Tender For Deepening And Construction Of Baby Pond With Retaining Wall And Bathing Ghat At Eswaran Koil Kulam (Sf No 399), (U15123838p169a3) H/O Poigainallur Panchayat In Nemili Block, Ranipet District 2Nd Call
Tender Value
9.77 Lakhs
Estimated cost
Bid Submission
17 Apr 2023
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nemili → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Deepening And Construction Of Baby Pond With Retaining Wall And Bathing Ghat At Eswaran Koil Kulam ( Sf No 399 ) , ( U15123838p169a3 ) H / O Poigainallur Panchayat In Nemili Block, Ranipet District 2Nd Call
BOQ
| Sl. No. | Item Description |
| 1 | Nemili Block |
| 2 | 1.Deepening & Desilting construction Of Retaining wall for Baby pond , construction of bathing ghat Construction of step over tank bund improvement to Eswaran Kovil Kulam in Poigainallur Panchayat in nemili block, Ranipet District |
| 3 | Clearingthescrubjungle,JullifloraJungleanddisposingofthesameasdirectedbytheEngineer incharge of works and as per technical specification [ specification 2.2] |
| 4 | Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete |
| 5 | Total Earthwork Quantity |
| 6 | ChannelEarthwork Quantity |
| 7 | Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m |
| 8 | Construction of Retaining wall for Baby Pond |
| 9 | Earthworkexcavationanddepositingonbank with initial lead and lift in hard gravelly soil, hard stiffclay, blackcottonsoil,hardredearth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 10 | Cement Concrete 1:4:8 mix using 40mm metal includingcostandconveyanceofallmaterialsto work site and all labour charges etc. |
| 11 | Supplyinganderectingcenteringshutteringwith necessarysupportsincluding cost and conveyance and all labour charges etc. |
| 12 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 13 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 14 | Construction of Bathing Ghat, Steps, Outer Platform |
| 15 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 16 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 17 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. |
| 18 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 19 | CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 20 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 21 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 22 | Construction of Steps over Bund |
| 23 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 24 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 25 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. |
| 26 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 27 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 28 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 29 | Arrangements for Revetment |
| 30 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 31 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 32 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. Below GL |
| 33 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 34 | Supply suitable gravel and providing gravel packing 15cm thick for revetment |
| 35 | Rough stone dry packing for revetment and apron using new stone obtained by approved sources |
| 36 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Apr 11, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedApr 17, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 17, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender