Rasipiram Municipality-agecode007 has published Tender For Extension Of Distribution Sewer Line And Manhole In Bommi Street, Kamatchi Amman Kovil Street, Lingappa Street, Karnam Lane & Village Municipal Lane, Ram Nagar Cross At Rasipuram Municipality.. Submission Date for this Tender is 17-04-2023. Sewerage Construction Tenders in rasipuram Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earthwork excavation in Hard stiff clay,stiff black cotton soil, hard red earth, shales, murams, gravel, stoney earth, and earth mixed with 50% fair size boulders and hard gravelly soil -SS20B for laying sewer pipes (IS 3764: 1992) excluding refilling,but includinghand bailing out water wherever necessary and all other incidental charges. etc. completeand as directed by the Engineer in charge. |
2 | Soft disentegrated rock, soft laterited rock or kankar soft rock not requiring blasting.including al cost of materials,labours, etc., complete with as per standard specifications-Collection sewer main. |
3 | Removing of Hard Rock by wedging & chiselling and trimming where blasting is prohibited including all cost of materials, labours, etc., complete with as per standard specification. (sewer main.) |
4 | Construction ofUGSS manhole cover upto proposed road level of size 0.90mx1.20m Upto 0.75M to 1.50M hight including cost of Earth excavation, steel, centeringand shuttering, RCC1:1.5:3 mix (One cement, one and half and three coare aggregate) using 20mm ISS size HBG metak for wall and PCC1:1.5:3 mix (One cement, one and half sand and three coarse aggreagate) using 20mm ISS size HBG metal, New FRCC extra heavy manhole cover set etc., including cost and conveyance of all materials to site, labours charges fixing of manhole cover etc., Complete as directed by the departmental officers. |
5 | 1.00M Depth |
6 | 1.50M Depth |
7 | 2.00M Depth |
8 | Supply and delivery of UPVC pipes for sewerage SN8-SDR 34(S 16.5) conforming to IS : 15328/2003 including Unloading, stacking at stock yard and Conveyance from stock yard to site etc.,completeas directed by the departmental officers. |
9 | 160 mm dia UPVC Pipe |
10 | 110mm PVC Pipe |
11 | Lowering 160mm dia UPVC pipe and specials to trench and laying to proper grade and alignment and as directed by the departmental officers. |
12 | 160 mm dia UPVC Pipe |
13 | 110mm PVC Pipe |
14 | Refilling excavated earth other than sand compliying with standard specification including materials, labour for filling charges,consolidation etc. complete as directed by the departmental officers. |
15 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers |