Public Works Department-PWD has published Tender For Shifting Lt Line With Distribution Transfomer (All Capacity )Which Are Installd Be Side The Madnapur To Village Bhudhbana Village Making New Line At Suitable. Submission Date for this Tender is 10-04-2023. Overhead Line Tenders in shahjahanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC PCC POLE 8.5 MTR LONG |
2 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ABC 3*50+1*35+1*16 SQ MM |
3 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ABC 3*95+1*70+1*16 SQ MM |
4 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC 3 PHASE D/B |
5 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC STAY SET COMPLETE(STAY ROD 20*1800 MM, STAY WIRE 10 KG,STAY CLAMP,BOLT&NUT) |
6 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC EARTHING OF POLE BY MS EARTHING ROD OF 20*2500 MM) & 6 SWG EARTHING WIRE |
7 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC DEAD & CLAMP WITH I HOOK |
8 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC SUSPENSION CLAMP |
9 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC I P C |
10 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC 3 PHASE D/B CLAMP |
11 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC NUT & BOLT OFF SAIZE |
12 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC StayShackel insulator |
13 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC GROUTING OF PCC 8.5 MTR LONG & 11 ST POLE |
14 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC DANGER BORD WITH CLAMP |
15 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC BARBAT WIRE |
16 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC CONCRETING OF STAY SET |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail