| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 2 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. |
| 3 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.2 mm thick |
| 4 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete, on concrete work. |
| 5 | providing and laying of 20mm thick Cement plaster of mix 1:4 on external works. |
| 6 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand),Raised and cut pointing. |
| 7 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete, on steel work. |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).including carraige of 9 km. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
| 10 | Providing and laying50 mm thick coping with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete.including carraige of 9 km. |
| 11 | Kota stone slab flooring 25 mm thick over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing, polishing and curing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) : |
| 12 | Kota stone slab 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm ( average) thick cement mortar 1:3 (1 cement:3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing, polishing and curing complete. |
| 13 | steel work in built up sections,framed work, including cutting, fixing in position and applying a priming coat of approved steel for drainage cover, primer all complete.Welded |
| 14 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment). |