Bhubaneswar Development Authority-BDA has published Tender For Up-Gradation And Shifting Of 11Kv Line In Connection With Conversion Of 11Kv Over Head Line To 11Kv Xlpe Ug Cable In Front Of Isbt, Bhubaneswar. Submission Date for this Tender is 02-05-2023. Transmission Line Tenders in bhubaneswar Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PART - A (Construction of 11 KV Line DP Structure - 2 Nos.) Supply of materials for 11KV 3 Core, 150Sqmm, XLPE insulation armoured UG Cable with accessoriess. a) Length 11KV 3C, 150Sqmm cable (Open Trench) - 360.00 Mtr. b) Length of 11KV 3C, 150Sqmm cable(HDD) - 0.00 Mtr. |
2 | Supply of 11KV, 3 Core, 150Sqmm, XLPE insulation armoured UG Cable |
3 | Supply of outdoor termination kits shrinkable type suitable for 11KV 3 Core, 150sqmm, HT UG Cable for 3 Core (Set) |
4 | Supply of HDPE PE 80-PN8 Pipe of 110mm diameter (for 150sqmm HT Cable laying) |
5 | ERECTION PORTION - Laying,commissioning, testing of 11KV, 3 Core, 150Sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method. |
6 | Laying, commissioning, testing of 11KV, 3 Core, 150sqmm, aluminium, XLPE insulation armoured (Extruted type) UG cable by open trench method. |
7 | Erection of straight through jointing kits Heat Shrinkable type suitable for 11KV, 3 Core, 150sqmm, aluminum UG cable kits for 3 core(Set) |
8 | Laying of 110mm dia PE 80-PN8, HDPE Pipe inside open trench |
9 | CIVIL PORTION - Civil works with supply of all materials like cement, MS for rod,brick,coarse & fine aggregates and labour, T& P, etc for 11KV Cable trench. (Earth work of excavation of soil (1mtr W x 1mtr D)) |
10 | Earth work excavation of soil |
11 | Earth work excavation of hard rock |
12 | Backfilling with excavated soil outside and above the trench. |
13 | Damage of Asphalt for/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench.(1mtr width) |
14 | Civil works for Prefabricated RCC foundation with supply of all materials |
15 | Supply and erection of GI Pipe of dia 150mm, Class-B (8 Mtr) |
16 | Supply and erection of cable route marker along the cable route at an interval of 30 mtrs with civil works. |
17 | PART - B (Materials of D P with A B Switch) |
18 | WPB 160X152(11Mtr.long,30.44 Kg/Mtr) |
19 | Top channel 100x50x6mm,9.56 kg/mtr, each channel length 3 mtr, 2 nos channel required =92x9.56x3)(GI) |
20 | Fish plate 50x6mm 2.36 kg/mtr,each 0.280 mtr length, 6 nos required = (6x2.36x0.280) |
21 | AB Switch mounting channel 75x40x4.8mm ,7.14kg/mtr, Each channel length 3 mtr, 2 nos channel required = (9.56x2x0.35) GI |
22 | AB Switch side supportchannel 100x50x6mm,9.56Kg/mtr, each channel length 0.35 mtr, 2 nos channel required = (9.56x2x0.35) |
23 | Channel support fordown pipe 75x40x4.8mm,7.14kg/mtr each channel length 0.8 mtr, 1 nos channel required = (7.14x0.8x1) |
24 | Double pole belting channel 75x40x4.8mm, 7.14Kg/mtr, each channel length 3.0 mtr, 4 nos channel required = (7.14x3x4) |
25 | 50x50x6mm GI Bracing Angle, 4.5kg/mtr, each angle length 3.512 mtr, 4nos angle required = (4.5x3.512x4) |
26 | Danger plate ,2 Nos |
27 | Back clamp for danger plate 25x3mm flat,0.59 kg/mtr, flat of 0.510 mtr length 2 nos=(2x0.59x0.510) |
28 | H.T Stay clamp, 50x8mm flat, 3.24kg/mtr, 0.551 mtr, lrngth, 2 nos qty required(1 pair) |
29 | HT Stay set complete |
30 | HT Stay insulator(Type-C) |
31 | 7/10 SWG GI Staywire , Grade 2, 15kg/stay |
32 | GI Pipe earthing 40mm, 3 mtr long |
33 | 50x6mm GI Flat for earthing, 2.36kg/mtr,( 2.5x7 mtr for mesh formation, 12 Mtr for LA and 2.5 mtr for raising = 20.5X2.36 |
34 | GI barbed wire anticlimbing device 3 kgper support, 2 nos qty required |
35 | Back clamp for anticlimbing device 25x3mm flat,0.59 kg/mtr, flat of 0.510 mtr length 8 nos=(8x0.59x0.510) |
36 | Lightning Arrester (12KV,10KA)(Staion Class, class-2) |
37 | AB Switch (11KV,200A,3 Pole,50Hz) |
38 | 11KV pin insulator polymer |
39 | H W fitting (B&S)70KN 3 (bolted) |
40 | Disc insulator (B&S) 70 KN Polymer |
41 | PG Clamp for 100 sq mm AAA conductor |
42 | GI Nut & bolts of different size(13.718 kg each DP with AB Switch) |
43 | Black paint |
44 | Yellow colour paint for Background |
45 | CIVIL PORTION - |
46 | Fixing of complete 11KV Line complete stay set includes 1. Tum buckle assembly, 2. Stay Rod & stay plate, 3. Stay Insulator,4. Stay wire,5.Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size(500mmx500mmx 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & standard. |
47 | Concreting ratio 1:1½:3 (500mm x 500mm x 1800mm) = 0.45 Cu.mtr |
48 | Couping ration 1:1½:3 with dimension (500 x 500 x 450) = 0.113 Cu mtr |
49 | Construction Earthing chamber including installation of earthing, Making earthing chamber including excavation, soil treatment wioth bentoride powder, calculation of earth resistance, including installation of 3 mtr GI Pipe 40mm / 50mm including welding of GI Flat around pipe. |
50 | Dismantling of 116x100/150x150mm RS Joist |
51 | Dismantling of 11KV Line |
52 | Dismantling/ Removal of V Cross arm from pole inclduing loading, transporation, unloading and staking of dismantled at a proper in safe position at site store. |
53 | Dismantling of 11KV Pin insulator with pin including loading, transporation, unloading and staking at a proper place in safe position / site store. |
54 | Dismantled Materials |
55 | 116 x 100mm RS Joist (9 mtr) |
56 | 11KV V. Cross Arm |
57 | 80mm² AAAC |