Tender For Construction Of Outlets (1) 4 Nos In Bagodar Branch Canal (2) 4 Nos In Banpura Distributary (3) 2 Nos Nawadih Distributary Under Konar Canal Division, Bagodar., bagodar-Jharkhand

Water Resources Department-WRD has published Tender For Construction Of Outlets (1) 4 Nos In Bagodar Branch Canal (2) 4 Nos In Banpura Distributary (3) 2 Nos Nawadih Distributary Under Konar Canal Division, Bagodar.. Submission Date for this Tender is 02-05-2023. Canal Construction Tenders in bagodar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

37191678
Tender For Construction Of Outlets (1) 4 Nos In Bagodar Branch Canal (2) 4 Nos In Banpura Distributary (3) 2 Nos Nawadih Distributary Under Konar Canal Division, Bagodar.
Open Tender
Indian
Jharkhand
bagodar
02-05-2023

Tender Details

Construction Of Outlets ( 1 ) 4 Nos In Bagodar Branch Canal ( 2 ) 4 Nos In Banpura Distributary ( 3 ) 2 Nos Nawadih Distributary Under Konar Canal Division, Bagodar.

Key Value

Document Fees
INR 5000 /-
EMD
INR 64000.0 /-
Tender Value
INR 31.88 Lakhs /-

BOQ Items

Name of Work: Construction ofOutlets (1) 4 No"s in Bagodar Branch Canal (2) 4 No"s in Banpura Distributary (3) 2 No"s Nawadih Distributaryunder Konar Canal Division, Bagodar.
Sl. No. Item Description
1Earthwork in excavation of foundation trenches in ordinary soil (vide classification of soil item –A) and disposal of excavated earth so obtained to a distance upto 50M and average lift of 1.5M including leveling, ramming the foundation trenches, removing the roots or shrubs etc. all complete as per specification and direction of E/I.SR no 7.1.27 WRD SORPart BP.No-135
2Extra for earthwork in hard soil (vide classification of soil item- B) all complete as per specification and direction of E/I. (7.1.10) WRD SORPart B P.No-133
3Extra for earthwork for each subsequent lift of 1M over the initial lift of 1.5 M for ordinary and hard soil(vide classification of soil item A and B) all complete as per specification and direction of E/I. (7.1.34.1) WRD SORPart BP.No-136
4Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty complete job as per specification and direction of E/IWRD SORPart BP.No- 137(7.1.37)
5PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days) (R.C.D. 12.04) Page No.- 477
6Plain / Reinforced cement concrete in open foundation complete as per drawing and technical specifications Grade M 15 PCC Grade M15 using batching plant & manual placing(R.C.D. 12.08 A CASE(II)) Page No.- 477
7Plain / Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M 20 RCC Grade M20 using batching plant,transit mixer & manual placing (R.C.D. 12.08 C CASE(II))
8providing Tor steel reinforcement of 10mm,12mm & 16 mm dia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position( including carriage of bars to work site) all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for tata ,SAIL,JSPL,Electrosteel steels Ltd. Bokaro and Vizag (RINL))(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)})
9providing Tor steel reinforcement of 10mm,12mm & 16 mm dia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position( including carriage of bars to work site) all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for tata,SAIL,JSPL,Electrosteel steels Ltd. Bokaro and Vizag (RINL))(b) 12mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)})
10providing Tor steel reinforcement of 20 mm,25 mm,28 mm, 32 mmdia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position( including carriage of bars to work site) all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for tata ,SAIL,JSPL,Electrosteel steels Ltd. Bokaro and Vizag (RINL))(a)20/ 25 mmdia TMT bar Fe 500 (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)})
11Supply NP2 R.C.C. Hume Pipe with collar as per I.S.S.458-1971 M300 (v) 300 mm Dia. WRD Page No.- 84
12Supply NP2 R.C.C. Hume Pipe with collar as per I.S.S.458-1971 M300 (vi) 450 mm Dia. WRD Page No. 84
13Labour for laying, fitting and fixing NP2 hume pipe with collars in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them water proof, all complete, as per specification and direction of E/I. For 300 mm dia WRD Part B Page No. - 149 7.6.1.3
14Labour for laying, fitting and fixing NP2 hume pipe with collars in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them Leak proof, all complete job, as per specification and direction of E/I. For 450 mm diaWRD Part B Page No. - 149
15Earth work in filling foundation trenches and back filling ofstructuresin layers not exceeding 150mm thick well watered, rammed and fully compacted and finely dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile with a lead of 30m andlift of 1.5m complete job as per specification and direction of E/I. WRD Part B Page No. - 136 7.1.31
16supplying and laying good quality of stone metal filter (20 mm to 63 mm size) in the rock toe, heel trenches ,toe drain as per design and drawing including the cost of materials, royalty, all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.PART A (6.3)
17Supplying of stone boulder with minimum sizeof 300mm for Pitching with stacking all complete.WRD Page No.-81 M- 018
18Labour charge for pitching on apron slope of bank with stone boulders duly packed (uncrated) complete job (materials within 150Mand all lifts as per specification and direction of E/I.WRD P.NO. 1517.7.18
19Carriage of Materials BBC Loading and Unloading of Cement or Steel by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
20Haulage of cement materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 03 km x 30.19 Sl. No. - 1.04 (i) A Page No.- 192JSR July 22 SL
21Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Cement materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 30.19 Sl.No. - 1.04 (iii) A Page No.- 193JSR July 22 SL
22Loading and unloading of stone boulder/stone aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
23Haulage of sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 18 km x 57.771 JSR July 22 SL
24Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 57.771 JSR July 22 SL
25Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
26Haulage of stone aggregates materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road 33 km x 115.54 JSR July 22 SL NO-1.04 (1)A page-192
27Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone aggregates materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 115.545JSR July 22 SL NO-1.04(i)A page-192
28Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
29Haulage of boulder materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road. 33 km x 4.704 JSR July 22 SL NO-1.04 (1)A page-192
30Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of boulder materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 4.704JSR July 22 SL NO-1.04(i)A page-192
31Loading and unloading of stone boulder/stone aggregates/sand (Local sand) /kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
32Haulage of Local sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 07 km x 15.424JSR July 22 SL
33Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of Local sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 15.424 JSR July 22 SL
34Loading and unloading of stone boulder/stone (Stone Metal Filter) aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
35Haulage of stone (Stone Metal Filter)materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case- Surfaced Road 33 km x 3.136 JSR July 22 SL
36Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone (Stone Metal Filter) materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 3.136 JSR July 22 SL
37Loading and Unloading of Hume pipe (NP4) by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
38Haulage of Hume pipe materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 58 km x 7.27 Sl. No. - 1.04 (i) A Page No.- 192 JSR July 22 SL
39Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Hume pipematerials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 7.27Sl.No. - 1.04 (iii) A Page No.-193JSR July 22
40BANPURA Loading and Unloading of Cement or Steel by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
41Haulage of cement materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 03 km x 23.38 Sl. No. - 1.04 (i) A Page No.- 192JSR July 22 SL
42Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Cement materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 23.38 Sl.No. - 1.04 (iii) A Page No.- 193JSR July 22 SL
43Loading and unloading of stone boulder/stone aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
44Haulage of sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 14 km x 44.86208 JSR July 22 SL
45Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 44.86208 JSR July 22 SL
46Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
47Haulage of stone aggregates materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road 33 km x 115.54 JSR July 22 SL NO-1.04 (1)A page-192 (1)A page-192
48Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone aggregates materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 89.724JSR July 22 SL NO-1.04(i)A page-192
49Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
50Haulage of boulder materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road. 33 km x 4.704 JSR July 22 SL NO-1.04 (1)A page-192
51Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of boulder materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 4.704JSR July 22 SL NO-1.04(i)A page-192
52Loading and unloading of stone boulder/stone aggregates/sand (Local sand) /kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
53Haulage of Local sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 07 km x 11.9232JSR July 22 SL
54Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of Local sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 11.9232 JSR July 22 SL
55Loading and unloading of stone boulder/stone (Stone Metal Filter) aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
56Haulage of stone (Stone Metal Filter)materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case- Surfaced Road 33 km x 3.136 JSR July 22 SL
57Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone (Stone Metal Filter) materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 3.136 JSR July 22 SL
58Loading and Unloading of Hume pipe (NP4) by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
59Haulage of Hume pipe materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 58 km x 4.43 Sl. No. - 1.04 (i) A Page No.- 192JSR July 22 SL
60Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Hume pipe materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x4.43Sl.No. - 1.04 (iii) A Page No.-193JSR July 22
61NAWADIH Loading and Unloading of Cement or Steel by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
62Haulage of cement materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 01 km x 18.71 Sl. No. - 1.04 (i) A Page No.- 192JSR July 22 SL
63Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Cement materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 18.71 Sl.No. - 1.04 (iii) A Page No.- 193JSR July 22 SL
64Loading and unloading of stone boulder/stone aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
65Haulage of sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 14 km x 35.904 JSR July 22 SL
66Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 35.904 JSR July 22 SL
67Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
68Haulage of stone aggregates materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road 30 km x 71.808 JSR July 22 SL NO-1.04 (1)A Page -192
69Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone aggregates materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 71.808JSR July 22 SL NO-1.04(i)A page-192
70Loading and unloading of stone boulder/stone aggregates / sand / kanker / moorum.(Tipper- 5.5cum capacity)Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip JSR July 22 SL NO-1.01 page-192
71Haulage of boulder materials by tipper (10) tonne capacity) excluding cost of loading, unloading and stacking 1) A.Case-1: Surfaced Road. 30 km x 2.592 JSR July 22 SL NO-1.04 (1)A page-192
72Case-lll: Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of boulder materials by tipper(10) tonne capacity) excluding cost of loading, unloading and stacking 1 km x 2.592JSR July 22 SL NO-1.04(i)A page-192
73Loading and unloading of stone boulder/stone aggregates/sand (Local sand) /kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
74Haulage of Local sand materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case-Surfaced Road 06 km x 8.31168JSR July 22 SL
75Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of Local sand materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 8.31168 JSR July 22 SL
76Loading and unloading of stone boulder/stone (Stone Metal Filter) aggregates/sand/kanker/moorum (Tipper-5.5cum capacity)Placing tipper at loading point, loading with frant end loader, dumping turning for return trip, excluding time for haulage and return trip Sl.No. - 1.01A Page No.- 192 JSR July 22 SL
77Haulage of stone (Stone Metal Filter)materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking. 1) A.Case- Surfaced Road 30 km x 1.728 JSR July 22 SL
78Katcha Track and Track in river bed/nallah bed and choe bed.Haulage of stone (Stone Metal Filter) materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 1.728 JSR July 22 SL
79Loading and Unloading of Hume pipe (NP4) by Mannual means and stacking (Truck - 10 Tonns capacity). Sl. No. - 1.03 Page No.- 192JSR July 22 SL
80Haulage of Hume pipe materials by tipper (10 tonne capacity) excluding cost of loading, unloading and stacking )A. Case-1: Surfaced Road 58 km x 8.76 Sl. No. - 1.04 (i) A Page No.- 192 JSR July 22 SL
81Case3: Katcha Track and Track in river bed/nallah bed and choe bed. Haulage of Hume pipe materials by tipper(10 tonne capacity) excluding cost of loading, unloading and stacking 1 km x 8.76Sl.No. - 1.04 (iii) A Page No.- 193JSR July 22
82Add GST 18% of Total Amount
83Add Labour Cess 1% of Total Amount
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail