Power Government Departments Closing in 0 days TDR #37145776

Power Distribution Division - Rajapur Rurals Border Power Distribution Sub-Division - Full Deposit Scheme For The Year 2023-24 Under Rajapur, Jhatpat Portal, Nivesh Mitra Portal, The Work Of Energizing The Connections Received From Etc. As Per The Inten

Issued by Government Departments · karwi, Uttar Pradesh
Tender Value
5 Lakhs
Estimated cost
Bid Submission
10 Apr 2023
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
karwi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Power Distribution Division - Rajapur Rurals Border Power Distribution Sub-Division - Full Deposit Scheme For The Year 2023-24 Under Rajapur, Jhatpat Portal, Nivesh Mitra Portal, The Work Of Energizing The Connections Received From Etc. As Per The Intention Of The Government.-2 Cartage Ofpole & Material From Store Centrefrom Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 3 9 / 11 Mtr. Stp 4 8.5 Mtr. Pcc Pole 5 11 Kv 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 6 11 Kv Outdoor Jointing Kit For 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 7 11 Kv Cross Arm *V* Type 8 Holding Clamp / F-Clamp 9 11 Kv Disc Insulator 10 Pin Insulator With Pin 11 T-Off Channel 12 Top Channel 13 Dropper Channel 14 Stay Set Complete 15 Earthing Rod With Fitting 16 Acsr Weasel Conductor 17 25 / 63 Transformer 18 Barbed Wire 19 G.I. Wire For Guarding 20 Abc 3X50 / 3X95 / 3X120 Mm. 21 Erection Of Single Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 22 Erection Of Single Support 9 / 11 St Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 23 Erectionof Double Pole Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 24 Grouting Of Double Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 25 Grouting Of Single Support Pcc Poles As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 26 Grouting Of Single Support 9 / 11 St Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 27 Erection & Grouting Of Stay Set As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 28 Fixing Of Earthing Rodas Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Fixing Of T-Off Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 30 Fixing Of Top Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 31 Fixing Of Dropper Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 32 Fixing Of Holding Clamp / F-Clamp As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 33 Installation Of 25 / 63 Kv Transformers 34 Laying & Sagging And Binding Acsr Weasel Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 35 Laying, Sagging And Binding Abc 3X50 / 3X95 / 3X120 As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 36 Digging Hard And Rocky Pits For Pole And Stay As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 37 Laying Of 11 Kv Xlpe Cable 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable As Per Iss 1255 / 1983 Of Amendment There If By Trench Less Technology Method By Deep Drilling System. The Jop Includes The Cost Of Excavation Of Earth, Laying Of Cable Inside It. The Work Is To Be Carried Out As Per Govt. Approved Drg.. 38 Hosting Of 11 Kv Cable On Existing / Erected Support With Provision Of Ms Pipe 150Mm Dia 3 Mtr. Long Suitable Of 3X185 / 3X120 / 3X70 Sq.Mm Cable Fixing Of Proper Support And Its Clamping, Jumpering Properly As Per Resspo Norms. ( All Material Will Be Supplied By The Contractor ) 39 Installation Of Heat Shrinkable Type Cable Jointing Kit O / D End Termination Suitable For 11 Kv Xlpe Cable Confirming To Is Esi-09-13-Is-13573 Of 1992 Amendment I&Ii Vde-0278 Of Latest Version Thereof If Any. ( Jointing Kit Supplied By Dept. ) 40 Fabrication Of Hardware Materials 41 11 Kv Fuse Set Installation 42 Guarding Of Road Crossing & Line 43 Tree Chopping

BOQ

dk;Z dk fooj.k&fo|qr forj.k [k.M&jktkiqj xzkeh.k dh lhekUrxZr fo|qr forj.k mi[k.M&jktkiqj ds v/khu o\"kZ 2023&24 gsrq iw.kZ tek ;kstuk] >ViV iksVZy] fuos’k fe+= iksVZy] vkfn ls izkIr la;kstu dks ‘kklu dh ea’kkuq:i vfr’kh?kz la;kstuks dks ÅthZd`r djus dk dk;ZA
Sl. No. Item Description
1WORK
2Cartage ofPole & material from store centrefrom any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
39/11 mtr. STP
48.5 mtr. PCC Pole
511 KV 3x185/3x120/3x70 sq.mm XLPE cable
611 KV outdoor jointing kit for 3x185/3x120/3x70 sq.mm XLPE cable
711 KV Cross arm *V* type
8Holding Clamp/F-Clamp
911 KV Disc Insulator
10Pin Insulator with Pin
11T-off Channel
12Top Channel
13Dropper Channel
14Stay set complete
15Earthing rod with fitting
16ACSR weasel conductor
1725/63 Transformer
18Barbed wire
19G.I. wire for Guarding
20ABC 3x50/3x95/3x120 mm.
21Erection of Single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
22Erection of Single support 9/11 ST Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
23Erectionof Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
24Grouting of Double Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
25Grouting of Single support PCC Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
26Grouting of Single support 9/11 ST Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
27Erection & Grouting of Stay set as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
28Fixing of Earthing rodas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
29Fixing of T-off Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
30Fixing of Top Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
31Fixing of Dropper Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
32Fixing of Holding Clamp/F-Clamp as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
33Installation of 25/63 kv Transformers
34Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
35Laying, Sagging and Binding ABC 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
36Digging hard and Rocky pits for Pole and Stay as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
37Laying of 11 kv XLPE cable 3x185/3x120/3x70 sq.mm XLPE cable as per ISS 1255/1983 of amendment there if by trench less Technology method by deep drilling system. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg..
38Hosting of 11 kv cable on existing/erected support with provision of MS pipe 150mm dia 3 Mtr. Long suitable of 3x185/3x120/3x70 sq.mm cable fixing of proper support and its clamping, jumpering properly as per RESSPO Norms.(All material will be supplied by the contractor)
39Installation of Heat Shrinkable type cable jointing kit O/D end Termination suitable for 11 kv XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version thereof if any. (Jointing kit supplied by Dept.)
40Fabrication of Hardware materials
4111 KV Fuse Set Installation
42Guarding of Road crossing & Line
43Tree chopping

AI Tender Summary

OUR REF NO 37145776
AUTHORITY Government Departments
TENDER VALUE 5 Lakhs
LAST DATE 10-04-2023
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Power Distribution Division - Rajapur Rurals Border Power Distribution Sub-Division - Full Deposit Scheme For The Year 2023-24 Under Rajapur, Jhatpat Portal, Nivesh Mitra Portal, The Work Of Energizing The Connections Received From Etc. As Per The Intention Of The Government.-2 Cartage Ofpole & Material From Store Centrefrom Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 3 9 / 11 Mtr. Stp 4 8.5 Mtr. Pcc Pole 5 11 Kv 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 6 11 Kv Outdoor Jointing Kit For 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable 7 11 Kv Cross Arm *V* Type 8 Holding Clamp / F-Clamp 9 11 Kv Disc Insulator 10 Pin Insulator With Pin 11 T-Off Channel 12 Top Channel 13 Dropper Channel 14 Stay Set Complete 15 Earthing Rod With Fitting 16 Acsr Weasel Conductor 17 25 / 63 Transformer 18 Barbed Wire 19 G.I. Wire For Guarding 20 Abc 3X50 / 3X95 / 3X120 Mm. 21 Erection Of Single Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 22 Erection Of Single Support 9 / 11 St Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 23 Erectionof Double Pole Support 8.5M Pcc Poles Including Complete. H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 24 Grouting Of Double Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 25 Grouting Of Single Support Pcc Poles As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 26 Grouting Of Single Support 9 / 11 St Polesas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 27 Erection & Grouting Of Stay Set As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 28 Fixing Of Earthing Rodas Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Fixing Of T-Off Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 30 Fixing Of Top Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 31 Fixing Of Dropper Channelas Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 32 Fixing Of Holding Clamp / F-Clamp As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 33 Installation Of 25 / 63 Kv Transformers 34 Laying & Sagging And Binding Acsr Weasel Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 35 Laying, Sagging And Binding Abc 3X50 / 3X95 / 3X120 As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. 36 Digging Hard And Rocky Pits For Pole And Stay As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 37 Laying Of 11 Kv Xlpe Cable 3X185 / 3X120 / 3X70 Sq.Mm Xlpe Cable As Per Iss 1255 / 1983 Of Amendment There If By Trench Less Technology Method By Deep Drilling System. The Jop Includes The Cost Of Excavation Of Earth, Laying Of Cable Inside It. The Work Is To Be Carried Out As Per Govt. Approved Drg.. 38 Hosting Of 11 Kv Cable On Existing / Erected Support With Provision Of Ms Pipe 150Mm Dia 3 Mtr. Long Suitable Of 3X185 / 3X120 / 3X70 Sq.Mm Cable Fixing Of Proper Support And Its Clamping, Jumpering Properly As Per Resspo Norms. ( All Material Will Be Supplied By The Contractor ) 39 Installation Of Heat Shrinkable Type Cable Jointing Kit O / D End Termination Suitable For 11 Kv Xlpe Cable Confirming To Is Esi-09-13-Is-13573 Of 1992 Amendment I&Ii Vde-0278 Of Latest Version Thereof If Any. ( Jointing Kit Supplied By Dept. ) 40 Fabrication Of Hardware Materials 41 11 Kv Fuse Set Installation 42 Guarding Of Road Crossing & Line 43 Tree Chopping
Basic Detail
Tender No 44/SE/EDCCKT/2022-23
Bidding Type Tender
Location
City karwi
State Uttar Pradesh
Key Dates
Publish Date 05 Apr 2023
Submission Date 10 Apr 2023
Open Date 11 Apr 2023
Finance
Tender Value 5 Lakhs
Tender Fee 1180
EMD 10000
Exemption Not Available
Document List
Part1_44.pdf
Tendernotice_1.pdf
07c539eb-affc-454b-b705-1301a4dc4289.html
BOQ_1324381.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 05, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 10, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 11, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Part1_44.pdf

pdf

Tendernotice_1.pdf

html

07c539eb-affc-454b-b705-1301a4dc4289.html

xls

BOQ_1324381.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders