The Kerala Land Development Corporation Ltd has published Tender For Nabard Ridf Xxvii Infrastructural Development Works At District Agricultural Farm Neriyamangalam In Ernakulam District Phase Ii (Solar Fencing, Chain Link Fencing, Solar Hanging Fencing). Submission Date for this Tender is 26-04-2023. Footpath Work Tenders in ernakulam Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | App A : Solar fencing |
2 | od364728/2022_2023: Supplying, installing and commissioning of ENERGIZER::Should be Battery Operated switch to high, medium and low power settings. Solar panel option to recharge 12-Vol Battery. Auxiliary supply provision for 23 V ac should be there.Should operate at one / different fences independently Should be capable to energize the length of fence up to 5 km. (5 stands) should be suitable for other requirements of the work.Each are shall have is own Energizer and alarming system. Any intrusion/ unwanted activation of the fence should be suitable annunciation with audio alarm system.Operating voltage at 590 k load 10 KV Maximum. Other parametres with 1 K Load,Operating voltage- 6.0 - 8.0 Kv - At High setting O/P energy - 3.5 to 5.1 Peak current - 7.0 - 8.0 Amps at high setting, RMS Current 2.4 - 2.8 Amps at high setting, Output charge - 1.0 - 1.4 million Col - at high setting, Fib Energy - 3.5 - 4.5 MCA - at high setting, pulse duration - 0.01 - 3 million - sec, Pulse interval - 1.1 - 1.4 sec. Should be Battery Operated swtich to high, medium and low power settings. Solar panel option to recharge 12-Vol Battery. Auxiliary supply provision for 23 V ac should be there.Should operate at one / different fences independently Should be capable to energize the length of fence upto 5 km. (5 stands) should be suitable for other requirments of the work.Each arre shll have is own Energizer and alarming system. as per specification Include as per the direction of KLDC officials |
3 | od364729/2022_2023: Supplying, installing and commissioning of Charge Controller Unit 12 V 12AMP. Include as per the direction of KLDC officials |
4 | od364731/2022_2023: Supplying, installing and commissioning of LIGHTNING DIVERTING KIT:Must be capable of diverting stray lightening. The diverter assembly must be adjustable for spark gaps. Lightning diverter kit should be as close as possible to the Energizer Adequate earthing to be provided. Include as per the direction of KLDC officials. Include as per the direction of KLDC officials |
5 | od364732/2022_2023: Supplying of TOOL KIT: Should contain: Wire tightner handle, Twisting tool, Pliers, Double ended spanner for clamp tightning. Include as per the direction of KLDC officials |
6 | od364733/2022_2023: Supplying and installing of 12 V BATTERY CHARGER 10 Amp. Include as per the direction of KLDC officials. |
7 | od364734/2022_2023: Supplying of Digital Volt meter. Include as per the direction of KLDC officials |
8 | od364735/2022_2023: Supplying of multi meter. Include as per the direction of KLDC officials |
9 | od364736/2022_2023: Supplying and installing of LEAD OUT CABLE: Must be double insulated with standing 15 kv voltagages. Inner core wiremust be hot dip galvanized. For under gate and base unit connection. Include as per the direction of KLDC officials |
10 | od364737/2022_2023: Supplying and installing of Joint clamp: Joint clamps Positive locking mechanism Zinc coating of more than 25 microns. Include as per the direction of KLDC officials |
11 | od364738/2022_2023: Supplying and installing of SUPER STRAIN INSULATOR: Strain insulators for End or Corner post: Made of high quality industrial Plastic - Virgin Nylon rated for 15 KV UV stabilized. Reel insulators: made of virgin Polypropylene plastic rated for 15 KV UV stabilized. UV stabilized & Rain water run off should be provided on the insulator. Include as per the direction of KLDC officials |
12 | od364739/2022_2023: Supplying and installing of Winding 14 G WIRE SWG galvanized:14 G WIRE SWG galvanized. Include as per the direction of KLDC officials |
13 | od364740/2022_2023: Supplying and installing of SUPER EARTH KIT: Earthing system Must contain earth mixture capable of retaining moisture. 8 mm. Diametre stainless steel rod, non rusting quality of at least 4 feet length Should be capable of providing proper earthing to the system. Include as per the direction of KLDC officials |
14 | od364741/2022_2023: Supplying and installing of WIRE TIGHTNER In suit tighteners for proper tensioning of wires should be made from A1-alloy non rusting quality:Wire tighteners In suit tighteners for proper tensioning of wires should be made from A1-alloy non rusting quality. Include as per the direction of KLDC officials |
15 | od364742/2022_2023: Supplying and installing of T ANGLE POST 8 FEET LENGTH:Intermediate posts More than 60 microns galvanized "T" section post 8.5 feet long 25 x 25 x 3 mm to be inserted 1.5 feet in ground. Include as per the direction of KLDC officials |
16 | od364743/2022_2023: Supplying and installing of ACSR 12 G WIRE high tensile wire galvanized 230-300 GSM. Include as per the direction of KLDC officials |
17 | od364744/2022_2023: Supplying and installing of REEL INSULATOR made of Polypropylene 15 KV UV stabilized. Include as per the direction of KLDC officials |
18 | od364745/2022_2023: Supplying and installing of 12 V tubular battery, 100 AH: 12 Volts, 100 AH low maintenance Free battery with 4 year replaceable warranty Must be capable of diverting stray lightening. The diverter assembly must be adjustable for spark gaps. Lightning diverter kit should be as close as possible to the Energiser Adequate earthing to be provided.Must be of from reputed companies. Include as per the direction of KLDC officials |
19 | od364746/2022_2023: Supplying and installing of ONE inch G.I Support post (7 feet). Include as per the direction of KLDC officials |
20 | od364747/2022_2023: Supplying and installing of GI CORNER POST 2 INCH 8.50 FEET LONG:Section/ Corner/ End/ pull through posts -50 NR Class "R" pipe 8.5 feet long Hot dip galvanized to more than 60 microns. Stay support 25 mm. diameters with brackets also hot dip galvanized. Must include fasteners. Posts must be grouted 1.5 feet in 2 x 2 x 2 feet size P.C. C in 1:3:6, 20mm. Include as per the direction of KLDC officials |
21 | od364748/2022_2023: Supplying, installing and commissioning of Solar panel 150 Watt 12 V: 150 Watts, 12 Volts rating with minimum 15 years warranty against manufacturing defects, Must be of good efficiency durability and reliable one should be from reputed companies with more than 15 years of experience in solar panel manufacturing. Include as per the direction of KLDC officials |
22 | od364749/2022_2023: Supplying and installing of "C" CLAMP 50 mm HOT DIPPING GALVANIZED for fixing corner and supporting posts. Include as per the direction of KLDC officials |
23 | od364750/2022_2023: Supplying and installing of Warning sign: Warming sign boards, polyethylene plastic with statutory color and signs Yellow with black lettering in local language. Include as per the direction of KLDC officials |
24 | od364751/2022_2023: Knife weeding: Knife weeding heavy growth for clearing through the line 2 meter width. As per FSR Sl no.100 (a)1. |
25 | od364752/2022_2023: VDA :V.D.A for Knife weeding heavy growth F.S.R rate. |
26 | App B: POST FOOTING and INSTALLATION charges |
27 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
28 | od356389/2022_2023 : Installation charges. Fencing line should install as per std specification and from the direction of Officer in charge |
29 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
30 | 13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail