Estimate Towards The Cost Of Raising & Maintenance 2023 Teak Plantation Kulathupuzha (7.5 Ha) In Kalluvarambu Section Of Thenmala Range During 2023-2024, 2024-2025 & 2025-2026
Tender Value
36.58 Lakhs
Estimated cost
Bid Submission
19 Apr 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
2940
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
thenmala → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Estimate Towards The Cost Of Raising & Maintenance 2023 Teak Plantation Kulathupuzha ( 7.5 Ha ) In Kalluvarambu Section Of Thenmala Range During 2023-2024, 2024-2025 & 2025-2026
BOQ
| Sl. No. | Item Description |
| 1 | Slash felling(2022-23) clear felled area |
| 2 | Heaping and burning where elephant power is not available |
| 3 | Collection of 60cm bamboo, reed or wooden stakes for aligning |
| 4 | Transport of stakes by hired vehicle from Kattilappara |
| 5 | Head load transport of stakes beyond 400 mm |
| 6 | Aligning and staking at an espacement of 2m x 2m |
| 7 | Digging pits of size 30x30x30 cm in Ordinary/hard soil for poly bag/root trainer seedlings. ordinary soil before rain/100pits |
| 8 | Digging pits of size 30x30x30 cm in Ordinary/hard soil for poly bag/root trainer seedlings. ordinary soil After rain/100pits |
| 9 | TransportingRoot Trainer Seedlings from Central Nursery Kulathupuzha to Kattilapapra Planting Site( Quantity 20625=10000/-) |
| 10 | Loading and stacking root trainer with seedlings into lorry on erected multitier standfor transportation |
| 11 | Unloading root trainer trays with seedlings and arranging at planting site |
| 12 | Loading empty traysfrom planting sits unloading at Central Nursery Cleaning and stacking at storage shed |
| 13 | Head load transport of seedlings from transporting site to planting site for average lead of 400 m |
| 14 | Covering pits, digging planting holes & planting seedlings |
| 15 | Makingplatform of size 60cm x 60 cm with 30 cm depth in uphill side with inward slopes |
| 16 | First year 1st weeding (Knife weeding) during May- June |
| 17 | Replacing casualties |
| 18 | Cost of chemical fertilizer @ 75 gram per plant |
| 19 | Loading, unloading and transportation of the fertilizer to the site of plantation |
| 20 | Application of chemical fertilizer aftersoil test during August- September |
| 21 | First year 2nd weeding (Knife weeding) |
| 22 | First year 3rd weeding (Knife weeding) |
| 23 | Additional Weeding (Subject to the approval of CCF) |
| 24 | Clearing fire line to a width of 5.2 M and fire tracing |
| 25 | Construction of temporary shed for the stay of staff and labours ( 10 m2= 5000/-) |
| 26 | Engaging Mazdoor For the general protection for the plantation |
| 27 | VDA(Subject to actuals) |
| 28 | Cost of plantation board |
| 29 | Second year first weeding |
| 30 | Transportation charges of one year old Bigger Basketted Teak Seedlings |
| 31 | Loading and Unloading charges of Bigger Basketted Teak Seedlings |
| 32 | Replacing casualties |
| 33 | Repairing damaged platforms 60x 60x 30(May- June) |
| 34 | Loading, unloading and transportation of the fertilizer to the site of plantation |
| 35 | Cost of chemical fertilizer @ 75 gram per plant |
| 36 | Application of fertilizer during August - September (Subject to soil test and field requirement ) |
| 37 | Second year second weeding |
| 38 | Second year third weeding |
| 39 | Additional weeding (Allowed subject to CCF\"s field inspection) |
| 40 | Clearing boundary line to a width of 5.2m for fire tracing |
| 41 | Construction of temporary shed for the stay of staff and labours( Quantity - 10 M2= 5000/-) |
| 42 | Engaging Mazdoor For the general protection for the plantation |
| 43 | VDA |
| 44 | Third year first weeding in very high weed growing area (May -June) |
| 45 | Repairing damaged platforms 60x 60x 30(May- June) Allowed as per the CCFs inspection/ subjected to actualrequirement |
| 46 | Transportation charges of one year old Bigger Basketted Teak Seedlings |
| 47 | Loading and Unloading charges of Bigger Basketted Teak Seedlings |
| 48 | Replacing casualties (June) |
| 49 | Third year second weeding (Sept.-Oct) |
| 50 | Third year additional weeding (Allowed subject to CCF\"s field inspection) |
| 51 | Clearing boundary line to a width of 5.2m for fire tracing |
| 52 | Maintenance of temporary shed |
| 53 | Engaging Mazdoor For the general protection for the plantation |
| 54 | VDA |
| 55 | Contractors Profit ( 10%) |
AI Tender Summary
Tender Timeline
Apr 12, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedApr 19, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 22, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender