Estimate For Eos To 1 No Indl, Pal Service Connection No.196.021.638 To Thiru.A.Vimalkumar, Mullankinavilai Under Killiyoor Section. 2)Proposal For Providing Unterrupted Power Supply Doing Flood At Nedumparampuss 100 Kva By Providing 1 No Additional 11 K
Tender Overview
Project Description
Estimate For Eos To 1 No Indl, Pal Service Connection No.196.021.638 To Thiru.A.Vimalkumar, Mullankinavilai Under Killiyoor Section. 2 ) Proposal For Providing Unterrupted Power Supply Doing Flood At Nedumparampuss 100 Kva By Providing 1 No Additional 11 Kv / 433 / 63 Kva Distn Transformer In Scd Section. 3 ) Eos To 1 No Oht Sc To The President Village Panchyath Adaikkakuzhi 63 Kva Dt Under Kollamcode Section.4 ) Eos To One ( Tt.3A1 ) Agriculture Activites Service In The Name Of Tmy.R.R.Rejitha, Manjapazhanji At Chemmannu Vilai Ss 100 Kva By Providing 1 No Distn Transformer 63 Kva Under Scd Sectrion. 5 ) Eos To 1 No 1No Commerical Ltct Service Connection In The Name Of The Parish Praist At Thoothoor Mandapam Ss 100 Kva By Providing 1 No Distntransformer 250 Kva Under Nbly Section.San Nos.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Apr-2023 | Date Extension | Date | 02-May-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Civil works |
| 2 | OrdinaryTreeClearance |
| 3 | Coconut TreeClearance |
| 4 | Excavation of pole pitin Hard soil (cmmon to all size of poles) |
| 5 | Erection of RCC,REC,PSC pole above 8.0 Mts length by using Crane/manual |
| 6 | Loading & unloading charges of all RCC ,REC pole above 8.0 Mts length |
| 7 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM |
| 8 | Excavation of pole pit upto 8.0 mts length by using JCB/Manual |
| 9 | Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual |
| 10 | Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length |
| 11 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM |
| 12 | Fixing of HT Pin Insulater |
| 13 | Fixing of LT Pin Insulater |
| 14 | Fixing of HT Disc Insulater |
| 15 | Fixing of LT shackle |
| 16 | Fixing of Aluminium knob |
| 17 | Fixing of 3Q X arm |
| 18 | Fixing of SQ X arm |
| 19 | Fixing of VX arm 3 .5 feet |
| 20 | Fixing of HT/LT \"TI\" Fittings |
| 21 | Dismantling & Re-Erection of 3Q Xarm |
| 22 | Dismantling & Re-Erection of SQ X arm |
| 23 | Dismantling & Re-Erection of V Xarm |
| 24 | Dismantling & Re Fixing of HT Pin Insulater |
| 25 | Dismantling & Re Fixing of LT Pin Insulater |
| 26 | Dismantling & Re Fixing of shackle |
| 27 | Dismantling & Re Fixing of Aluminium knob |
| 28 | Fixing of Taping Channel X Arm |
| 29 | Excavation of stay pit of 4.5 depth |
| 30 | Erection of stay setcomplete |
| 31 | Dismantling & Re Erection of stay setcompleteof stay pit of 4.5 depth (50% of original erection charges) |
| 32 | Street light switching point arrangement |
| 33 | Dismantling & Re-Erection of street lightswitching point arrangement |
| 34 | Dismantiling Re-Erection of 1*40 W tube light cmplete set |
| 35 | Dis & Redoing of S phase connection |
| 36 | Dis & Redoing of 3 phase connection |
| 37 | Erection of pole Earth |
| 38 | Paving & Stringing of conductor 7/4.09 mm ACSR |
| 39 | Paving & Stringing of conductor of above 7/2.59mm ACSR up to 7/3.35 mm ACSR |
| 40 | Paving & Stringing of conductor up to 7/2.59mm ACSR or other equivalent conductor |
| 41 | Releasing & Re erection(resagging) of conductor of above 7/2.59mm ACSR up to 7/3.35 mm ACSR |
| 42 | Releasing & Re erection(resagging) of conductor up to 7/2.59mm ACSR or other equivalent conductor |
| 43 | Loading & unloading ofline materials |
| 44 | Erection of 11 KV single pole Structere including erection of DT complete with center support |
| 45 | Loadind & un loading of Distribution Transformer Above 25 KVA to 100KVA |
| 46 | Transporting of Distribution Transformer Above 25 KVA to 100KVA |
| 47 | Painting of cement poles by distember coating including cst of distember |
| 48 | Set right of all sizes of leaning pole |
| 49 | Drilling of slotted holes |
| 50 | Sleeve Concreting |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.