Tender For Upgradation Of Peerpora Shalabugh Road Bwo Construction Of R Walls Including Allied Items Balance Portion Name Of Scheme Upgradation Widening Of Peerpora Shallabugh Road Under Nabard- 1 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) In Trenches For Foundations, Drains, Pipes, Cables Etc. ( Not Exceeding 1.5 M In Width ) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed, Within A Lead Of 50 Metres:All Kinds Of Soil : 2 P / L, Of Dry Stone Soling Duly Hand Packed With Ramming, Dressing, Watering And Compacting All Inclusive Leads, Lifts, Loading, Un-Loading, Cost And Carriage Of Material Involved Complete. 3 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With:1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) 4 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form Work For: Retaining Walls, Return Walls, Walls ( Any Thickness ) Including Attached Pilasters Buttresses, Plinth And String Course Fillets, Kerbs Andsteps Etc. 5 Supply And Filling Of Gsb Behind R / Wallsas Backfilling Inclramming, Including Consolidation With 80-100 Tonne Prr And All Carriages, Leads And Lifts Upto Site Of Work Complete. 6 Providing And Laying Cement Concrete In Retaining Walls, Return Walls, Walls ( Any Thickness ) Including Attached Pilasters, Columns, Piers, Abutments, Pillars, Posts, Struts, Buttresses, String Or Lacing Courses, Parapets, Coping, Bed Blocks, Anchors Blocks, Plain Window Sills, Fillets Etcupto Floor V Level, Including Curing But Excluding The Cost Of Centring, Shuttering And Finishing With.1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) 7 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With:1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size ) 8 Reinforcement For R.C.C Work Incld Straightening, Cutting, Bending, Placing In Position And Binding All Complete:- ( Thermo Mechanically Treated Bars. ) . 9 Carriage Of Materials:Stone / Sand For An Average Lead Of 15Kms 10 Filling Empty Cement Bags With Earth; Including Cost Of Sewing And Strings, Cost Of Bags And Earth Including Placing Of Bags Complete Job. 11 Provision For Dewatering To Be Paid As Per Actual .As Per The Directions Of Incharge Engineer. 12 Supply, Stacking And Laying Of Wbm Grade 2Ndwith Specified Graded Stone Aggregate 63Mm - 45Mm Size Broken Quarry Stone @0.92Cum / 10 Sqm And Using Of Screening 13.20Mm Size @ 0.135Cum / 10Sqm And Binding Material @0.06Cum / 10Sqm Of Road Surface Including Sorting, Spreading To Template, Watering And Consolidation To Required Gradient And Camber With ( 80-100 ) Kn Road Roller All Inclusive Leads, Lifts, Loading, Unloading, Head Load If Any And Carriage Of Materials From Approved Source To Site Of Work Complete ( To Be Laid As Per Guide Line Of Most Specification ) . Finished Work To Be Measured. 13 Supply, Stacking And Laying Of Wbm Grade 3Rdwith Specified Graded Stone Aggregate 53Mm – 22.40Mm Size Broken Quarry Stone @0.92Cum / 10 Sqm And Using Of Screening 11.20Mm Size @ 0.135Cum / 10Sqm And Binding Material @0.06Cum / 10Sqm Of Road Surface Including Sorting, Spreading To Template, Watering And Consolidation To Required Gradient And Camber With ( 80-100 ) Kn Road Roller All Inclusive Leads, Lifts, Loading, Unloading, Head Load If Any And Carriage Of Materials From Approved Source To Site Of Work Complete ( To Be Laid As Per Guide Line Of Most Specification ) . Finished Work To Be Measured.