| 1 | R-1384-Strengthening of the road from Kannuthoppu to Innanviduthi BG road KM 0/0-1/000 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material |
| 3 | Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. |
| 4 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250 |
| 7 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete |
| 8 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete |
| 9 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central ho |
| 10 | Providing and fixing Name board |
| 11 | Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet |
| 12 | 60 Cm Equilateral triangle (Cautionary) sign Board |
| 13 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface |
| 14 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 15 | (ii) Ordinary Kilometer Stone (Precast) |
| 16 | (iii) 200 m stone (precast) |
| 17 | (iv) Guard Stone |
| 18 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets,cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work |
| 19 | For the Second Year from the date ofcompletion of work |
| 20 | For the Third Year from the date ofcompletion of work |
| 21 | For the Fourth Year from the date ofcompletion of work |
| 22 | For the Fifth Year from the date ofcompletion of work |
| 23 | R-1285-Strengthening of the road from Vathalampatti to innanviduthi road KM 0/0-1/000 |
| 24 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material |
| 25 | Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. |
| 26 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 27 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS |
| 28 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250 |
| 29 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete |
| 30 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete |
| 31 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central ho |
| 32 | Providing and fixing Name board |
| 33 | Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet |
| 34 | 60 Cm Equilateral triangle (Cautionary) sign Board |
| 35 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface |
| 36 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 37 | (ii) Ordinary Kilometer Stone (Precast) |
| 38 | (iii) 200 m stone (precast) |
| 39 | (iv) Guard Stone |
| 40 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets,cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work |
| 41 | For the Second Year from the date ofcompletion of work |
| 42 | For the Third Year from the date ofcompletion of work |
| 43 | For the Fourth Year from the date ofcompletion of work |
| 44 | For the Fifth Year from the date ofcompletion of work |
| 45 | R-154-Strengthening of the road to Kilangadu Mugamathiyar BG Road in KM 0/0-0/480 |
| 46 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material |
| 47 | Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. |
| 48 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 49 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS |
| 50 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250 |
| 51 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete |
| 52 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete |
| 53 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central ho |
| 54 | Providing and fixing Name board |
| 55 | Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet |
| 56 | 60 Cm Equilateral triangle (Cautionary) sign Board |
| 57 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface |
| 58 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 59 | (iii) 200 m stone (precast) |
| 60 | (iv) Guard Stone |
| 61 | Construction of RCC 1.50m span Culvert @ Ch400 |
| 62 | Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation. |
| 63 | Filling with M.Sand including cost and conveyance and all charges etc., complete. |
| 64 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. |
| 65 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. |
| 66 | Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. |
| 67 | Below sill |
| 68 | Above Sill Level |
| 69 | Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges. |
| 70 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete. |
| 71 | C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete. |
| 72 | Providing and fixing 20mm bitumen felt for expansion joint between dirtwall and deck slab etc |
| 73 | Providing and fixing Tar paper for bearingfor expansion joint between dirtwall and deck slab etc |
| 74 | Provision for weepholes in brick masaontry as drawing etc |
| 75 | Gravel filling behind culvert wall completed as per drawing etc |
| 76 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets,cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work |
| 77 | For the Second Year from the date ofcompletion of work |
| 78 | For the Third Year from the date ofcompletion of work |
| 79 | For the Fourth Year from the date ofcompletion of work |
| 80 | For the Fifth Year from the date ofcompletion of work |
| 81 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package} |