Rural Development Government Departments Closing in 0 days TDR #37156436

Tender For Construction Of Hl Rcc Bridge Over Patro River Between Deoghar Bad And Barhi Ghat Under Sarath Block In Deoghar Dist.

Issued by Government Departments · sarath, Jharkhand
Tender Value
10.69 Crore
Estimated cost
Bid Submission
15 Apr 2023
0 days left
EMD
21.38 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sarath → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Hl Rcc Bridge Over Patro River Between Deoghar Bad And Barhi Ghat Under Sarath Block In Deoghar Dist.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 08-Apr-2023 TenderDocumentsSBD Other 15-Apr-2023

BOQ

Name of Work: Construction of HL RCC Bridge Over Patro River Between Deoghar Bad and Barhi Ghat under Sarath Block in Deoghar Dist.
Sl. No. Item Description
1Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary Rock ( not requiring blasting)Mechanical MeansDepth upto 3 m
2Levelling Course for Pile capProviding and laying of PCC M15 levelling course 100 mm thick below the pile cap.PCC Grade M15 using batching plant & Concrete pump
3Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm
4Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical SpecificationRCC Grade M25 RCC Grade M25 using batching plant & Concrete pump
5Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary Rock ( not requiring blasting)Mechanical Means
6Filling Annular Space around footing in rock
7PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
8Plain/ReinfocedCement concrete in open foundation complete as per drwaing and technical specifications.RCC Grade M25RCC Grade M25 using batching plant,transit mixer & Concrete pump
9Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
10Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
11Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specificationsRCC Grade M25RCC Grade M25 using batching plant, transit mixer & concrete pumpSub-Total For Upto 5 m=
12Sub-Total For 5 m to 10 m=
13Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications
14Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications
15Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
16Back filling behind abutment, wing wall, return wall complete as per drawing and technical specificationsSandy material
17Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full heightcompacted to a firm condition complete as per drwaing and technical specification.
18RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump.For T-beam & slab, 25-35 per centof (a+b+c) Height 5m to 10m
19Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
20Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
21Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
22Drainage Spouts complete as per drawing and Technical specification
23PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specificationPCC Grade M15 using batching plant & Concrete pump
24Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
25Strip Seal Expansion JointProviding and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.
26Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.Stone/Boulder
27Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
28Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specificationsPCC Grade M20Height upto 5mPCC Grade M20 using batching plant, transit mixer & concrete pump
29Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.By Manual means:- In area of thorny jungle
30Construction of Embankment with Material obtained from Borrow pits.Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
31CompactingOriginal groundCompactingOriginal ground supporting sub-gradeLoosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.
32Granular Sub-Base with Graded Material (Table:- 400-1)By Mix in Place MethodConstruction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Rate per cum for grading-IMaterial
33Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
34Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
35Tack Coat on Bituminous surfacesProviding and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
36Open-Graded Premix SurfacingProviding, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.
37Seal CoatCase-II : Type BProviding and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade.
38Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.Stone/Boulder
39Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary Rock ( not requiring blasting)Mechanical Means
40Sand Filling in foundation trenches as per drawing & technical specification
41PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
42Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.Random Rubble masonry (coursed/uncoursed)
43Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specificationsRandom Rubble Masonry (Coursed/uncoursed)
44Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
45Pointing with cement mortar (1:3) on brick work in substrucutre as per technical specifications
46Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specificationsPCC Grade M20Height upto 5mPCC Grade M20 using batching plant, transit mixer & concrete pump For Coping
47Carriage of MaterialSand (Kherghat) - 4 KM
48Cement (Deoghar) - 50 KM
49Boulder (Domchanch) - 28 KM
50Aggregate (Domchanch) - 102 KM
51Steel (Deoghar) - 50 KM
52Bitumen (Bokaro) - 171 KM
53Bitumen Emulsion (Bokaro) - 171 KM
54GST @ 18%
55Labour cess @ 1%

AI Tender Summary

OUR REF NO 37156436
AUTHORITY Government Departments
TENDER VALUE 10.69 Crore
LAST DATE 15-04-2023
Authority
Authority Name Rural Development Department
Work Description Construction Of Hl Rcc Bridge Over Patro River Between Deoghar Bad And Barhi Ghat Under Sarath Block In Deoghar Dist.
Basic Detail
Tender No RDD/SD/DEOGHAR/17/2022-23 ( G-2)
Bidding Type Tender
Location
City sarath
State Jharkhand
Key Dates
Publish Date 08 Apr 2023
Submission Date 15 Apr 2023
Open Date 19 Apr 2023
Finance
Tender Value 10.69 Crore
Tender Fee 10000
EMD 21.38 Lakhs
Exemption Not Available
Document List
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf
Tendernotice_4.pdf
ffcbc935-0051-456d-80ab-5f3f18e70c34.html
BOQ_92495.xls
TenderDocumentsSBD.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 08, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 15, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 15, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 19, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

pdf

Tendernotice_4.pdf

html

ffcbc935-0051-456d-80ab-5f3f18e70c34.html

xls

BOQ_92495.xls

pdf

TenderDocumentsSBD.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders