Power Distribution Division - Rajapur Rurals Border Power Distribution Sub-Division - Full Deposit Scheme For The Year 2023-24 Under Rajapur, Jhatpat Portal, Nivesh Mitra Portal, The Work Of Energizing The Connections Received From Etc. As Per The Inten
Tender Overview
Project Description
Power Distribution Division - Rajapur Rurals Border Power Distribution Sub-Division - Full Deposit Scheme For The Year 2023-24 Under Rajapur, Jhatpat Portal, Nivesh Mitra Portal, The Work Of Energizing The Connections Received From Etc. As Per The Intention Of The Government.-2 Cartage Ofpole & Material From Store Centrefrom Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 3 9 / 11 Mtr. Stp 4 8.5 Mtr. Pcc Pole 5 11 Kv 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 6 11 Kv Outdoor Jointing Kit For 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 7 11 Kv Cross Arm *V* Type 8 Holding Clamp / F-Clamp 9 11 Kv Disc Insulator 10 Pin Insulator With Pin 11 T-Off Channel 12 Top Channel 13 Dropper Channel 14 Stay Set Complete 15 Earthing Rod With Fitting 16 Acsr Weasel Conductor 17 25 / 63 Transformer 18 Barbed Wire 19 G.I. Wire For Guarding 20 Abc 3X50 / 3X95 / 3X120 Mm. 21 Erection Of Single Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 22 Erection Of Single Support 9 / 11 St Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 23 Erectionof Double Pole Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 24 Grouting Of Double Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 25 Grouting Of Single Support Pcc Poles As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 26 Grouting Of Single Support 9 / 11 St Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 27 Erection & Grouting Of Stay Set As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 28 Fixing Of Earthing Rodas Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Fixing Of T-Off Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 30 Fixing Of Top Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 31 Fixing Of Dropper Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 32 Fixing Of Holding Clamp / F-Clamp As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 33 Installation Of 25 / 63 Kv Transformers 34 Laying & Sagging And Binding Acsr Weasel Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 35 Laying, Sagging And Binding Abc 3X50 / 3X95 / 3X120 As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 36 Digging Hard And Rocky Pits For Pole And Stay As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 37 Laying Of 11 Kv Xlpe Cable 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable As Per Iss 1255 / 1983 Of Amendment There If By Trench Less Technology Method By Deep Drilling System. The Jop Includes The Cost Of Excavation Of Earth, Laying Of Cable Inside It. The Work Is To Be Carried Out As Per Govt. Approved Drg.. 38 Hosting Of 11 Kv Cable On Existing / Erected Support With Provision Of Ms Pipe 150Mm Dia 3 Mtr. Long Suitable Of 3X185 / 3X120 / 3X70 Sq.Mm Cable Fixing Of Proper Support And Its Clamping, Jumpering Properly As Per Resspo Norms. ( All Material Will Be Supplied By The Contractor ) 39 Installation Of Heat Shrinkable Type Cable Jointing Kit O / D End Termination Suitable For 11 Kv Xlpe Cable Confirming To Is Esi-09-13-Is-13573 Of 1992 Amendment I&Ii Vde-0278 Of Latest Version Thereof If Any. ( Jointing Kit Supplied By Dept. ) 40 Fabrication Of Hardware Materials 41 11 Kv Fuse Set Installation 42 Guarding Of Road Crossing & Line 43 Tree Chopping
BOQ
| Sl. No. | Item Description |
| 1 | WORK |
| 2 | Cartage ofPole & material from store centrefrom any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. |
| 3 | 9/11 mtr. STP |
| 4 | 8.5 mtr. PCC Pole |
| 5 | 11 KV 3x185/3x120/3x70 sq.mm XLPE cable |
| 6 | 11 KV outdoor jointing kit for 3x185/3x120/3x70 sq.mm XLPE cable |
| 7 | 11 KV Cross arm *V* type |
| 8 | Holding Clamp/F-Clamp |
| 9 | 11 KV Disc Insulator |
| 10 | Pin Insulator with Pin |
| 11 | T-off Channel |
| 12 | Top Channel |
| 13 | Dropper Channel |
| 14 | Stay set complete |
| 15 | Earthing rod with fitting |
| 16 | ACSR weasel conductor |
| 17 | 25/63 Transformer |
| 18 | Barbed wire |
| 19 | G.I. wire for Guarding |
| 20 | ABC 3x50/3x95/3x120 mm. |
| 21 | Erection of Single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 22 | Erection of Single support 9/11 ST Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 23 | Erectionof Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 24 | Grouting of Double Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 25 | Grouting of Single support PCC Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 26 | Grouting of Single support 9/11 ST Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 27 | Erection & Grouting of Stay set as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 28 | Fixing of Earthing rodas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 29 | Fixing of T-off Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 30 | Fixing of Top Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 31 | Fixing of Dropper Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 32 | Fixing of Holding Clamp/F-Clamp as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 33 | Installation of 25/63 kv Transformers |
| 34 | Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 35 | Laying, Sagging and Binding ABC 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 36 | Digging hard and Rocky pits for Pole and Stay as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 37 | Laying of 11 kv XLPE cable 3x185/3x120/3x70 sq.mm XLPE cable as per ISS 1255/1983 of amendment there if by trench less Technology method by deep drilling system. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg.. |
| 38 | Hosting of 11 kv cable on existing/erected support with provision of MS pipe 150mm dia 3 Mtr. Long suitable of 3x185/3x120/3x70 sq.mm cable fixing of proper support and its clamping, jumpering properly as per RESSPO Norms.(All material will be supplied by the contractor) |
| 39 | Installation of Heat Shrinkable type cable jointing kit O/D end Termination suitable for 11 kv XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version thereof if any. (Jointing kit supplied by Dept.) |
| 40 | Fabrication of Hardware materials |
| 41 | 11 KV Fuse Set Installation |
| 42 | Guarding of Road crossing & Line |
| 43 | Tree chopping |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender