| 1 | At Blocks |
| 2 | 16 port OLT with Dual PSU with 2X10G SFP |
| 3 | 8 port OLT with Dual PSU with 2X10G SFP |
| 4 | 10G SR SFP Transceiver (OLT Side) |
| 5 | 10G SR SFP Transceiver (MPLS Router side) |
| 6 | 24 Port Fibre LIU (FDMS) |
| 7 | 1G single Mode SFP (MPLS Router side) |
| 8 | Multimode Fibre Patch Cord -3 metres |
| 9 | Singlemode Simplex Patch Cord-3metres |
| 10 | Aerial Optical Fibre Cable ADSS OFC 24 Core |
| 11 | Aerial Optical Fibre Cable ADSS OFC 12 Core |
| 12 | Singing/Laying of ADSS 6F/12F/24F core of Optical Fibre Cable on EB poles or new poles wherever required |
| 13 | Formed OFC Dead End & Termination Fittings @12 per km (wedge type)- Dead End Termination/Tensioning Clamp assembly for the poles having cable angle deviation above 25deg or at tension point/poles (2 No-Anchoring clamp, 1 no-pole Bracket, 1.5 Mtrs-Stainless Steel Strap, 2 Nos-Buckles)@3 per km-(Wedge Type-Type 3) |
| 14 | OFC suspension Fittings @8 per km (wedge Type) |
| 15 | Adjustable Cable Storage Bracket@5 per km (One loop bracket 1.5 mtrs stainless steel strap & 2 nos buckles) wedge Type |
| 16 | Supply& Erection of GI pole as mentioned in Technical Specifications (6 metre) |
| 17 | Straight Joint Closure/Branch Joint Closure@ one per 2 km+10% extra |
| 18 | Splitter (1:4) |
| 19 | At GPs |
| 20 | 4 port OLT with single PSU with 2X1G SFP |
| 21 | 8 port OLT with Dual PSU with 2X1G SFP |
| 22 | 1G SR SFP Transceiver (OLT Side) |
| 23 | 1G Singlemode SFP |
| 24 | 12 Port Fibre LIU (FDMS) |
| 25 | 24 port Fibre LIU (FDMS) |
| 26 | Multimode Fibre Patch Cord -3 metres |
| 27 | Singlemode Simplex Patch Cord-3metres |
| 28 | Aerial Optical Fibre Cable ADSS OFC 12 Core |
| 29 | Aerial Optical Cable ADSS OFC 6 Core |
| 30 | Slinging/Laying of ADSS 6F/12F/24F core of optical fibre cable on EB poles or new poles wherever required |
| 31 | Formed OFC Dead End & Termination Fittings @12 per km (wedge type)- Dead End Termination/Tensioning Clamp assembly for the poles having cable angle deviation above 25deg or at tension point/poles (2 No-Anchoring clamp, 1 no-pole Bracket, 1.5 Mtrs-Stainles steel strap, 2-nos buckles)@3 per km-(wedge Type-Type3) |
| 32 | OFC suspension Fittings @8 per km (wedge Type) |
| 33 | Adjustable Cable Storage Bracket@5 per km (One loop bracket 1.5 mtrs stainless steel strap & 2 nos buckles) wedge Type |
| 34 | Supply& Erection of GI pole as mentioned in Technical Specifications (6 metre) |
| 35 | Straight Joint Closure/Branch Joint Closure@ one per 2 km+10% extra |
| 36 | Splitter (1:4) |
| 37 | 6U Rack |
| 38 | 1KVA UPS |
| 39 | Government Offices-Type 3&4 |
| 40 | ONT without WIFI including Splitter |
| 41 | ONT with WIFI including splitter |
| 42 | ONT with Redundancy (Type3) |
| 43 | Fibre enclosure kit |
| 44 | Fibre Patch Cord (Simplex) |
| 45 | Government offices-Type 1&2 |
| 46 | Access Router along with two Single Mode SFP |
| 47 | 12 Port Fibre LIU (FDMS) |
| 48 | Fibre Patch Cord |
| 49 | Rack |
| 50 | State NOC |
| 51 | Servers and Storage for EMS Solution |
| 52 | GPON EMS Application Software |
| 53 | Installation Services |
| 54 | Block Installation Services |
| 55 | GP installation services |
| 56 | State NOC EMS Implementation and Integration Services with TANFINET EMS and BSS Solution |
| 57 | Instalaltion and Integration services at each government office |
| 58 | Underground Fibre Cabling (DHQ to Nearest Blocks for TNSWAN) |
| 59 | Underground Optical Fibre Cable 96 Core Ribbion Type |
| 60 | Supply and Installation of DWC pipe (75/61mm) @ 100m per km |
| 61 | Supply and installation od FDMS outdoor (Joint Closure) |
| 62 | Supply and installation of Route/Joint Indicator (5 per km) |
| 63 | Supply and installation of mnahole, joint chamber & loop champer @1 Per km |
| 64 | Supply and installation of HDPE PLB DUCT (40mm/33mm) with all accessories like coupler, End Cap, Simppex Plug etc |
| 65 | Excavation of trench, PLB pipe laying, Bankfiling, Reinstatement and compaction after laying of PLB pipe, puling/laying/blowing of optical fibre cable inside laid PLB pipe, splicing and jointing of 96F UD Optical Fibre cable |
| 66 | GI pipe and Accessories |
| 67 | 10G 10KM Singlemode SFP+ |
| 68 | PRICE BID-PART B |
| 69 | Operation & Maintenance cost for 3 years |
| 70 | State NOC Infrastructure |
| 71 | OFC including splitters, enclosures, poles etc |
| 72 | OLT devices along with all allied equipments and accessories |
| 73 | ONT devices along with all allied equipment and accessories |
| 74 | Access Routers along with all allied equipment and accessories |