| 1 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. |
| 2 | Earth work in filling to recupe the canal section including cost of materials, T&P and labours and other accessories required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 3 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 4 | Plain Cement Concrete in 1:3:6in Base of toe wall with Coarse Sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 20 mm to 40 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 5 | Plain Cement Concrete in 1:2:4in Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 6 | Plain Cement Concrete in 1:2:4in Lining with Coarse Sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 7 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 8 | Supplying and laying Stone Grit below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 9 | Providing & Laying LDPE Sheet on slope below lining including cost of all materials, labour, T&P etc required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 10 | Centering and shuttering for CC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 11 | Porus Concrete in panel with Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 12 | Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for complete workas directed by Engineer-in-Charge as per I.D. specification. |
| 13 | Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specification. |