Strengthening Of Road 1 No - Package No Tn / Sng / 54 In Singampunari Block Of Sivagangai District. 1 Strengthening The Road From Kodungundrampatti Sirumaruthur Road Km 0 / 01 / 5 ( R-39 ) 2 Clearing Scrub Jungle Without Alignment For The Widening Of The Formation Of The Road Cutting Of Trace Up To 30Mm Girth Products The Cleaning Are To Be Stocked In Such A Place As Ordered By The Departmental Officer And The Ground Shall Be Left In A Perfectly Clean Condition. All Holes Of Hollows Whether Original, Existing ( Or ) Produced By Digging Of Roots Shall Than Be Carefully Filled Up The Earth Well Rammed And Leveled Of And The Entire Work Completed In All Respect As Per Si 17 ( 2 ) . 3 Picking The Existing Surface To 50Mm To 100Mm Thick Including Labour And Hire Charges For Picking Tools And Plants And All Other Incidental Charges Etc Complete As Per Standard Specifications. 4 Earth Work Excavation And Depositing On Bank With An Intial Of 10M And Lift 2M In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth And Earth Mixed With Small Size Boulders, Hard Gravelly Soil Etc., As Per Ss 20A Including Laying And Spreading In Layer Etc.Complete. 5 Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Water And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire And Fuel Charges For Power Roller, Water Sprinkler And All Other Incdidental Charges Such As Traffic Barricading And Providing Danger Lights Etc., Complete. 6 Km 0 / 0-0 / 70 7 Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam ( Wmm ) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250Mm Thick With Pavers In Subbase / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete. 8 Km 0 / 0-0 / 70 9 Providing And Laying Prime Coatover The Wmm Surface Using 7.00 Kg Of Bituminous Emulsion Ss I For 10 Sqm. Including Cost Of Bituminous Emulsion Which Will Be Supplied By The Department At Section Stores And Its Cost Will Be Recovered As Per Special Condition Appended Including Labour Charges For Preparing The Surface For Laying Tack Coat And For Applying Required Quantity Of Bituminous Emulsion By Mechanical Sprayer Including Hire And Fuel Charges For All Tools And Plants Employed Etc., Complete As Per Clause 503 Of Most Specification. 10 Providing And Laying Tack Coatover The Wmm Surface ( Treated With Primer ) Using 2.50 Kg Of Bituminous Emulsion Rs I . Including Cost Of Bituminous Emulsion Which Will Be Supplied By The Department At Section Stores And Its Cost Will Be Recovered As Per Special Condition Appended Including Labour Charges For Preparing The Surface For Laying Tack Coat And For Applying Required Quantity Of Bituminous Emulsion By Mechanical Sprayer Including Hire And Fuel Charges For All Tools And Plants Employed Etc., Complete As Per Clause 503 Of Most Specification. 11 Providing And Laying Premix Carpet With Seal Coat Type -A To 20Mm Thick Using 0.18Cum Of 13.2Mm, 0.09 Cum Of 11.20Mm And.09Cum Of 6.70Mm With 23.232 Kgs Ofvg 30 Bitumen For Premixing Per 10Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregate To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30T Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 20Mm With Mechanical Paver To The Specified Grades And Cross Section And Consolidated By 8-10T Vibratory / Pneumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site, Hire & Fuel Charges For 20-30T Cmp With Bitumen Boiler, Tipper Trucks, Paver Finisher, Vibratory / Pneumatic Roller And All Other Tools And Plants Required, Including Fuel And Other Incidental Charges Etc., Complete . 12 Km 0 / 0-0 / 75 13 Provision Road Furniture 14 90 Cm Equilateral Triangle Cautionary Signboard 15 60 Cm Equilateral Triangle Cautionary Signboard 16 60 Cm Circle ( Mandatory Sign ) 17 Chevron Signs 90 Cm Octogon ( Curves ) 18 Road Marking With Hot Applied Thermoplastic Compound With Reflectorising Glass Beads On Bituminous Surface 19 Road Marker / Road Stud With Lens Reflector 20 Name Board Cum Citizen Board 21 Hectameterstone 22 Construction Of Rcc Slab Culvert 1M Span ( Ch -368& 608M ) 23 Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10 M And Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton Soil, Hard Red Earth, Earth Mixed With Small Sized Boulders And Hard Gravelly Soil As Per Ss 20B 24 Collection & Supply Of Filing Sandincluding Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete. 25 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete. 26 Providing Additional Strutting To Centering Of Rcc Slabs Of Plain Surface For Every Additional 1.0 Metre Height Or Part Thereof But Not Less Than 30 Cm, Over The Initial 3.00 Metre Height From Floor Level Using Casurina Props Of 10Cm To 13Cm Dia Including Cross Bracing Etc., Complete Complying With Standard Specification And As Directed By The Department Officers. 27 Cement Concrete 1:3:6 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete. 28 Supplying And Fabrication Of Steel Including Cost And Conveyance Of Bending To Shape And Tying In Position And Forming Grills For All R.C.C Works Including Cost And Conveyance Of All Materials To Site 29 Rcc 1:1.5:3Mix Using 20Mm Iss Metalincluding All Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete. 30 Plastering With Cement Mortar 1:4 Mixto20mmthick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete. 31 Towards The Charges For Routlinemaintenance Of The Road Work Executedunder Mgsmt Including Dressing Of Bermsby Refilling The Gully With The Earth Fromborrow Pits, Cleaning Of Wild Seasonalgrowth On Berms, Destilting Of Side Drainsand Cd Works, White Washing Guard Stones, Painting Of Km, Hm Stones, Parapets, Cutting Of Branches Of Trees, Refixingdisplaced Guard Stones, Caution Boards, Speed Limit Boards Etc., With The Periodicityfor The Above Activities As Prescribed In Ircsp-20:2002 And As Directed By Thedepartmental Officers Except For Theconstructional Defects Which Has To Berectified By The Contractor At His Own Cost 32 For The First Year From The Date Ofcompletion Of Work 33 For The Second Year From The Date Ofcompletion Of Work 34 For The Third Year From The Date Ofcompletion Of Work 35 For The Fourth Year From The Date Ofcompletion Of Work 36 For The Fifth Year From The Date Ofcompletion Of Work 37 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd )