Uttarakhand Power Corporation Limited-UPCL has published Tender For Construction Of 11 Kv Line For Providing Connection To Vasukinag Drinking Water Scheme Jal Jeewan Mission Jjm On Turn Key Basis Under Edd Pithoragarh Under Deposit Head. Submission Date for this Tender is 17-04-2023. Transmission Line Tenders in pithoragarh Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Apr-2023 | REVISED BOQ | Other | 17-04-2023 |
Sl. No. | Item Description |
1 | SUPPLY OF CENTRALISED MATERIAL |
2 | Pole STP SP23 8.5 Mtr long (Hot bouttom deep) |
3 | MS Channel 100x50mm |
4 | MS Angle 50x50x6mm |
5 | 11 KV polymer Pin insulator with Nut |
6 | 11 KV polymer Disc insulator with Nut |
7 | 11 KV Disc fitting 45 KN |
8 | ACSR weasel conductor for earthing |
9 | ACSR Rabbitconductor |
10 | Stay Set 16x1800 mm |
11 | Stay wire 7/10 SWG |
12 | MS earth rod 20x2500mm |
13 | Earth wire 7/16 SWG |
14 | 11 KV PRMC 20/5 (S/S side& end Side ) |
15 | L.T. Pil.resi M.C. CTR for all ration (C.T. Accuracy Class-1) |
16 | 11 KV FDR VCB Pannel 350/500 MVA |
17 | 11 KV XLPE Cable 3x120 sqmm |
18 | 11kv XLPE Cable jointingkit 3x120 sq mmIndoor |
19 | 11kv XLPE Cable jointingkit 3x120 sq mmOutdoor |
20 | 11 KV GO switch |
21 | 11/0.4 KV,25 to63 KVA T/F |
22 | LT XLPE 1X70sqmm |
23 | 9 KV 5KA Lighting arrester polymer |
24 | MS earth rod 20x2500mm |
25 | GI wire 10 SWG for earthing |
26 | MS channel 75x75x8 mm |
27 | ACSR weasel conductor |
28 | Pole STP SP21 8.5 Mtr long (bottom portion hot dip galvanized) |
29 | Stay set 16x1800mm |
30 | Stay wire 7/10 SWG |
31 | SUPPLY OF NON CENTRALISED MATERIAL |
32 | Top Channel holding Clamp for SP23 with N&B |
33 | Bracing Clamp for Top with N&B |
34 | Bracing Clamp for Bouttom with N&B |
35 | Stay Clamp for SP23 with N&B D/E |
36 | Stay Clamp for SP23 with N&B S/E |
37 | Earth Wire Clamp with N&B |
38 | 11 KV Fuse Set |
39 | Stay Insulator |
40 | Alu. Lugs HT |
41 | Alu. Lugs LT |
42 | Holding Clamp for T/F Base |
43 | LT Shackle insulator clamp for SP21 |
44 | Shackle insulator for SP-21 |
45 | LT Stay Clamp |
46 | LABOUR CHARGE |
47 | Cartage of pole road site of work by roadtransport. |
48 | STP SP23 8.5 mtr long |
49 | Cartage of other line matrials conductor, clamp, insulator, etc road site of work by roadtransport. |
50 | Cartage of 11 KV FDR VCB Pannel 350/500 MVA road site of work by roadtransport. |
51 | Head load Cartage of Pole & Other All material from road side to work side .Avgg. Dist. 4 km |
52 | STP SP23 8.5 mtr long |
53 | Small matrial |
54 | Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
55 | STP SP23 8.5 mtr long |
56 | Erecation of following Single/ Double pole of HTline in proper level and alignment along with fixing of all accessories like top channel and clamp as perRESPO |
57 | Fourpole of SP-23 |
58 | Doublepole of SP-23 |
59 | Singlepole of SP-23 |
60 | Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
61 | Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc. |
62 | Fabrication of MS Channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing, and speecial type bracket etc. |
63 | Excavation of earth for Stayof size 0.6x.6x1.2 mtrin all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
64 | Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO |
65 | 11 KVStay |
66 | Grouting of Stay in size 0.6x0.6x1.2 Mtrin 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
67 | Earthing of support with MS earth rod of 2.5 mtr long to proper depth and connecting pole by earth wire as per RESPO |
68 | Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart |
69 | ACSR Rabbit conductor 3 P 4 W. |
70 | Mounting & fixing of TPMO on doubal pole structure includng making of connection complete work. |
71 | Mounting & fixing of fuse set on doubal pole structure includng making of connection complete work. |
72 | Jointing and fixing of cable jointing kits indoor/outdoor for 11KV cable |
73 | Providing an dfixing of danger board and number plate complete by providing M Sflate clamp 50x6 mm with N&B |
74 | Installation of 11 KV Metering cubical in the metering room with groutingand making all connection. And CT&PT unit |
75 | Erecation of 11 KV VCB Pannel in all respect making connection testing in all respect at S/S |
76 | Route cleareance by of tree branches by looping and chopping of tree for 11 KV line |
77 | Retaing wall as per annexture -1 |
78 | Cartage of other matrialsfrom store center pithoragarh to road site of work including loading & unloding by roadtransport. Avgg. Dist. 125 km |
79 | 11/0.4 KV, 63 KVA T/F |
80 | Head load cartage of the following transformer with loading and unloading T/F/KmAvg. Dist 4.00 Km |
81 | 11/0.4 KV, 63 KVA T/F |
82 | Small matrial |
83 | Installation/mounting of new transformer on double pole structure and fixing of channel/angle.and making connection of HT/LT side and its complete connections. |
84 | 11/0.4 KV, 63 KVA T/F |
85 | Grouting of earth rod 2500 mm 0.6 mtr. below from ground level and 2.5 mtr. away from the pole. Connection of earth rod with pole by G.I. wire and nut bolt. |
86 | Mounting and Fixing of L.A. Set (03 No./T/F) on double pole structure including making of all connection.Complete Job |
87 | Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm placing of earthing electrode to (to be supplyed by contractors) connecting the same with GI strip of size 35x6mm minim length 6mtr,tretment of soil with highly conductive substance as per IS |
88 | Cartage of pole from store center pithoragarh to road site of work by roadtransport. Avgg. Dist. 125 km |
89 | STP SP21 8.5 mtr long |
90 | Cartage of other line matrials conductor, clamp, insulator etc.from store center pithoragarh to road site of work by roadtransport. Avgg. Dist. 50 km |
91 | Head load Cartage of Pole & Other material fromroad side to wotk sideApproximate distance 4 km. |
92 | SP-21 pole |
93 | Small matrial |
94 | Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
95 | Erecation of following single pole in proper level and alignment along with fixing of all accessories like top channel and clamp as perRESPO |
96 | Single pole of SP21 |
97 | Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
98 | Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc. |
99 | Excavation of earth for Stayof size 0.6x.6x1.2 mtrin all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work. |
100 | Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO |
101 | LT Stay |
102 | Grouting of Stay in size 0.6x0.6x1.2 Mtrin 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO |
103 | Laying, spreading , striging and sagging of LT line of thefollowing wire as phacomplete with binding and Jumpring as per RESPO |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail