Tender For Construction Of 11 Kv Line For Providing Connection To Pokhari Drinking Water Scheme Jal Jeewan Mission Jjm On Turn Key Basis Under Edd Pithoragarh Under Deposit Head, pithoragarh-Uttarakhand

Uttarakhand Power Corporation Limited-UPCL has published Tender For Construction Of 11 Kv Line For Providing Connection To Pokhari Drinking Water Scheme Jal Jeewan Mission Jjm On Turn Key Basis Under Edd Pithoragarh Under Deposit Head. Submission Date for this Tender is 17-04-2023. Transmission Line Tenders in pithoragarh Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

37124099
Corrigendum : Tender For Construction Of 11 Kv Line For Providing Connection To Pokhari Drinking Water Scheme Jal Jeewan Mission Jjm On Turn Key Basis Under Edd Pithoragarh Under Deposit Head
Open Tender
Indian
Uttarakhand
pithoragarh
17-04-2023

Tender Details

Construction Of 11 Kv Line For Providing New Connection For 423 ( 5 Stage ) Kw Loadto Pokhari ( Gangolihat ) At Gangolihat Pumping Payjal Yojana For Jal Jeewan Mission ( Jjm ) On Turn Key Basisunder Electricity Distribution Division Pithoragarh Under Deposit Head - 1 Supply Of Centralised Material 2 Pole Stp Sp23 8.5 Mtr Long ( Hot Bouttom Deep ) 3 Ms Channel 100X50mm 4 Ms Angle 50X50x6mm 5 11 Kv Polymer Pin Insulator With Nut 6 11 Kv Polymer Disc Insulator With Nut 7 11 Kv Disc Fitting 45 Kn 8 Acsr Weasel Conductor For Earthing 9 Acsr Rabbitconductor 10 Stay Set 16X1800 Mm 11 Stay Wire 7 / 10 Swg 12 Ms Earth Rod 20X2500mm 13 Earth Wire 7 / 16 Swg 14 L.T. Xlpe Cable 1X400 Sqmm 15 11Kv Xlpe Cable Jointingkit 3X120 Sq Mmindoor 16 11Kv Xlpe Cable Jointingkit 3X120 Sq Mmoutdoor 17 11 Kv Prmc 20 / 5 ( S / S Side& End Side ) 18 L.T. Pil.Resi M.C. Ctr For All Ration ( C.T. Accuracy Class-1 ) 19 11 Kv Fdr Vcb Pannel 300 / 500 Mva- 400 / 200 / 5A A 20 11 Kv Go Switch 21 11 / 0.4 Kv, 16 To100 Kva T / F 22 11 / 0.4 Kv, 25 To63 Kva T / F 23 Lt Xlpe 1X70sqmm 24 9 Kv 5Ka Lighting Arrester Polymer 25 Ms Earth Rod 20X2500mm 26 Gi Wire 10 Swg For Earthing 27 Ms Channel 75X75x8 Mm 28 Acsr Weasel Conductor 29 Pole Stp Sp21 8.5 Mtr Long ( Bottom Portion Hot Dip Galvanized ) 30 Stay Set 16X1800mm 31 Stay Wire 7 / 10 Swg 32 Supply Of Non Centralised Material 33 Top Channel Holding Clamp For Sp23 With N&B 34 Bracing Clamp For Top With N&B 35 Bracing Clamp For Bouttom With N&B 36 Stay Clamp For Sp23 With N&B D / E 37 Stay Clamp For Sp23 With N&B S / E 38 Stay Insulator 39 Earth Wire Clamp With N&B 40 11 Kv Fuse Set 41 Alu. Lugs Ht 42 Alu. Lugs Lt 43 Holding Clamp For T / F Base And Fuse Set 44 Lt Shackle Insulator Clamp For Sp21 45 Shackle Insulator For Sp-21 46 Lt Stay Clamp 47 Labour Charge 48 Cartage Of Pole From Road Site Of Work By Roadtransport. 49 Stp Sp23 8.5 Mtr Long 50 Cartage Of Other Line Matrials Conductor, Clamp, Insulator Etc.From Store Center Pithoragarh To Road Site Of Work By Roadtransport. Avgg. Dist. 100-150 Km 51 Cartage Of 11 Kv Fdr Vcb Pannel 350 / 500 Mva Road Site Of Work By Roadtransport. 52 Head Load Cartage Of Pole & Other Material Fromroad Side To Wotk Sideapproximate Distance 4 Km. 53 Stp Sp23 8.5 Mtr Long 54 Small Matrial 55 Excavation Of Earth For Pole Of Size 0.9X.6X1 / 6 Of Full Length Of Pole For Erecation Of Pole In All Type Of Soil Including As Per Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposel Surpplus Excavated Soil As Directed Complete Work. 56 Stp Sp23 8.5 Mtr Long 57 Erecation Of Following Single / Double Pole Of Htline In Proper Level And Alignment Along With Fixing Of All Accessories Like Top Channel And Clamp As Perrespo 58 Doublepole Of Sp23 59 Single Pole Sp-23 60 Fourpole Of Sp23 61 Grouting Of Pole In Size .45X.45X1 / 9Of The Pole In 1:4:8 Cc Including Cost Of Cement Sand And Stone Ballast Back Filling Of Soil And Bolder In Pit And Ramming And Proper Aligment Leveeling As Per Respo 62 Muffing Of Poles 0.45X0.45X0.300 Mm With 1:3:6 Cc Block And 45Cm Hight From Ground Level Including Cost Of Blast Cement Etc. 63 Fabrication Of Ms Channel Angle Iron After Cutting In Required Sizes With Drilling Of Holes Upto Good Finish For Top Channel, Bracing, And Speecial Type Bracket Etc. 64 Excavation Of Earth For Stayof Size 0.6X.6X1.2 Mtrin All Type Of Soil Including As Per Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposel Surpplus Excavated Soil As Directed Complete Work. 65 Fixing, Tighting Stay And Nozzling Sagging With Pole And Stay Rod On Required Tension As Per Respo 66 11 Kvstay 67 Grouting Of Stay In Size 0.6X0.6X1.2 Mtrin 1:4:8 Cc Including Cost Of Cement Sand And Stone Ballast Back Filling Of Soil And Bolder In Pit And Ramming And Proper Aligment Leveeling As Per Respo 68 Earthing Of Support With Ms Earth Rod Of 2.5 Mtr Long To Proper Depth And Connecting Pole By Earth Wire As Per Respo 69 Laying, Spreading, Stringing And Sagging Of 11 Kv Line In 3 P 4 W Of The Rabbit Conductor With Gi Earth Wire Complete Including Fixing Of All Accessories In 3 Nos Conductor In Parallel With Binding And Jupering As Per Profile And Sagging Chart 70 Acsr Rabbit Conductor 3 P 4 W. 71 Mounting & Fixing Of Tpmo On Double Pole Structure Including Making Of Connection Complete Work Fuse Set On Doubal Pole Structure Includng Making Of Connection Complete Work. 72 Mounting & Fixing Of Fuse Set & 11 Kv Go Switch On Doubal Pole Structure Includng Making Of Connection Complete Work. 73 Jointing And Fixing Of Cable Jointing Kits Indoor / Outdoor For 11Kv Cable 74 Providing An Dfixing Of Danger Board And Number Plate Complete By Providing M Sflate Clamp 50X6 Mm With N&B 75 Installation Of 11 Kv Metering Cubical In The Metering Room With Groutingand Making All Connection. And Ct&Pt Unit 76 Erecation Of 11 Kv Vcb Pannel In All Respect Making Connection Testing In All Respect At S / S 77 Route Cleareance By Of Tree Branches By Looping And Chopping Of Tree For 11 Kv Line 78 Retaing Wall As Per Annexture -1 79 Cartage Of Other Matrials Road Site Of Work Including Loading & Unloding By Roadtransport. 80 11 / 0.4 Kv, 100 Kva T / F 81 11 / 0.4 Kv, 63 Kva T / F 82 Head Load Cartage Of The Following Transformer With Loading And Unloading T / F / Kmavg. Dist 4.00 Km 83 11 / 0.4 Kv, 100 Kva T / F 84 11 / 0.4 Kv, 63 Kva T / F 85 Small Matrial 86 Installation / Mounting Of New Transformer On Double Pole Structure And Fixing Of Channel / Angle.And Making Connection Of Ht / Lt Side And Its Complete Connections. 87 11 / 0.4 Kv, 100 Kva T / F 88 11 / 0.4 Kv, 63 Kva T / F 89 Grouting Of Earth Rod 2500 Mm 0.6 Mtr. Below From Ground Level And 2.5 Mtr. Away From The Pole. Connection Of Earth Rod With Pole By G.I. Wire And Nut Bolt. 90 Mounting And Fixing Of L.A. Set ( 03 No. / T / F ) On Double Pole Structure Including Making Of All Connection.Complete Job 91 Earthing Of Distribution Transformer Including Digging Of Pit Of Size 2.5 Mtr Depth And Make Hole Of Size 150 Mm Placing Of Earthing Electrode To ( To Be Supplyed By Contractors ) Connecting The Same With Gi Strip Of Size 35X6mm Minim Length 6Mtr, Tretment Of Soil With Highly Conductive Substance As Per Is 92 Cartage Of Pole From Store Center Pithoragarh To Road Site Of Work By Roadtransport. Avgg. Dist. 50 Km 93 Stp Sp21 8.5 Mtr Long 94 Cartage Of Other Line Matrials Conductor, Clamp, Insulator Etc.From Store Center Pithoragarh To Road Site Of Work By Roadtransport. Avgg. Dist. 50 Km 95 Head Load Cartage Of Pole & Other Material Fromroad Side To Wotk Sideapproximate Distance 4 Km. 96 Sp-21 Pole 97 Small Matrial 98 Excavation Of Earth For Pole Of Size 0.9X.6X1 / 6 Of Full Length Of Pole For Erecation Of Pole In All Type Of Soil Including As Per Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposel Surpplus Excavated Soil As Directed Complete Work. 99 Erecation Of Following Single Pole In Proper Level And Alignment Along With Fixing Of All Accessories Like Top Channel And Clamp As Perrespo 100 Single Pole Of Sp21 101 Grouting Of Pole In Size .45X.45X1 / 9Of The Pole In 1:4:8 Cc Including Cost Of Cement Sand And Stone Ballast Back Filling Of Soil And Bolder In Pit And Ramming And Proper Aligment Leveeling As Per Respo 102 Muffing Of Poles 0.45X0.45X0.300 Mm With 1:3:6 Cc Block And 45Cm Hight From Ground Level Including Cost Of Blast Cement Etc. 103 Excavation Of Earth For Stayof Size 0.6X.6X1.2 Mtrin All Type Of Soil Including As Per Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposel Surpplus Excavated Soil As Directed Complete Work. 104 Fixing, Tighting Stay And Nozzling Sagging With Pole And Stay Rod On Required Tension As Per Respo 105 Lt Stay 106 Grouting Of Stay In Size 0.6X0.6X1.2 Mtrin 1:4:8 Cc Including Cost Of Cement Sand And Stone Ballast Back Filling Of Soil And Bolder In Pit And Ramming And Proper Aligment Leveeling As Per Respo 107 Laying, Spreading , Striging And Sagging Of Lt Line Of Thefollowing Wire As Phacomplete With Binding And Jumpring As Per Respo

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Apr-2023 CORRIGENDUM Other 17-04-2023

Key Value

Document Fees
INR 11800 /-
EMD
INR 401000.0 /-
Tender Value
INR 2 Crore /-

BOQ Items

Name of Work:Construction of 11 KV line for providing new connection for 423 (5 Stage) KW loadto Pokhari (Gangolihat) at Gangolihat pumping payjal yojana for Jal Jeewan Mission(JJM) on turn key basisunder Electricity Distribution Division Pithoragarh under Deposit Head.
Sl. No. Item Description
1SUPPLY OF CENTRALISED MATERIAL
2Pole STP SP23 8.5 Mtr long (Hot bouttom deep)
3MS Channel 100x50mm
4MS Angle 50x50x6mm
511 KV polymer Pin insulator with Nut
611 KV polymer Disc insulator with Nut
711 KV Disc fitting 45 KN
8ACSR weasel conductor for earthing
9ACSR Rabbitconductor
10Stay Set 16x1800 mm
11Stay wire 7/10 SWG
12MS earth rod 20x2500mm
13Earth wire 7/16 SWG
14L.T. XLPE Cable 1x400 sqmm
1511kv XLPE Cable jointingkit 3x120 sq mmindoor
1611kv XLPE Cable jointingkit 3x120 sq mmOutdoor
1711 KV PRMC 20/5 (S/S side& end Side )
18L.T. Pil.resi M.C. CTR for all ration (C.T. Accuracy Class-1)
1911 KV FDR VCB Pannel 300/500 MVA- 400/200/5A A
2011 KV GO switch
2111/0.4 KV,16 to100 KVA T/F
2211/0.4 KV,25 to63 KVA T/F
23LT XLPE 1X70sqmm
249 KV 5KA Lighting arrester polymer
25MS earth rod 20x2500mm
26GI wire 10 SWG for earthing
27MS channel 75x75x8 mm
28ACSR weasel conductor
29Pole STP SP21 8.5 Mtr long (bottom portion hot dip galvanized)
30Stay set 16x1800mm
31Stay wire 7/10 SWG
32SUPPLY OF NON CENTRALISED MATERIAL
33Top channel holding clamp for SP23 with N&B
34Bracing clamp for top with N&B
35Bracing clamp for Bouttom with N&B
36Stay clamp for SP23 with N&B D/E
37Stay clamp for SP23 with N&B S/E
38Stay Insulator
39Earth Wire Clamp with N&B
4011 KV Fuse Set
41Alu. Lugs HT
42Alu. Lugs LT
43Holding Clamp for T/F Base and Fuse Set
44LT Shackle insulator clamp for SP21
45Shackle insulator for SP-21
46LT Stay Clamp
47LABOUR CHARGE
48Cartage of Pole from Road site of work by roadtransport.
49STP SP23 8.5 mtr long
50Cartage of other line matrials conductor, clamp, insulator etc.from store center pithoragarh to road site of work by roadtransport. Avgg. Dist. 100-150 km
51Cartage of 11 KV FDR VCB Pannel 350/500 MVA road site of work by roadtransport.
52Head load Cartage of Pole & Other material fromroad side to wotk sideApproximate distance 4 km.
53STP SP23 8.5 mtr long
54Small matrial
55Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
56STP SP23 8.5 mtr long
57Erecation of following Single/ Double pole of HTline in proper level and alignment along with fixing of all accessories like top channel and clamp as perRESPO
58Doublepole of SP23
59Single Pole SP-23
60Fourpole of SP23
61Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
62Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc.
63Fabrication of MS Channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing, and speecial type bracket etc.
64Excavation of earth for Stayof size 0.6x.6x1.2 mtrin all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
65Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO
6611 KVStay
67Grouting of Stay in size 0.6x0.6x1.2 Mtrin 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
68Earthing of support with MS earth rod of 2.5 mtr long to proper depth and connecting pole by earth wire as per RESPO
69Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
70ACSR Rabbit conductor 3 P 4 W.
71Mounting & fixing of TPMO on double pole Structure including making of connection complete work fuse set on doubal pole structure includng making of connection complete work.
72Mounting & fixing of fuse set & 11 kv GO Switch on doubal pole structure includng making of connection complete work.
73Jointing and fixing of cable jointing kits indoor/outdoor for 11KV cable
74Providing an dfixing of danger board and number plate complete by providing M Sflate clamp 50x6 mm with N&B
75Installation of 11 KV Metering cubical in the metering room with groutingand making all connection. And CT&PT unit
76Erecation of 11 KV VCB Pannel in all respect making connection testing in all respect at S/s
77Route cleareance by of tree branches by looping and chopping of tree for 11 KV line
78Retaing wall as per annexture -1
79Cartage of other matrials road site of work including loading & unloding by roadtransport.
8011/0.4 KV, 100 KVA T/F
8111/0.4 KV, 63 KVA T/F
82Head load cartage of the following transformer with loading and unloading T/F/KmAvg. Dist 4.00 Km
8311/0.4 KV, 100 KVA T/F
8411/0.4 KV, 63 KVA T/F
85Small matrial
86Installation/mounting of new transformer on double pole structure and fixing of channel/angle.and making connection of HT/LT side and its complete connections.
8711/0.4 KV, 100 KVA T/F
8811/0.4 KV, 63 KVA T/F
89Grouting of earth rod 2500 mm 0.6 mtr. below from ground level and 2.5 mtr. away from the pole. Connection of earth rod with pole by G.I. wire and nut bolt.
90Mounting and Fixing of L.A. Set (03 No./T/F) on double pole structure including making of all connection.Complete Job
91Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm placing of earthing electrode to (to be supplyed by contractors) connecting the same with GI strip of size 35x6mm minim length 6mtr,tretment of soil with highly conductive substance as per IS
92Cartage of pole from store center pithoragarh to road site of work by roadtransport. Avgg. Dist. 50 km
93STP SP21 8.5 mtr long
94Cartage of other line matrials conductor, clamp, insulator etc.from store center pithoragarh to road site of work by roadtransport. Avgg. Dist. 50 km
95Head load Cartage of Pole & Other material fromroad side to wotk sideApproximate distance 4 km.
96SP-21 pole
97Small matrial
98Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
99Erecation of following single pole in proper level and alignment along with fixing of all accessories like top channel and clamp as perRESPO
100Single pole of SP21
101Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
102Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc.
103Excavation of earth for Stayof size 0.6x.6x1.2 mtrin all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
104Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO
105LT Stay
106Grouting of Stay in size 0.6x0.6x1.2 Mtrin 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
107Laying, spreading , striging and sagging of LT line of thefollowing wire as phacomplete with binding and Jumpring as per RESPO
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail