Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Work Work Of Carrying Out Of Equipments Replacement Work At Different Sub-Station Under Etd Mathura. Submission Date for this Tender is 01-05-2023. Brushes Tenders in mathura Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37149277
Corrigendum : Work Work Of Carrying Out Of Equipments Replacement Work At Different Sub-Station Under Etd Mathura
Open Tender
Indian
Uttar Pradesh
mathura
01-05-2023

Tender Details

Work Work Of Carrying Out Of Equipments Replacement Work At Different Sub-Station Under Etd Mathura-2 Carriage Of 145 Kv Circuit Breaker From One S / S To Another S / S Under Etd Mathura. Works Includes Safely Loading , Unloding , Carriagewith The Help Of Men Power , Hydra Etc. And All Associated Work To Complete The Job Satisfactorily As Per Direction Of Supervising Engineer. 3 Opening Of 132 Kv Circuit Breaker Jumper From Both Side By Cutting, Opening And Opening Of M.S Flat From Different Point With The Help Of Cutting, By Cutter As Per Direction Of Supervising Engineer. 4 Opening Of Electric Connection From Circuit Breaker Mechanism Box Cubical Box Properly And Safely To Avoid Any Dc Earthing Etc As Per Direction Of Supervising Engineer. 5 Safely Dismantling Of Old / Defective 145 Kv Circuit Breaker Of With The Help Of Crain. Segregation Of R, Y, B Pole From Base By Opening Of Nut & Bolts And Removed From Foundation. Work Includes Safe Shifting Of ( Complete Circuit Breaker ) All R, Y, B Pole Mechanism Box, Compressor Assembly, Air Cylinder, Copper Pipeline Etc. Site Store / Designated Place To Complete The Job Satisfactorily As Per Direction Of Supervising Engineer. 6 Safely And Properly Erection Of 145 Kv Newcircuit Breaker At New Foundation For Proper Operation Of It Work Includes Shifting Of New Complete Circuit Breaker Assembly From Store / Designated Place To Site As Per Direction Of Supervising Engineer. 7 Earthing Of Newly Erected Circuit Breakerwith The Help Of Welding Machine At Different Point From Main Earthmat ( X&Y Axis ) Work Includes Excavation Of Earth And Back Filling After Checking Of Earthing Of Raisor Strip Emenating From X&Y Axis Work Also Includes Re Earthing Of It With The Main Earthmat X&Y Axis Before Back Filling Of Earth. Painting Of Earthing Strip ( M.S. Flat Of Size 50X6 ) Above Ground With 01 Coat Red Oxide Paint And Two Coat Of Enamel Green Paint ( Before Painting Or All Earthing Strip Above Ground Level Must Be Clean Thoroly By Iron Hard Brush And Sand Paper ) As Per Direction Of Supervising Engineer. 8 Jumpring Of 145 Kv Circuit Breaker By New Jumpers Of All R, Y, B Pole Work Include Shifting Of Conductor From Store / Designated Place To Site, Straitening, Bending And Cutting Of Proper Size Conductor As Per Direction Of Supervising Engineer. 9 Making Of Electric Connection Of Circuit Breaker By Using Existing Laid Copper Control Cable Or By Laying Extra Control Cable As Required As Per New Circuit Breaker And Specification To Complete The Job Satisfactorily Work Includes Making Of Interconnection, Ferruling Of Each Pole As Required ( Ferull Will Be Provided By Contractor ) As Per Direction And Satisfection Of Supervising Engineer. 10 Commissioning Of Sf6 145Kv Cb Work Includes Fitting Of Sf6 Pipe Line, Filling Of Sf6 Gas Making Vccum In The Pole For Proper Commisiong Of Cb Abb / Seimens Make As Per Satisfactorily Completion Of Job As Per Direction Of Supervising Engineer 11 Part-B 12 Carriage Of 36 Kv Circuit Breaker From One S / S To Another S / S Under Etd Mathura. Works Includes Safely Loading , Unloding , Carriagewith The Help Of Men Power , Hydra Etc. And All Associated Work To Complete The Job Satisfactorily As Per Direction Of Supervising Engineer. 13 Complete Dismantling Of 36 Kv Defective Circuit Breaker Bhel, Cgl, Stelmec, Siemens, Shreem Etc. Make By Opening Both Side Jumper / Clamp Including Shifting Of Scrap Material To Store / Designated Place As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 14 Modification On Existing Foundation By Cutting, Welding & Bending Of Gi / Ms Angle As Required As Per Abb, Cgl, Stelmec, Siemens, Shreem Etc.Make Breaker Including Cost Of Men And T&P, Nut Excluding Of Steel Of Sheet Angle Etc. As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 15 Erection Of 36 Kv Abb, Cgl, Stelmec, Siemens, Shreem Etc.Make Circuit Breaker With Mounting Structure On Modified Steel Foundation With The Help Of Turfer / Tri Pole Pully Including Cost Of Men And T&P As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 16 Making Of New Jumpering, Between Cb-Ct, Cb-Bi, With Twins Acsr Panther Conductor With The Help Of Pg / Cb Clamp Including Cost Of Men And T&P As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 17 Earthing I.E. Re Earthing Of 36 Kv Circuit Breaker By Cutting, Bending & Welding Of 50X6 Mm Ms Flat To Existing Riser Work Includs Checking Of Existing Riser Connectivity To Earthmat Painting Of Existing Riser / Earth Flat With One Coat Of Red Oxide And Two Coat Of Black / Bus Green Enamel Paint Of Standard Make After Cleaning Of Strip / Angle For Rust / Dust Free Including Cost Of Men, Material And T&P As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 18 Making Electrical Connection Of Circuit Breaker By Using Existing Laid Copper Control Cable As Per New Circuit Breaker And Specification To Complete The Job Satisfactorily Work Includs Making Of Interconnection And Ferruling Of Each Core As Required ( Ferrul Will Be Provided By Contactor ) As Per Direction Of Supervising Engineer To Complete The Job Satisfactorily. 19 Part-C 20 Carriage Of 145 Kv Ct / Pt / Lafrom One S / S To Another S / S Under Etd Mathura. Works Includes Safely Loading , Unloding , Carriagewith The Help Of Men Power , Hydra Etc. And All Associated Work To Complete The Job Satisfactorily As Per Direction Of Supervising Engineer. 21 Safely Dismantling Of Old / Defective 145 Kv C.T. Of With The Help Of Hydra & Man Power And T&P .Work Includes De-Earthing , Openinng Of Electrical Connection, Opening Of Jumper Andsafe Shifting Of ( Complete C.T. ) From Dismantled Site To Near Bystore As Per Direction Of Supervising Engineerto Complete The Job Satisfactorily. 22 Safely Erection Of New 145 Kv C.T. Of With The Help Of Hydra & Man Power And T&P .Work Includes Re-Earthing , Makingof Electrical Connection, Making Of Jumper Andsafe Shifting Of ( Complete C.T. ) Fromnear Bystore To Erection Siteas Per Direction Of Supervising Engineerto Complete The Job Satisfactorily. 23 Safely Dismantling Of Old / Defective 145 Kv P.T. Of With The Help Of Hydra & Man Power And T&P .Work Includes De-Earthing , Openinng Of Electrical Connection, Opening Of Jumper Andsafe Shifting Of ( Complete P.T. ) From Dismantled Site To Near Bystore As Per Direction Of Supervising Engineerto Complete The Job Satisfactorily. 24 Safely Erection Of New 145 Kv P.T. Of With The Help Of Hydra & Man Power And T&P .Work Includes Re-Earthing , Makingof Electrical Connection, Making Of Jumper Andsafe Shifting Of ( Complete P.T. ) Fromnear Bystore To Erection Siteas Per Direction Of Supervising Engineerto Complete The Job Satisfactorily. 25 Note:- 26 1.Circuit Breaker / C.T. / Pt. And Its Associated Meterial, Conductor For Jumper, Control Cable, Earthing Strip Size 50X6 Provided By The Upptcl. 27 2. Crain / Hydra, Truck, Trailor, Welding Machine, All Skilled And Unskilled Labour, All Required T&P For Completing Above Work ( Skilled & Unskilled Labour During Commissioning Of Breaker For The Help Of Commissioning Engineer Will Be Provide By The Contractor. )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Apr-2023 Date1 Date 20-04-2023
2 20-Apr-2023 Date1. Date 25-04-2023
3 26-Apr-2023 Date2 Date 01-05-2023

Key Value

Document Fees
INR 590 /-
EMD
INR 2000.0 /-
Tender Value
INR 1.96 Lakhs /-

BOQ Items

Name of Work:Work of Carrying out of equipment replacement work at different sub station Under ETD Mathura
Sl. No. Item Description
1Part-A
2Carriage of 145 KV circuit Breaker from one S/S to another S/S Under ETD Mathura. Works includes safely loading ,unloding ,carriagewith the help of men power ,hydra etc. and all associated work to complete the job satisfactorily as per direction of Supervising Engineer.
3Opening of 132 KV Circuit Breaker jumper from both side by cutting, opening and opening of M.S flat from different point with the help of cutting, by cutter as per direction of supervising engineer.
4Opening of Electric Connection from Circuit Breaker mechanism box cubical box properly and safely to avoid any DC earthing etc as per direction of supervising engineer.
5Safely Dismantling of old / defective 145 KV Circuit Breaker of with the help of crain. Segregation of R,Y,B pole from base by opening of Nut & bolts and removed from foundation. Work includes safe shifting of (Complete Circuit Breaker) all R,Y,B Pole mechanism box, compressor assembly, air cylinder, copper pipeline etc. site store /designated place to complete the job satisfactorily as per direction of supervising engineer.
6Safely and properly erection of 145 KV NewCircuit Breaker at new foundation for proper operation of it work includes shifting of new complete Circuit Breaker assembly from store/designated place to site as per direction of supervising engineer.
7Earthing of newly erected Circuit Breakerwith the help of welding machine at different point from main earthmat (X&Y axis) work includes excavation of earth and back filling after checking of earthing of raisor strip emenating from X&Y axis work also includes re earthing of it with the main earthmat X&Y axis before back filling of earth. Painting of earthing strip (M.S. Flat of size 50X6) above ground with 01 coat red oxide paint and two coat of enamel green paint (before painting or all earthing strip above ground level must be clean thoroly by iron hard brush and sand paper) as per direction of supervising engineer.
8Jumpring of 145 KV Circuit Breaker by new jumpers of all R,Y,B pole work include shifting of conductor from store/designated place to site, straitening, bending and cutting of proper size conductor as per direction of supervising engineer.
9Making of Electric connection of Circuit Breaker by using existing laid copper control cable or by laying extra control cable as required as per new circuit breaker and specification to complete the job satisfactorily work includes making of interconnection, ferruling of each pole as required (ferull will be provided by contractor) as per direction and satisfection of supervising engineer.
10Commissioning of SF6 145KV CB work includes fitting of SF6 pipe line, filling of sf6 gas making vccum in the pole for proper commisiong of CB ABB/ Seimens make as per satisfactorily completion of job as per direction of supervising engineer
11Part-B
12Carriage of 36 KV circuit Breaker from one S/S to another S/S Under ETD Mathura. Works includes safely loading ,unloding ,carriagewith the help of men power ,hydra etc. and all associated work to complete the job satisfactorily as per direction of Supervising Engineer.
13Complete dismantling of 36 KV defective Circuit Breaker BHEL, CGL, Stelmec, Siemens, Shreem etc. make by opening both side jumper/clamp including shifting of scrap material to store/ designated place as per direction of supervising engineer to complete the job satisfactorily.
14Modification on existing foundation by cutting, welding & bending of GI/MS angle as required as per ABB, CGL, Stelmec, Siemens, Shreem etc.Make Breaker including cost of men and T&P, nut excluding of steel of sheet angle etc. as per direction of supervising engineer to complete the job satisfactorily.
15Erection of 36 KV ABB, CGL, Stelmec, Siemens, Shreem etc.make Circuit Breaker with mounting structure on modified steel foundation with the help of turfer/tri pole pully including cost of men and T&P as per direction of supervising engineer to complete the job satisfactorily.
16Making of new jumpering, between CB-CT, CB-BI, with twins ACSR panther conductor with the help of PG/CB clamp including cost of men and T&P as per direction of supervising engineer to complete the job satisfactorily.
17Earthing i.e. Re Earthing of 36 KV Circuit Breaker by cutting, bending & welding of 50X6 mm MS Flat to existing riser work includs checking of existing riser connectivity to earthmat painting of existing riser/earth flat with one coat of red oxide and two coat of black/bus green enamel paint of standard make after cleaning of strip/angle for rust/dust free including cost of men, material and T&P as per direction of supervising engineer to complete the job satisfactorily.
18Making electrical connection of circuit breaker by using existing laid copper control cable as per new circuit breaker and specification to complete the job satisfactorily work includs making of interconnection and ferruling of each core as required (Ferrul will be provided by contactor) as per direction of supervising engineer to complete the job satisfactorily.
19Part-C
20Carriage of 145 KV CT/PT/LAfrom one S/S to another S/S Under ETD Mathura. Works includes safely loading ,unloding ,carriagewith the help of men power ,hydra etc. and all associated work to complete the job satisfactorily as per direction of Supervising Engineer.
21Safely dismantling of old / defective 145 KV C.T. of with the help of Hydra & Man power and T&P .Work includes de-earthing , openinng of electrical connection, opening of jumper andsafe shifting of (Complete C.T.) from dismantled site to near bystore As per direction of supervising Engineerto complete the job satisfactorily.
22Safely erection of new 145 KV C.T. of with the help of Hydra & Man power and T&P .Work includes Re-earthing , makingof electrical connection, making of jumper andsafe shifting of (Complete C.T.) fromnear bystore to erection siteAs per direction of supervising Engineerto complete the job satisfactorily.
23Safely dismantling of old / defective 145 KV P.T. of with the help of Hydra & Man power and T&P .Work includes de-earthing , openinng of electrical connection, opening of jumper andsafe shifting of (Complete P.T.) from dismantled site to near bystore As per direction of supervising Engineerto complete the job satisfactorily.
24Safely erection of new 145 KV P.T. of with the help of Hydra & Man power and T&P .Work includes Re-earthing , makingof electrical connection, making of jumper andsafe shifting of (Complete P.T.) fromnear bystore to erection siteAs per direction of supervising Engineerto complete the job satisfactorily.
25Note:-
261.Circuit Breaker/C.T./PT. and its associated meterial, conductor for jumper, control cable, earthing strip size 50X6 provided by the UPPTCL.
272. Crain/Hydra, Truck,Trailor, Welding machine, All skilled and unskilled labour, all required T&P for completing above work (Skilled & unskilled labour during commissioning of breaker for the help of commissioning engineer will be provide by the contractor.)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail