Public Works Department-PWD has published Tender For Shiftting Ht Line With Distribution Transfomer (All Capacity )Which Are Installd Be Side The Madnapur To Bhudhbana Making New Line At Suitable. Submission Date for this Tender is 10-04-2023. Distribution Transformer Tenders in shahjahanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC PCC POLE 8.5 MTR LONG |
2 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCST POLE 11.0 MTR LONG |
3 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCACSR WESELCONDUCTOR |
4 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCACSR RABIT CONDUCTOR |
5 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV DISK INSULATOR |
6 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV DISK FITING |
7 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV PIN INSULATOR |
8 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KVGI PIN WITH NUT & BOLT |
9 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV V-TYPE CROSS ARM |
10 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCTOP- CHANNEL FOR 11 KV |
11 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCT- OFF CHANNEL FOR 11 KV |
12 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCG.I WIRE 6 SWG |
13 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCG.I WIRE 8 SWG |
14 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCSTAY SET COMPLETE(STAY ROD 20*1800 MM, STAY WIRE 10 KG,STAY CLAMP,BOLT&NUT) |
15 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCEARTHING OF POLE BY MS EARTHING ROD OF 20*2500 MM) & 6 SWG EARTHING WIRE |
16 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV V-TYPE CROSS ARM CLAMP WITH BOLTS & NUTS |
17 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCMSANGLE 65*65*6 |
18 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC11-KV F- CLAMP WITH NUTS & BOLTS |
19 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCT- OFF CHANNEL CLAMP |
20 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCTOP-CHANNEL CLAMP |
21 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCPROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCGAURDING ANGLE |
22 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC GAURDING ANGLE CLAMP FOR ST POLE |
23 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC NUT & BOLT OFF SAIZE |
24 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC StayShackel insulator |
25 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC PAIPE ERTHING |
26 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC GROUTING OF PCC 8.5 MTR LONG & 11 ST POLE |
27 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC DANGER BORD WITH CLAMP |
28 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC BARBAT WIRE |
29 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC CONCRETING OF STAY SET |
30 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETCPAINT OF POLE BY RED OXIDE |
31 | PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC STONE PAD |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail