| 1 | Supply carting, laying jointing, fixing and testing of following size G.I. Screwed pipes with special and fittings including cutting and threading of pipesetc. Complete of the followingsize G.I. (M) pipes I.S. 1239. |
| 2 | G.I.Pipe 32 mm dia |
| 3 | G.I. Pipes 25 mm dia |
| 4 | G.I. Pipes 20 mm dia |
| 5 | G.I. Pipes 15 mm dia |
| 6 | Supply of following valves and fittings ISI marked class -I as per IS - 788/1971 at site of work and fitting at pipe line as required. |
| 7 | G.M. Wheel Valve |
| 8 | 20 mm dia |
| 9 | 25 mm dia |
| 10 | 32 mm dia |
| 11 | Dismentling & Relaying of G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. Complete |
| 12 | 20 mm dia G. I. (M) Pipe |
| 13 | Excavation of earth work for pipe line in following starta, lift upto 1.5M and lead up to 30 m including refilling, watering and ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m fromtrenches including supply of labour and T&P etc. all complete (Assuming that 90% pipeline is laid in trenches). It is estimated that 75% excavation will be in soil mixed with single, bajari & boulders and rest 25% in medium rocks. |
| 14 | Soil Mixed |
| 15 | Medium Rock |
| 16 | Provide all materials, labour, T&P, construction of following chambers as per type design. |
| 17 | Wheel Valve / Air Valve Chamber (0.60x0.60) |
| 18 | Supply of all material, labour, T&P and construction ofIntake Chamber 0.60 M x 0.60 M size as per Drawing & Desin. |
| 19 | Supply of all material, labour, T&P and construction of R.C.C. Roghing Filter cum Collection Chamberas per Drawing & Design. |
| 20 | RCC CWR:-Design, testing bearing capacity of soil and construction of R.C.C. (1:1.5:3) semi sunk Clear Water Reservoir of following capacities in K.L. including supply of necessary scaffolding, shuttering and other accessories along withsupply and fixing of inlet and outlet pipes of size equal to sizes of inlet and outlet pipe line, making bye pass arrangement, fixing of overflow pipe in outlet pipe/distribution system, fixing of lightening conductor & M.S. Manhole of size as per norms,supply and fixing of M.S. Steel Ladder outside and inside the tank, and colour washing of approved class snowcemand along with carting of all materialsincluding supply of all materials, labour, T&P etc. complete as per latest IS specification or as per satisfaction & approval of Engineer in Charge. and Installation of M.S. Bucket Type chlorinator of 25 Ltrs. capacity with internal glass wool lining. |
| 21 | 10.0 KL Capacity |
| 22 | 7.5 KL Capacity |
| 23 | Provisionlaying P.C.C. 1:2:4 con to repair of village path after laying of pipe line. |
| 24 | Provide all material, labour, T&P, construction of Random Rubble Stone masonary 1:6 (1 Cement :6 coarse sand) |
| 25 | Provide all material, labour, T&P, construction of Random Rubble Stone masonary laid dry. |
| 26 | Supply of all materials, labours, T&P etc. and making ferrule connection to provide FHTC to the consumers excluding pipe line |