Construction Ofnew Piped Water Supply Scheme Under Jal Jeevan Mission At Bodalkachar, Kerha, Daukibudi, Nandtola, Semariha, Jurgu, Padkher, Majhatoliya, Taraidol, Lukampur, Baheradol & Karchulblock Burhar District Shahdol Based On Tube Well Including Inst
Tender Overview
Project Description
Construction Ofnew Piped Water Supply Scheme Under Jal Jeevan Mission At Bodalkachar, Kerha, Daukibudi, Nandtola, Semariha, Jurgu, Padkher, Majhatoliya, Taraidol, Lukampur, Baheradol & Karchulblock Burhar District Shahdol Based On Tube Well Including Installation Of Electric Submersible / Centrifugal Water Motor Pump, Construction Of R.C.C Sump Well, And Fabrication Supply And Erection Of 5Mtr High Steel Staging Structure Including Foundation And 2X5 Kl Polythene Tank With Inlet Outlet And Laying And Jointing Of Rising Main And Distribution Pipe Line System, 100% Household Tap Connections, Construction Of Pump House And Electric Power Connection At Tube Wells Including Cost Of All Materiall And Labour With 90 Days Trial Run / Commissioning Period Of Entire Scheme
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Apr-2023 | corrigendum | Date | 28-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Construction ofNew Piped Water Supply Scheme Under Jal Jeevan Mission at Bodalkachar, Kerha, Daukibudi, Nandtola, Semariha, Jurgu, Padkher, Majhatoliya, Taraidol, Lukampur, Baheradol & KarchulBlock Burhar District Shahdol based on Tube well including installation of electric submersible/centrifugal water motor pump,construction of R.C.C Sump well, and fabrication supply and erection of 5mtr high steel staging structure including foundation and 2x5 kl polythene tank with inlet outlet and laying and jointing of rising main and distribution pipe line system, 100% household tap connections, construction of pump house and electric power connection at Tube wells including cost of all materiall and labour with 90 Days Trial Run/Commissioning period of entire scheme. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender