|
| 1 | The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EUDD-I Bareilly Approx. distance upto 30 Km. Including safe loading and unloading. |
| 2 | ST Pole 11 Mtr |
| 3 | 11 KV XLPE Cable 3x120 Sq mm |
| 4 | Outdoor Cable Jointing Kit for 11 KV XLPE Cable 3x120 Sq mm |
| 5 | 250 KVA DTR |
| 6 | 400 KVA DTR |
| 7 | 630 KVA DTR |
| 8 | LT XLPE CABLE AL. 1*400 SQ MM |
| 9 | LT XLPE CABLE AL. 1*630 SQ MM |
| 10 | LT XLPE CABLE AL. 1*1000 SQ MM |
| 11 | 3 Phase D.O. Fuse Set |
| 12 | LT AB Cable (3x120 Sqmm) |
| 13 | ACSR Weasal Conductor |
| 14 | Other Line material i.e.,11 KV pin insulator/stay/earthing complete/Dropper Channel/ Top Channel, 3 phase distribution box,TPMO, etc. |
| 15 | Erection of Single/Double pole in H.T line including fitting of all accessories as per RESSPO Norms |
| 16 | STPole 11 Mtr long (Single) |
| 17 | STPole 11 Mtr long (Double) |
| 18 | Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
| 19 | STPole 11 Mtr long (Single) |
| 20 | STPole 11 Mtr long (Double) |
| 21 | Earthing of ST Poleas per RESSPO Norms |
| 22 | Overhead laying of 11 KV XLPE 3x185 sq mm cable in Single circuit by hanging from pole with the help of stay wire and clamps |
| 23 | Making of Outdoor 11 KV Cable Jointing kit for 3x185 sqmm XLPE Cable complete in all respect |
| 24 | The work of digging of pits, erection of danger board,barbed wire, Clamp, Insulator etc. |
| 25 | Supply of following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost) |
| 26 | Long barrel Al Lugs for 1*400 Sqmm cable |
| 27 | Long barrel Al Lugs for 1*630 Sqmm cable |
| 28 | Al Lugs for 1*1000 Sqmm cable |
| 29 | Piercing Connector |
| 30 | Clamp With Nut & Bolt |
| 31 | PG CLAMP with nut & bolt |
| 32 | Barbed wire |
| 33 | Danger board including clamp and nut bolt |
| 34 | Providing and fixing of Tail less unit 300AMP |
| 35 | Providing and fixing of Tail less unit 500AMP |
| 36 | Work of fabrication /construction and grouting of wire mesh fencing of 16 mtr running length/as per site requirement in rectangular shape height 2 mtr with angle size of 45*45*5 mm including gate at one side as per RESPO norms (Material will be supplied by contractor) |
| 37 | Construction of plinth complete (2.0m*2.0m*1.5m) by providing first class bricks as per RESPO norms (Material will be supplied by contractor) |
| 38 | Earthing of distribution transformer for body / neutral upto water level with GI pipe of 1.5 inch dia including mild steel strip size 35*6 mm (Material will be supplied by contractor) |
| 39 | Erection of new 250 KVA T/F on plinth by laying of cable, jumpering & commissioning of T/F |
| 40 | Dismantling of old 100 KVA/160KVA T/F from site and back carriage from site to CB Ganj store including loading and unloading |
| 41 | Erection of new 400 KVA T/F on plinth/double pole by laying of cable, jumpering & commissioning of T/F |
| 42 | Dismantling of old 250 KVA T/F from site and back carriage from site to CB Ganj store including loading and unloading |
| 43 | Erection of new 630 KVA T/F on plinth/double pole by laying of cable, jumpering & commissioning of T/F |
| 44 | Dismantling of old 400 KVA T/F from site and back carriage from site to CB Ganj store including loading and unloading |
| 45 | Laying of LT AB Cable (3x120 Sqmm) |
| 46 | Erection and fixing of 3 phase distribution box and making all connections |
| 47 | Erection of stay set complete including its grouting as per RESPO norms |