|
| 1 | Insulation Piercing Satellite connector â?? Main :16 sq mm to 95 sqmm; Tap : 4 sq mm to 50 sq mm (4 way) |
| 2 | Stainless Steel Buckle Slot width 20.5 mm x 1.5 mm,Thickness 1.2mm. |
| 3 | Anchoring /Dead end Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 4 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 16 sq mm to 95 sq mm |
| 5 | Suspension Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 6 | Stainless Steel Strap 20 mm x 0.7 mm |
| 7 | Aerial Bunched Cable LT 3x70 + 1x50 + 1x16 sq.mm (Insulated Messenger) |
| 8 | Pre-Insulated Midspan Joints and Terminal Lugs 16 Sq.mm |
| 9 | Pre-Insulated Midspan Joints and Terminal Lugs 50 Sq.mm |
| 10 | Pre-Insulated Midspan Joints and Terminal Lugs 70 Sq.mm |
| 11 | End Cap for ABC 50 Sq mm |
| 12 | End Cap for ABC 16 Sq mm |
| 13 | End Cap for ABC 70 Sq mm |
| 14 | Cable Tie UV Plastic Heavy Duty 500 mm Length |
| 15 | Cable 1.1kV PVC Insulated AL Twin Core 2.5 Sq.mm PVC Sheathed Weather Proof-For Fault Padd Indicator (TC Weather Proof Wire 1/1.8-For Fault Pass indicator) |
| 16 | Cable 1.1kV PVC Insulated AL Twin Core 6 Sq.mm PVC Sheathed Weather Proof (TC Weather Proof Wire 1/2.8) |
| 17 | IPC FOR ABC 3X95+1X70+1X16 Tap 1.5-10 sqmm |
| 18 | Earthing Coil GI 115 Turns 50 mm internal Dia dia |
| 19 | Ferrules 5 Sq.mm(GI) |
| 20 | G.I.WIRE. 4MM (8 SWG) |
| 21 | Stainless Steel Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. |
| 22 | Stainless Steel Strap 10 mm x 0.7 mm-For clamping earth wire |
| 23 | Insulation Piercing Satellite connector â?? Main : 16 sq mm to 95 sq mm; Tap : 4 sq mm to 35 sq mm (4 way) |
| 24 | Anchoring /Dead end Clamp Assembly |
| 25 | SS Strap |
| 26 | Anchoring /Dead end Clamp Assembly for LT AB Cables up to 35 sq.mm |
| 27 | Insulation Piercing Connector (IPC Connector) Main 16 sq mm to 95 sq mm; Tap 1.5 sq.mm to 10 sq.mm |
| 28 | IPC FOR LT ABC3X70+1X50+1X16 Tap 16 - 95 sq .mm |
| 29 | SS strap for ABC Support at poles 20x0.4 mm |
| 30 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 31 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 32 | Erection of suspension clamp for LT ABC of any size |
| 33 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 34 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 35 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 36 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 37 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 38 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 39 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 40 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 41 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 42 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 43 | Providing End Caps |