|
| 1 | Heating Chamber (Oven) |
| 2 | Porviding & Installation of 2 KV Heating Element (Oven) [ISI mark] |
| 3 | Porviding & Installation of Contactor 40 Amp.[ SEIMENS/SCHNEIDER Make] |
| 4 | Porviding & Installation of Contactor 63 Amp.[ SEIMENS/SCHNEIDER Make] |
| 5 | Porviding & Installation of Contactor 18 Amp.[ SEIMENS/SCHNEIDER Make] |
| 6 | Porviding & Installation of Belt V-type |
| 7 | Porviding & Installation of Single Phasing Preventer (415V AC) |
| 8 | Porviding & Installation of Kit-Kat 200 Amp. |
| 9 | Porviding & Installation of Theromostat |
| 10 | Oven Contactor Coil |
| 11 | Porviding & Installation of 40 Amp [ SEIMENS/SCHNEIDER Make] |
| 12 | Porviding & Installation of 63 Amp [ SEIMENS/SCHNEIDER Make] |
| 13 | Porviding & Installation of 18 Amp [ SEIMENS/SCHNEIDER Make] |
| 14 | Motor Rewinding/Repairing |
| 15 | Porviding & Installation of MCB 63 Amp [ISI mark] |
| 16 | Porviding & Installation of Glass Wire 2.5 MM |
| 17 | Labour Charges for misllaneous works |
| 18 | DVDF-SET |
| 19 | Porviding & Installation of Meter Requlator [ISI mark] |
| 20 | Porviding & Installation of Timer |
| 21 | Porviding & Installation of Frequency Meter [ISI mark] |
| 22 | Porviding & Installation of Volt Meter [ISI mark] |
| 23 | Porviding & Installation of Amp. Meter [ISI mark] |
| 24 | MotorRewinding |
| 25 | Armeture Rewinding |
| 26 | High Voltage-SET |
| 27 | Porviding & Installation of Voltage Regulator [ISI mark] |
| 28 | Porviding & Installation of Amp. Meter [ISI mark] |
| 29 | Porviding & Installation of Volt Meter [ISI mark] |
| 30 | Porviding & Installation of Bell |
| 31 | Porviding & Installation of Transformer 12.012 |
| 32 | Power Analyser-SET |
| 33 | Repairing of Transformer |
| 34 | Repairingof Varriac |
| 35 | Porviding & Installation of Contactor Back ML-4 |
| 36 | Porviding & Installation of Volt Meter [ISI mark] |
| 37 | Porviding & Installation of Ammeter [ISI mark] |
| 38 | HT WINDING MACHINE |
| 39 | Porviding & Installation of Turn Counter Meter |
| 40 | Porviding & Installation of Reverse/Forward Switch |
| 41 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 42 | Porviding & Installation of Ball Bearing |
| 43 | Porviding & Installation of Coupling Rubber |
| 44 | Porviding Mobil oil |
| 45 | Motor Rewinding |
| 46 | LT WINDING MACHINE |
| 47 | Porviding & Installation of Turn Counter Meter |
| 48 | Porviding & Installation of Reverse/Forward Switch |
| 49 | Porviding & Installation of Foot Switch |
| 50 | Porviding & Installation of Ball Bearing |
| 51 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 52 | Porviding & Installation of Contractor 63 Amp. |
| 53 | Porviding & Installation of Gear oil |
| 54 | Motor Rewinding |
| 55 | Repairing of Gear Box |
| 56 | Hydraulic Trolley. |
| 57 | Porviding & Installation of Hydraulic kit back & front. |
| 58 | Porviding & Installation ofBearing. |
| 59 | Porviding & Installation ofBig shaft. |
| 60 | Porviding & Installation ofSmall shaft. |
| 61 | Porviding & Installation ofDall pin. |
| 62 | Porviding & Installation ofHydraulic oil. |
| 63 | Porviding & Installation ofBig wheel. |
| 64 | Porviding & Installation ofSmall wheel. |
| 65 | Porviding & Installation ofHouging wheel shaft. |
| 66 | Porviding & Installation ofRepit. |
| 67 | Porviding & Installation ofClutch chain. |
| 68 | Porviding & Installation ofBig lock. |
| 69 | Porviding & Installation ofHandle lock. |
| 70 | Porviding & Installation ofWheel lock. |
| 71 | Chain Tickle & Weighing Machine. |
| 72 | Repairing of Chain Tickle including labour charge. |
| 73 | Repairing of Weighing Machine including labour charge. |