimate.
22Making/Installation of Metering Cubical Pilfer Proof 11 KV CTR 30/5 Amp. Alongwith fitting of all required accessories.
23Making/Installation of Cable Box O/D 11 KV 3X120XLPE Cable Alongwith fitting of all required accessories.
24Making/Installation of Cable Box I/D 11 KV 3X120XLPE Cable Alongwith fitting of all required accessories.
25Making/fixing of HT XLPE Cable 11 KV 3X120mm2.

AI Tender Summary

OUR REF NO 37320989
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2 Lakhs
LAST DATE 29-04-2023
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Schedule Of Rates & Quantum Of Work For Under Deposit Work:- ( 1 ) G / S ( 150 Kva In Comm. Categories ) Tom / S Vijai Chudamal Angle, Itaura Bujurg Unchahar ( 2 ) G / S Tom / S Pravin Mini Rice Mill Gadaganj Unchahar ( 3 ) G / S To M / S Sri Abhishekh Singh Laxami Ganjunchahar ( 4 ) G / S To M / S Uco Bank Gadaganj Unchahar ( 5 ) G / S To M / Spublic Sauchalayaunchahar Under Deposit Work In Jurisdiction Of Edd-Unchahar Raebareli
Basic Detail
Tender No 01/EDC-II,R/2023-24
Bidding Type Tender
Location
City salon
State Uttar Pradesh
Key Dates
Publish Date 28 Apr 2023
Submission Date 29 Apr 2023
Open Date 29 Apr 2023
Finance
Tender Value 2 Lakhs
Tender Fee 1180
EMD 2000
Exemption Not Available
Document List
e6044cd5-1251-439f-bb2d-fd7885967f3d.html
BOQ_1332846.xls
t01.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 28, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 27, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 29, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 29, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 29, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

e6044cd5-1251-439f-bb2d-fd7885967f3d.html

xls

BOQ_1332846.xls

pdf

t01.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders