Tender For Maintence Works To Karattankattupudur Community Toilet In Vadugapatti Town Panchayat., erode-Tamil Nadu

Town Panchayats-TP has published Tender For Maintence Works To Karattankattupudur Community Toilet In Vadugapatti Town Panchayat.. Submission Date for this Tender is 11-04-2023. Toilet Bathroom Tenders in erode Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37138893
Corrigendum : Tender For Maintence Works To Karattankattupudur Community Toilet In Vadugapatti Town Panchayat.
Open Tender
Indian
Tamil Nadu
erode
11-04-2023

Tender Details

Construction Of Community Toilet In Vadugapatti Town Panchayat. 1 Earth Work Excavation In All Classes Of Soils Such As Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Ordinary Earth, Earth Mix With 50% Fair Sized Boulders Etc., With Initial Lead And Lifts Including Laying, Spreading, Levelling, Sectioning Breaking Clods Etc., Including All Incidental Charges Etc. Complete As Per Standard Specification. ( Forfoundations Ss 20B ) 2 Providing Plain Cement Concrete Of Mix 1:4:8 ( One Cement Four Sand Eight Aggregates ) Using 40Mm Iss Gauge Sizehard Broken Including Cost Conveyance Of All Materisl To Site Including Labour Charges, Transporting And Placing In Postion Including Labour For Mixing Compacting, Finishing And Curring Etc. Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete As Per Standard Specification 3 Supplying & Erecting Rcc Centering For Sides & Soffiots Including Necessary Supports & Strutting Upto 3.29M Height For Plane Surfaces In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60Cm & 10 Gauge Stiffened, Welded With Steel Angle Of Size 25 X 25 X 3Mm For Boarding Laid Over Silver Oak Joists ( Country Wood ) Of Size 10 X 6.5Cm Spaced @ About 90Cm C / C And Supported By Casurina Props Of 10 - 13Cm Dia. Spaced @ 75Cm C / C Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2.For The Following Items ( For All R.C.C Works ) Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete As Per Standard Specification 4 Supplyingand Fabrication And Placing In Position Of Tmt Bars For All Rcc Works With Cost Of Binding Wire And Cost Of Cutting, Bending , Tying In Position Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete As Per Standard Specification. 5 Providing Reinforcement Cement Concrete1:1½:3 ( One Cement One Point Five Sand And Three Aggregates ) Mix Using 20Mm Gauge Hard Granite Broken Stone Jellyin All Rcc Works Connected To The Work Excludingshuttering , Centering And Cost Of Reinforcement Grills But Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete As Per Standard Specification 6 Brick Work In Cement Mortar In 1:5 ( One Cement And Five Sand ) Using Best Quality Ofstockbricks2nd Class Of Size 9X 41 / 2X 3Including All Cost Of Materials And Labour Charges Includingcuring Charges Etc., Complete As Per Standard Specification. 7 Supplying And Fixing Ms L Angle Directed By The Departmental Officers Inclusive Of Cost Of Ms Grill And Labour Charges Including One Coat Of Red Oxide And Fixing In Position Etc. Complete ( As Per Schedule Of Rates ) As Per Standard Specification 8 Plastering C.M 1:3 ( One Cement And Three Sand ) Mix To A Thick Of 20Mm Using Clean Screened Sand And Including The Cost Of Curing For 15 Days From The Completion Of Work And Surface Should Free From Undulations And Including The Cost Of Preparing The Surface For Plastering And Protecting From Other Damages Till Setting Of Mortar Etc Complete Complying As Per Morth Specifications. Tndss No.56 & 57 9 Plastering C.M 1:3 ( One Cement And Three Sand ) Mix To A Thick Of 12Mm Using Clean Screened Sand And Including The Cost Of Curing For 15 Days From The Completion Of Work And Surface Should Free From Undulations And Including The Cost Of Preparing The Surface For Plastering And Protecting From Other Damages Till Setting Of Mortar Etc Complete Complying As Per Morth Specifications. Tndss No.56 & 57 10 Plastering C.M 1:5 ( One Cement And Five Sand ) Mix To A Thick Of 12Mm Using Clean Screened Sand And Including The Cost Of Curing For 15 Days From The Completion Of Work And Surface Should Free From Undulations And Including The Cost Of Preparing The Surface For Plastering And Protecting From Other Damages Till Setting Of Mortar Etc Complete Complying As Per Morth Specifications. Tndss No.56 & 57 11 Dadooing The Walls From The Floor Level With White Glazed Tiles Of 300Mmx300mm X 6Mm Of Best And Approved Quality Set In Cement Mortar 1:2 Mix ( One Cement And Two Sand ) 12Mm Thick And Pointing With White Cement Neatly As Directed Complying With Standard Specifications 12 Paving The Floor With Scratch Proof Ceromic Tiles Of Size 305X305x6mm Finished Thickness With C.M 1:3-20Mm Tk And Polished With Same Colorcement Including All Cost And Convene Of All Materials Etc., Complete 13 Painting The New Walls Two Coats Over One Coat Ofpriming With Best Emulsion Paint Ofapproved Colour Andquality Includingpreparation Ofsurfaceandfinishing Neatly Etc., Complete Complying With Standard Specification And As Directed By The Department Officers Etc., Complete Complying With Standard Specifications. 14 Supplying And Fixing Of 16Mm Thick Bison Shutter Including Cost Of Suitable T Hinges, Bolt Nuts, Handle And Cost Of Teak Wood Lipping For Alround The Bison Shutters. Including Cost And Conveyance And Labour Charges For Wrought And Put Up Etc., Complete. 15 Supply And Fixing In Position 22 Indian Type Water Closet With Foot Reset Includes P ( Or ) S Trap Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., To Complete As Per Std., Specifications. 16 Painting Two Coats With Best-Approved Quality Colourpaint For Newwoodworks Including Cost And Conveyance Of Enamel Paint Etc., Complete. 17 Painting Two Coats With Best-Approved Quality Colour Enamel Paint For New Iron Works Including Cost And Conveyance Of Enamel Paint Etc., Complete. 18 Wiring With 2X1.5Sqmm ( 22 / 0.3 ) Pvc Insulated Unsheathed Sc Cu. Conductor Of 1100V Grade In Suitable Pvc Rigid Pipe Concealed In Wall And Ceiling With Pvc Accessoires With Tw Switch Box And 5A F.T. Switch In Flush With Wall With 3Mm Thick Hylum Sheet Cover For Making Good Of The Concealed Portion With Suitable Colour For Pvc Concealed Light Point / Fan Point ( For Electronic Regulator ) -Sd-24 19 Supply And Fixing Of Wt Bulk Head Fitting With Guard ( Philips / Bajaj / Crompton / K. Lite ) Suitable For Incandescent Lamp With 60 W Bulb Sd-84 20 Supply And Fixing Of 4 40 W Twin Street Light Flu.Fitting Complete With Copper Choke And Condensor With 32 Mm Dia Gi Pipe ( Class B ) With 1 No 32Mm Gi Bend Complete On The Existing Post Wall With 16 A Aerial Fuse Unit On Ms Plate With Pvc Unsheathed Copper Leads Ms Clarnps And Aluminium Painting With Flu.Tubes. Sd-95 21 Supply And Fixing Of 2000 Ltr Capacity Hdpe Tank

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Apr-2023 Change BOQ Financial Bid 11-04-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 10000.0 /-
Tender Value
INR 5 Lakhs /-

BOQ Items

Name of Work: Construction of Community Toilet in Vadugapatti Town Panchayat.
Sl. No. Item Description
1Earth Work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., including all incidental charges etc. complete as per standard specification.(ForFoundations SS 20B )
2Providing Plain Cement concrete of mix 1:4:8 (One cement four sand Eight aggregates) using 40mm ISS gauge sizehard broken including cost conveyance of all materisl to site including labour charges, transporting and placing in postion including labour for mixing compacting, finishing and curring etc. including cost and conveyance of all materials and labour charges etc., complete as per standard specification
3Supplying & Erecting RCC centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items (For all R.C.C Works )including cost and conveyance of all materials and labour charges etc., complete as per standard specification
4Supplyingand Fabrication and placing in position of TMT bars for all RCC works with cost of binding wire and cost of cutting, bending ,tying in position including cost and conveyance of all materials and labour charges etc., complete as per standard specification.
5Providing Reinforcement Cement concrete1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jellyin all RCC works connected to the work excludingshuttering , Centering and cost of Reinforcement grills but including cost and conveyance of all materials and labour charges etc., complete as per standard specification
6Brick work in Cement Mortar in 1:5 ( One cement and Five Sand ) using best quality ofStockbricks2nd class of size 9x 41/2x 3including all cost of materials and labour charges includingCuring charges etc., complete as per Standard Specification.
7Supplying and fixing MS L Angle directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete (as per schedule of rates) as per standard specification
8Plastering c.m 1:3(one cement and Three sand) mix to a thick of 20mm using clean screened sand and including the cost of curing for 15 days from the completion of work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc complete complying as per MORTH Specifications. TNDSS No.56 & 57
9Plastering c.m 1:3 (one cement and three sand) mix to a thick of 12mm using clean screened sand and including the cost of curing for 15 days from the completion of work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc complete complying as per MORTH Specifications. TNDSS No.56 & 57
10Plastering c.m 1:5(one cement and five sand) mix to a thick of 12mm using clean screened sand and including the cost of curing for 15 days from the completion of work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc complete complying as per MORTH Specifications. TNDSS No.56 & 57
11Dadooing the walls from the floor level with white glazed tiles of 300mmx300mm x 6mm of best and approved quality set in cement mortar 1:2 mix (one cement and two sand) 12mm thick and pointing with white cement neatly as directed Complying with standard specifications
12Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm finished thickness with c.m 1:3-20mm Tk and polished with same colorcement including all cost and convene of all materials etc.,complete
13Painting the new walls two coats over one coat ofpriming with best Emulsion paint ofapproved colour andquality includingpreparation ofsurfaceandfinishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
14Supplying and fixing of 16mm thick bison shutter including cost of suitable "T" hinges, bolt nuts, handle and cost of teak wood lipping for alround the bison shutters. Including cost and conveyance and labour charges for wrought and put up etc., complete.
15Supply and fixing in position 22" Indian type water closet with foot reset includes "P" (or) "S" trap including cost and conveyance of all materials to site and all labour charges etc., to complete as per std.,specifications.
16Painting two coats with best-approved quality Colourpaint for NewWoodWorks including cost and conveyance of enamel paint etc., Complete.
17Painting two coats with best-approved quality Colour Enamel paint for New Iron Works including cost and conveyance of enamel paint etc., Complete.
18Wiring with 2x1.5sqmm (22/0.3) PVC insulated unsheathed SC Cu. Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires with TW switch box and 5A F.T. switch in flush with wall with 3mm thick hylum sheet cover for making good of the concealed portion with suitable colour for PVC concealed light point / fan point (For electronic regulator)-Sd-24
19Supply and fixing of WT bulk head fitting with guard (Philips / Bajaj / Crompton / K. Lite) suitable for incandescent lamp with 60 W bulb SD-84
20Supply and fixing of 4" 40 W Twin street light flu.fitting complete with copper choke and condensor with 32 mm dia GI pipe (Class "B") with 1 No 32mm GI Bend complete on the existing post wall with 16 A aerial fuse unit on MS plate with PVC unsheathed Copper leads MS clarnps and aluminium painting with flu.tubes. SD-95
21Supply and fixing of 2000 ltr Capacity HDPE Tank
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail