| 1 | PRILIMINARY EXPENSES |
| 2 | Ayacut Survey and Investigation |
| 3 | Elecrical feasibility study |
| 4 | Site clearance , approach road and allignment etc. |
| 5 | HEAD WORKS |
| 6 | Electric Pump set - 10HP |
| 7 | Panel board, starter, base plate , main switch, Motor hood cover |
| 8 | Suc / Delivery pipe and pipe fitting* |
| 9 | CI Standard Foot valve (4\" dia) |
| 10 | Nuts and bolts, white paints etc |
| 11 | GI socket (4\" dia) |
| 12 | GI Bend (4\" dia) |
| 13 | PVC RS 8\" x 4\" dia |
| 14 | PVC RS 8\" x 8\" equal tee |
| 15 | GI Flange (4\" dia) |
| 16 | CI Full way Valve(4\" dia) |
| 17 | CI Non Return Valve(4\" dia) |
| 18 | PVC Pr pipe 200mm dia with 4Kg/sqcm for rising main |
| 19 | PVC Pr pipe 200mm dia with 2.5Kg/sqcm for laying |
| 20 | Outlets, white paint and RI packing |
| 21 | 2\" dia air valve fittings |
| 22 | Intake well* |
| 23 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge |
| 24 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. |
| 25 | C.C.(1:3:6) with 40 mm. size h.g. metal in F&P. |
| 26 | RCC(1:2:4) using 12mm size broken hg chips. |
| 27 | Supplying , fitting and fixing of HYSD bar |
| 28 | Cement punning including cost of conveyance |
| 29 | 16 mm thick cement plaster in c.m(1:6) over stone masonry / RCC work. |
| 30 | Brick work with Fly Ash Bricks having crushing strength 75 kg/sq.cm in c.m. 1:6 in F & P including cost conveyance and royality of materials curing etc. complete as per direction |
| 31 | Fixed foudation* |
| 32 | DISTRIBUTION SYSTEM |
| 33 | PVC Pipe 200mm dia & 2.5 Kg /Sqcm for distribution |
| 34 | PVC Pipe 200mm dia for distribution |
| 35 | Construction of distribution tank with \" T \" close arrangement* |
| 36 | PVC fitting & Misc |
| 37 | ENERGISATION |
| 38 | Earthing and Motor Foundation |
| 39 | AT cable 6sqmm |
| 40 | Service connection and Inspection Fees |
| 41 | Power Capacitor and energy meter |
| 42 | Other accessaries |
| 43 | Pump House* (2.4 MTR X 2.4 MTR) |
| 44 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge |
| 45 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. |
| 46 | C.C.(1:3:6) with 40 mm. size h.g. metal in F&P. |
| 47 | Brick work with Fly Ash Bricks having crushing strength 75 kg/sq.cm in c.m. 1:6 in F & P including cost conveyance and royality of materials curing etc. complete as per direction |
| 48 | Brick work with Fly Ash .Bricks having crushing strength between 100kg/sq.cm to 149kg/sq.cm in c.m. 1:6 in Sup.Str. including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 49 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips includinghoisting and laying in ground floor. |
| 50 | Plinth band |
| 51 | BEAM |
| 52 | Roof |
| 53 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification in ground floor |
| 54 | 12 mm thick cement plaster in c.m(1:6) over brick masonry |
| 55 | Cement washing two coats over the plastered surface |
| 56 | Finishing walls with water proofing cement paint of approved shade two coat on old work to give an even shade including cost of paint. |
| 57 | 2.5 cm A.S.flooring with cement concrete (1:2:4) including punning using 12 mm size hard granite chips. |
| 58 | Supply, fitting and fixing of MS grill and ventilators including painting two coats over a coat of primer including cost of transportation. |
| 59 | Transportation cost |
| 60 | POWERLINE |
| 61 | Energy meter with panel,power capacitors, panel foundation, Display board etc |
| 62 | Construction and erection of 11 /0.4 KV, 25 KVA Double Pole mounted Substation Star rated confirming to RE Rules 1956, mounted on 2.44 Mr Long structure, supported in 300 kg 9 mtr long PSC pole, transformer hard channel& top channel made of 2.8 M Iong 100X 50 X 6 mm M.S. Channel (9.2 kg/mtr), Transformer belting on 2.80 M long 50 X 50 X 5 mm M.S. Angle(4.5 kg/mtr).. (all REC SPN Std.F-3) with all accessories like 3 pole 11 KV HG Fuse(F-5) & A.B. Switches (F-9) both mounted on 2.8 M long 75 X 40 X6 mm M.S. Channel and supported by 1.0 M long 50 X 50 X 6 mm M.S. Angle, with 3 No. 11 KV Lightening Arrestors & Distribution box for 25 KVA S/S, G.I. pipe earthling with 25X5mm G.I. Flats including cost of 25 KVA 11/0.4 K.V. 3 star rated Transformer 35 Sqmm 3 % Core PVC Cable 40 mtrcouping & padding of Poles, Danger board at each Pole, Anti climbing Devices & all other necessary fittings i.e required size Nuts & Bolts, Brackets, Cable, Cable Sockets etc. including cost of all materials, labour , transportation complete with liasioning for testing inspection & commissioning. |
| 63 | Construction of 3 phase 11 KV line as per REC standard confirming to IE Rules 1956 with 300 kg 9 Mtr long PSC Pole with 55 mm2 AAAC, 11 KV \"V\" Cross arm (10.2 k.g. each), with required No.of 11 KVT & C Disc. Insulators 70KN in tension point & 11 KV Pin insulators, Couping & Padding of Poles. Danger Board at each Pole, Anti Climbing Devices,Stay Set at Bending point& double stay at end point with 18 mm G.I.H.T.Stay, concreting of Stay with Anchor plate, guarding at Road crossings etc, including cost of all materials, labour ansportation, inspection & commissioning etc. complete. |
| 64 | Construction of 3 phase 4 wire Line using 8 mtr long 200 kg PSC Poles with LT XLPE AB Cable of (3X35 mmSq+ 1X25mm sq,) along with all required materials and concreting of stay/poles LT Dead end clamp, suspension clamp with I hook, stay accessories such as WireInsulators, clamp etc. to complete power supply as per the field condition |