Repair, Replacement & Maintenance Work Of Instrument Like Dvdf, Oven, Ht/Lt Binding Machine Etc. At Repairing Workshop Major,Dph Varanasi, Saidpur Ghazipur,Ghazipur,Jaunpurand Sahupuri Under Ewd Varanasi
Tender Overview
Project Description
Repair, Replacement & Maintenance Work Of Instrument Like Dvdf, Oven, Ht / Lt Binding Machine Etc. At Repairing Workshop Major, Dph Varanasi, Saidpur Ghazipur, Ghazipur, Jaunpurand Sahupuri Under Ewd Varanasi- 1 Heating Chamber ( Oven ) 2 Providing & Installation Of 2 Kv Heating Element ( Oven ) [ Isi Mark ] 3 Providing & Installation Of Contactor 40 Amp. [ Seimens / Schneider Make ] 4 Providing & Installation Of Contactor 63 Amp. [ Seimens / Schneider Make ] 5 Providing & Installation Of Contactor 18 Amp. [ Seimens / Schneider Make ] 6 Providing & Installation Of Belt V-Type 7 Providing & Installation Of Single Phasing Preventer ( 415V Ac ) 8 Providing & Installation Of Kit-Kat 200 Amp. 9 Providing & Installation Of Theromostat 10 Oven Contactor Coil 11 Providing & Installation Of 40 Amp [ Seimens / Schneider Make ] 12 Providing & Installation Of 63 Amp [ Seimens / Schneider Make ] 13 Providing & Installation Of 18 Amp [ Seimens / Schneider Make ] 14 Motor Rewinding / Repairing 15 Providing & Installation Of Mcb 63 Amp [ Isi Mark ] 16 Providing & Installation Of Glass Wire 2.5 Mm 17 Labour Charges For Misllaneous Works 18 Dvdf-Set 19 Providing & Installation Of Meter Requlator [ Isi Mark ] 20 Providing & Installation Of Timer 21 Providing & Installation Of Frequency Meter [ Isi Mark ] 22 Providing & Installation Of Volt Meter [ Isi Mark ] 23 Providing & Installation Of Amp. Meter [ Isi Mark ] 24 Motor Rewinding 25 Armeture Rewinding 26 High Voltage-Set 27 Providing & Installation Of Voltage Regulator [ Isi Mark ] 28 Providing & Installation Of Amp. Meter [ Isi Mark ] 29 Providing & Installation Of Volt Meter [ Isi Mark ] 30 Providing & Installation Of Bell 31 Providing & Installation Of Transformer 12.012 32 Power Analyser-Set 33 Repairing Of Transformer 34 Repairing Of Varriac 35 Providing & Installation Of Contactor Back Ml-4 36 Providing & Installation Of Volt Meter [ Isi Mark ] 37 Providing & Installation Of Ammeter [ Isi Mark ] 38 Ht Winding Machine 39 Providing & Installation Of Turn Counter Meter 40 Providing & Installation Of Reverse / Forward Switch 41 Providing & Installation Of Belt ( A-57, A-5X, A-40 ) 42 Providing & Installation Of Ball Bearing 43 Providing & Installation Of Coupling Rubber 44 Providing Mobil Oil 45 Motor Rewinding 46 Lt Winding Machine 47 Providing & Installation Of Turn Counter Meter 48 Providing & Installation Of Reverse / Forward Switch 49 Providing & Installation Of Foot Switch 50 Providing & Installation Of Ball Bearing 51 Providing & Installation Of Belt ( A-57, A-5X, A-40 ) 52 Providing & Installation Of Contractor 63 Amp. 53 Providing & Installation Of Gear Oil 54 Motor Rewinding 55 Repairing Of Gear Box 56 Hydraulic Trolley. 57 Providing & Installation Of Hydraulic Kit Back & Front. 58 Providing & Installation Ofbearing. 59 Providing & Installation Ofbig Shaft. 60 Providing & Installation Ofsmall Shaft. 61 Providing & Installation Ofdall Pin. 62 Providing & Installation Ofhydraulic Oil. 63 Providing & Installation Ofbig Wheel. 64 Providing & Installation Ofsmall Wheel. 65 Providing & Installation Ofhouging Wheel Shaft. 66 Providing & Installation Ofrepit. 67 Providing & Installation Ofclutch Chain. 68 Providing & Installation Ofbig Lock. 69 Providing & Installation Ofhandle Lock. 70 Providing & Installation Ofwheel Lock. 71 Chain Tickle & Weighing Machine. 72 Repairing Of Chain Tickle Including Labour Charge. 73 Repairing Of Weighing Machine Including Labour Charge.
BOQ
| Sl. No. | Item Description |
| 1 | Heating Chamber (Oven) |
| 2 | Porviding & Installation of 2 KV Heating Element (Oven) [ISI mark] |
| 3 | Porviding & Installation of Contactor 40 Amp.[ SEIMENS/SCHNEIDER Make] |
| 4 | Porviding & Installation of Contactor 63 Amp.[ SEIMENS/SCHNEIDER Make] |
| 5 | Porviding & Installation of Contactor 18 Amp.[ SEIMENS/SCHNEIDER Make] |
| 6 | Porviding & Installation of Belt V-type |
| 7 | Porviding & Installation of Single Phasing Preventer (415V AC) |
| 8 | Porviding & Installation of Kit-Kat 200 Amp. |
| 9 | Porviding & Installation of Theromostat |
| 10 | Oven Contactor Coil |
| 11 | Porviding & Installation of 40 Amp [ SEIMENS/SCHNEIDER Make] |
| 12 | Porviding & Installation of 63 Amp [ SEIMENS/SCHNEIDER Make] |
| 13 | Porviding & Installation of 18 Amp [ SEIMENS/SCHNEIDER Make] |
| 14 | Motor Rewinding/Repairing |
| 15 | Porviding & Installation of MCB 63 Amp [ISI mark] |
| 16 | Porviding & Installation of Glass Wire 2.5 MM |
| 17 | Labour Charges for misllaneous works |
| 18 | DVDF-SET |
| 19 | Porviding & Installation of Meter Requlator [ISI mark] |
| 20 | Porviding & Installation of Timer |
| 21 | Porviding & Installation of Frequency Meter [ISI mark] |
| 22 | Porviding & Installation of Volt Meter [ISI mark] |
| 23 | Porviding & Installation of Amp. Meter [ISI mark] |
| 24 | MotorRewinding |
| 25 | Armeture Rewinding |
| 26 | High Voltage-SET |
| 27 | Porviding & Installation of Voltage Regulator [ISI mark] |
| 28 | Porviding & Installation of Amp. Meter [ISI mark] |
| 29 | Porviding & Installation of Volt Meter [ISI mark] |
| 30 | Porviding & Installation of Bell |
| 31 | Porviding & Installation of Transformer 12.012 |
| 32 | Power Analyser-SET |
| 33 | Repairing of Transformer |
| 34 | Repairingof Varriac |
| 35 | Porviding & Installation of Contactor Back ML-4 |
| 36 | Porviding & Installation of Volt Meter [ISI mark] |
| 37 | Porviding & Installation of Ammeter [ISI mark] |
| 38 | HT WINDING MACHINE |
| 39 | Porviding & Installation of Turn Counter Meter |
| 40 | Porviding & Installation of Reverse/Forward Switch |
| 41 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 42 | Porviding & Installation of Ball Bearing |
| 43 | Porviding & Installation of Coupling Rubber |
| 44 | Porviding Mobil oil |
| 45 | Motor Rewinding |
| 46 | LT WINDING MACHINE |
| 47 | Porviding & Installation of Turn Counter Meter |
| 48 | Porviding & Installation of Reverse/Forward Switch |
| 49 | Porviding & Installation of Foot Switch |
| 50 | Porviding & Installation of Ball Bearing |
| 51 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 52 | Porviding & Installation of Contractor 63 Amp. |
| 53 | Porviding & Installation of Gear oil |
| 54 | Motor Rewinding |
| 55 | Repairing of Gear Box |
| 56 | Hydraulic Trolley. |
| 57 | Porviding & Installation of Hydraulic kit back & front. |
| 58 | Porviding & Installation ofBearing. |
| 59 | Porviding & Installation ofBig shaft. |
| 60 | Porviding & Installation ofSmall shaft. |
| 61 | Porviding & Installation ofDall pin. |
| 62 | Porviding & Installation ofHydraulic oil. |
| 63 | Porviding & Installation ofBig wheel. |
| 64 | Porviding & Installation ofSmall wheel. |
| 65 | Porviding & Installation ofHouging wheel shaft. |
| 66 | Porviding & Installation ofRepit. |
| 67 | Porviding & Installation ofClutch chain. |
| 68 | Porviding & Installation ofBig lock. |
| 69 | Porviding & Installation ofHandle lock. |
| 70 | Porviding & Installation ofWheel lock. |
| 71 | Chain Tickle & Weighing Machine. |
| 72 | Repairing of Chain Tickle including labour charge. |
| 73 | Repairing of Weighing Machine including labour charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender