}

Design, Construction, Manufacturing, Supply, Installation, Testing And Commissioning Of Ballastless Trackwork In Mainline From Dahisar East Station (Ch. 15194.260 M) To Bhayandar (Ch. 26435.0 M) Including Third Track, Side Track & Dead End At Dahisar And , mumbai-Maharashtra

Mumbai Metropolitan Region Development Authority-MMRDA has published Design, Construction, Manufacturing, Supply, Installation, Testing And Commissioning Of Ballastless Trackwork In Mainline From Dahisar East Station (Ch. 15194.260 M) To Bhayandar (Ch. 26435.0 M) Including Third Track, Side Track & Dead End At Dahisar And . Submission Date for this Tender is 19-05-2023. Ballast Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

37129410
Corrigendum : Design, Construction, Manufacturing, Supply, Installation, Testing And Commissioning Of Ballastless Trackwork In Mainline From Dahisar East Station (Ch. 15194.260 M) To Bhayandar (Ch. 26435.0 M) Including Third Track, Side Track & Dead End At Dahisar And
Open Tender
Indian
Maharashtra
mumbai
19-05-2023

Tender Details

Design, Construction, Manufacturing, Supply, Installation, Testing And Commissioning Of Ballastless Trackwork In Mainline From Dahisar East Station ( Ch. 15194.260 M ) To Bhayandar ( Ch. 26435.0 M ) Including Third Track, Side Track & Dead End At Dahisar And Depot Entry / Exit Approach Track For Line-9 Corridor { Dahisar ( E ) To Bhayandar } Of Mumbai Metro Rail Project Of Mmrda, Mumbai.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-May-2023 PreBidReply Technical Bid 19-05-2023

Key Value

Document Fees
INR 11800 /-
EMD
INR 100000.0 /-
Tender Value
INR 88.28 Crore /-

BOQ Items

Name of Work: MMRDA/L9/MMRP/CA-167 Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai.
Sl. No. Item Description
1Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai
2Schedule ‘A’ Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai. In terms of Clause C2.5 & C2.6 of ITT, the rates shall be inclusive of all central/state /local taxes, duties, levies, cess, full Custom Duty and all other incidental charges etc.excluding GST
3Schedule ‘B’ (Provisional Sum) and concrete Bed for Stacking of Rails. Bidder to quote amount as per volume 6
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail