Procurement Of Various Type Of Boiler Tube Bends & Reducer For Boiler Unit No. 1 & 2 At 2X600mw Sstpp, Mppgcl, Dongalia-- 1 Divisional SH inner mostBends ( 51X8.8;714, SA 213 T22,R100,180DEG) 2 Economizer Tube Bends ( 38.1X5.3, 1119.7, SA 210 Gr.A1, R 38.1, 180°) 3 Economizer Tube Bends ( 38.1X5.3, 1359.2, SA 210 Gr.A1, R 114.3, 180°) 4 Economizer Tube Bends ( 38.1X5.3, 1179.6, SA 210 Gr.C, R 114.3, 90°) 5 LTSH TUBE BEND 51X6.6, 1160, SA 213T11, R51, 180° 6 LTSH TUBE BEND 51X6.6, 874, SA 213T11, R151, 180° 7 LTSH TUBE BEND 51X6.6, 637, SA 213T11, R151, 90° 8 LTSH TUBE BEND 51X6.0, 1160, SA 213T11, R51, 180° 9 LTSH TUBE BEND 51X6.0, 847, SA 213T11, R151, 180° 10 LTSH TUBE BEND 51X6.0, 637, SA 213T11, R151, 90° 11 Water Wall Offset Bends Row -a, As per Drawing-A [ 63.5 X 7.10, SA 210 Gr.C] 12 Water Wall Offset Bends Row -b ,As per Drawing-A [ 63.5 X 7.10, SA 210 Gr.C] 13 Water Wall Offset Bends Row -c ,As per Drawing-A [ 63.5 X 7.10 ,SA 210 Gr.C] 14 Water Wall Offset Bends Row -d ,As per Drawing-A [ 63.5 X 7.10 ,SA 210 Gr.C] 15 Steam Cooled Wall Offset Bends-Mark No.3, As per Drawing-B [ 38.1X5.30, SA 210 Gr.A1] 16 Steam Cooled Wall Offset Bends-Mark No.4, As per Drawing-B [ 38.1X5.30, SA 210 Gr.A1] 17 Steam Cooled Wall Offset Bends-Mark No.5, As per Drawing-B [ 38.1X5.30, SA 210 Gr.A1] 18 Steam Cooled Wall Offset Bends-Mark No.5, As per Drawing-B [ 38.1X5.30, SA 210 Gr.A1] 19 Swaged Reducer ? 63.5 swaged to ? 51.0, Thk.= 7.1 mm, SA 210 Gr.C. 20 Swaged Reducer ? 44.5 swaged to ? 38.1, Thk.=( 7.1 mm at the portion ? 44.5 & 5.3 at the portion ? 38.1) , SA 210 Gr.C.