Irrigation Department has published Tender For Construction Of Vrb And Head Regulator At Ahirauli Distributary Under Irrigation Division Gorakhpur In District Maharajganj.. Submission Date for this Tender is 17-04-2023. Bridge Work Tenders in Maharajganj Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Apr-2023 | DateCorrigendum | Date | 17-04-2023 |
Sl. No. | Item Description |
1 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. |
2 | Earth work formaking Ramp,Diversion and making section profile including all cost of materials,T&P and labours and other accessories required for proper completion of work. |
3 | Supply and Laying of coarse sand (FM not less then 2) in form of fillter materialincluding all cost of materials,T&P and labours and other accessories required for proper completion of work. |
4 | Supply and Laying of crushed grit (10mm-20mm) in form of fillter materialincluding all cost of materials,T&P and labours and other accessories required for proper completion of work. |
5 | Laying C.C. 1:3:6in foundation withcement, sonbhadra coarse sand ofFM. Not less then 2.00 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work. |
6 | Centering and shuttering for R.C.C. workincluding all cost of materials,T&Plabours and other accessories required for proper completion of work. |
7 | 1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand ofFM. Not less then 2.00, including all cost of materials,T&P and laboursand other accessories required for proper completion of work |
8 | Bending, binding cuttingplacing in position rainforcement steel includingcost of binding wire and tack wilding with material. and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
9 | Laying R.C.C. work in 1:1.5:3(M20) sonbhadra coarse sand ofFM. Not less then 2.00 and dala grit (10mm to 20mm.)for floor ,cut of wall ,toe wall including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
10 | Laying R.C.C. work in 1:1:2(M25) sonbhadra coarse sand ofFM. Not less then 2.00 and dala grit (10mm to 20mm.)for Slab,wearing coat ,bed block copingincluding all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
11 | Supplyand laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work. |
12 | Dismelting of old V.R.B.and proper disposal including all cost of materials,T&P and labours etc. |
13 | 1st class Dry brick on Edge soling including prepration of sub-grade to prescrib Slop ,filing joint with local sand/silt including cost of all material ,labour, t&p etc. required for proper completion of worK. T&P etc. |
14 | Fixing wheel guard stoneincluding cost of all material ,labour, t&p etc. required for proper completion of work |
15 | Sign borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK. |
16 | Supply and fixing PVC pipe 110mm for drainge spout ,labour, t&p etc. required for proper completion of worK. |
17 | Providing one coat of VG -30bitumen painting with two layer oftarfeltagain followed by secondcoat of bitumen on abutment and pierbefore laying R.C.C. Slab including cost of all material labour and T & P etc. |
18 | Supply and layingof MirjapurStone Boulder 25 to 60 kg. Lift upto 1.50M and lead of 60.00 M.includingcost of all material, labour, T & P etc. complete for work. as per direction of Engineer-in-charge. |
19 | Deep Struck pointing in 1:2 on Brick work, including all cost of materials,T&P and laboursand other accessories required for proper completion of work |
20 | Laying of C.C.in M-15 (1:2:4) in slope lining with coarse sand (F.M not less then 2 )and Crushed stone grit(10mm-20mm) including cost of all material, labour, T&P required for proper completion of work as directed by Engineer-in-Charge . |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail