Tender For Construction Of Smart Public Toilet Safetic Tank And Leachpit For Aman Palace
Tender Value
10.22 Lakhs
Estimated cost
Bid Submission
20 Apr 2023
0 days left
EMD
1.02 Lakhs
Bank guarantee accepted
Document Fee
1298
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
saharanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Smart Public Toilet Safetic Tank And Leachpit For Aman Palace
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling and cleaning of site before starting the work |
| 2 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 3 | P.C.C 1:4:8 with in cement and fine sand and 40 mm gauge brick ballast in all work complete |
| 4 | B/W in 1:6 with F/sand in foundation and plinth 230mm wall in all complete work |
| 5 | P/L damp proof course 2.5cm thick with cement concrete 1:2:4 in all complete |
| 6 | Painting on DPC with two coat of air blown bituman 85/50 to 85/25 @ 1.70kg/sqm in all complete work |
| 7 | B/W in 1:4 with cement and F/sand motor in foundation and plinth of apron, ramp, platform in all complete work |
| 8 | Sand filling under plinth including supply of necessary quality of earth form a distance not exceeding 8 km in all complete work |
| 9 | B/W in 1:6 in cement and fine sand mortor in superstructure in all complete work |
| 10 | B/W in 1:3 in cement and fine sand mortor in superstructure in all complete work |
| 11 | R.C.C work in lintel sunshade and slab on counter washbasin complete in all respect in 1:2:4 in all complete work |
| 12 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) |
| 13 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 14 | P/F in position collapsible steel shutter complete in all complete work |
| 15 | S/F of M.S work in grill of ventilation and window complete in all complete work |
| 16 | 20mm thick C.P in 1:2 with cement and c/sand mortor with punning under plinth and above slab complete |
| 17 | 12mm thick C.P in 1:4 in inner face wall with fine sand of wall above tile in all complete work |
| 18 | 12mm thick C.P in 1:3 with C/sand in ceiling in all complete work |
| 19 | 12mm thick C.P in 1:4 in outer face wall with fine sand in complex and parapet wall in all complete work |
| 20 | P/F of kota stone flooring (25mm thick) in all complete work |
| 21 | S/F 6 to 8mm thick vitrified tiles 600x600 in flooring in all compllete work |
| 22 | S/F 6mm thick china glazed tiles in skirting/dado in all complete work |
| 23 | S/F of 6mm thick china glazed tiles dado in outer face of wall up to 2.10m in all complete work |
| 24 | Providing and laying cement concrete 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size all round S.W pipes including bed concrete in all complete work |
| 25 | Construction of brick drain in all complete work |
| 26 | Construction of inspection chamber in all complete work |
| 27 | Construction of collecting chamber |
| 28 | Providing and applying white cement based putty of average thickness 4mm of approved brand and manufacturer over the plastered wall surface to prepared the surface even and smuth in all complete work |
| 29 | Provission of oil board distemper on innerwall and ceiling in all complete work |
| 30 | Finishing wall with weather coat in all complete work |
| 31 | P/F water closet squatting pan (indian type W.C pan) with 100 mm sand cast iron P or S trap 10 litre low level white P.V.C flushing cistern including flush pipe with manually controlled device handle lever conforming in all complete work Indian (orissa) |
| 32 | P/F water closet squatting pan (indian type W.C pan) with 100 mm sand cast iron P or S trap 10 litre low level white P.V.C flushing cistern including flush pipe with manually controlled device handle lever conforming in all complete work European (Pedestal type) |
| 33 | P/F white vitreous china flat back half stall urinal of size 580x380x350mm with white PVC automatic flushing cistern, with fittings, standard size C.P brass flush pipe spreaders with unions and clamp in all complete work |
| 34 | P/F wash basin with C.I brackets. 15mm C.P brass pillar taps, 32mm C.P brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require white vitreous china wash basin size 630x450mm with a pair of 15mmC.P brass pillar taps in all complete work |
| 35 | P/F of urinal devider in all complete work |
| 36 | P/F 600x450mm beleved edge mirror of superior glass of approved quality complete with 6mm thick hard board ground fixed to wooden cleats with C.P brass screws and washers complete |
| 37 | P/F of fan box with complete set |
| 38 | P/F of ceiling fan in all complete work |
| 39 | P/F of exhaust fan in all complete work |
| 40 | S/F of hanger/peg in bathroom and C.T room in all complete work |
| 41 | P/F of aluminium door and window in all complete work |
| 42 | Provison for soap disc in all complete work |
| 43 | Providing and fixing of rain water pipe 100mm dia in all complete work |
| 44 | P/F stainless steel (grade 304) railing made of hollow tubes, channels, plates etc. including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete i/c fixing the railing with necessary accessories & stainless steel dash fasteners in all complete work |
| 45 | Painting on iron work in all complete work |
| 46 | Provison of sanitary pad vending machine in all complete work |
| 47 | Provision of hand drier in all complete work |
| 48 | Site cleaning after completion of work |
| 49 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 50 | P.C.C 1:5:10 with in cement and fine sand and 40 mm gauge brick ballast in all work complete. |
| 51 | 25mm thick C.C flooring in all complete work |
| 52 | Brick work 1:3 cement and coarse sand motor in all complete work |
| 53 | 12mm thick cement plaster in 1:3 cement and coarse sand mortor in all complete work |
| 54 | Cast iron cover 600mmx600mm in all complete work |
| 55 | R.C.C 1:2:4 in slab in all complete work |
| 56 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 57 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 58 | P.C.C 1:5:10 with in cement and fine sand and 40 mm gauge brick ballast in all work complete. |
| 59 | 25mm thick C.C flooring in all complete work |
| 60 | Brick work 1:3 cement and coarse sand motor in all complete work |
| 61 | 12mm thick cement plaster in 1:3 cement and coarse sand mortor in all complete work |
| 62 | R.C.C 1:2:4 in slab in all complete work |
| 63 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 64 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 65 | P.C.C 1:5:10 with in cement and fine sand and 40 mm gauge brick ballast in all work complete. |
| 66 | 25mm thick C.C flooring in all complete work |
| 67 | Brick work 1:3 cement and coarse sand motor in all complete work |
| 68 | 12mm thick cement plaster in 1:3 cement and coarse sand mortor in all complete work |
| 69 | R.C.C 1:2:4 in slab in all complete work |
| 70 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 71 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 72 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 73 | P.C.C 1:4:8 with in cement and fine sand and 40 mm gauge brick ballast in all work complete. |
| 74 | First classB/W 1:3 in cement and coarse sand motor in all complete work |
| 75 | R.C.C in beam 1:2:4 light excluding cost of reinforcement in all complete work |
| 76 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) |
| 77 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 78 | 20mm thick cement plaster in 1:3 with coarse sand in all complete work |
| 79 | 25mm thick C.C 1:2:4 in all complete work |
| 80 | Providing M.S foot rests including fixing in manholes with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) in all complete work |
| 81 | P/F sand cast iron S&S off sets as per 150mm off sets mm dia H.C.I pipe with 100 mm dia pipe in all complete work |
| 82 | P/F mirror of superior glass of approved quality and of required shape and size with plastic moulded shape frame of approved make and shade with 6mm thick hard borad backing circular shape 450mm dia in all complete work |
| 83 | P/F terminal quard 100mm sand cast iron S&S as per in all complete work |
| 84 | P/F plain bend of required degree sand cast iron S&S in all complete work |
| 85 | C.C 1:2:4 cement core. sand and 20 mm stone grit in all complete (S.I. No. 279 (a)) |
| 86 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) |
| 87 | Filling available excavated earth Excluding rock in trenches, plinth, sides of foundation etc in all complete work |
| 88 | B/W in 1:6 in foundation and plinth in all complete work |
| 89 | Providing and fixing of rings for lifting of slab in all complete work |
| 90 | B/W in 1:4 in honey comb in all complete work |
| 91 | Honey comb brick work 10/11.4cm thick with common burnt clay bricks of class designation 7.5 in super structure above plinth level upto floor V level in all complete work |
| 92 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) |
| 93 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete work |
| 94 | 20mm thick cement plaster in 1:3 with coarse sand in all complete work |
| 95 | 20mm thick cement plaster in 1:3 with coarse sand in all complete work |
| 96 | 12mm cement plaster of mix 1:6 1cement:6 fine sand in all complete work |
| 97 | P.V.C pipe 110 mm in all complete work |
| 98 | P.V.C strainer 90mm in all complete work |
| 99 | P.V.C jali (cloth fine quality) in all complete work |
| 100 | P.V.C solvent cement 250ml packing in all complete work |
| 101 | P.V.C suthli 250gm in all complete work |
| 102 | P.V.C socket 110mm (6kg) in all complete work |
| 103 | P.V.C socket 90mm (6kg) in all complete work |
| 104 | Bore cap 100 mm in all complete work |
| 105 | Supply of 1.5 H.P submersible pump including cable in all complete work |
| 106 | G.I screw 32mm size 150mmin all complete work |
| 107 | rubber packing sheet in all complete work |
| 108 | G.I niple 32mm size 150mmin all complete work |
| 109 | G.I socket 32mm dia in all complete work |
| 110 | Trafflon tape in all complete work |
| 111 | Auto cut starter and control pannel of pump in all complete work |
| 112 | Reducing socket 110mmx90mm in all complete work |
| 113 | G.I pipe 32mm dia in all complete work |
| 114 | End cap 90mm dia in all complete work |
| 115 | M.S clamp for 32mm dia G.I pipe in all complete work |
| 116 | Boring charges |
| 117 | Installation charges of submersible pump in all complete work |
| 118 | Cement concrete foundation of pumping plant in all complete work |
| 119 | Well development for minimum [email protected]/hr in all complete work |
| 120 | Shrouding of tube well with coarse sand in all complete work |
| 121 | Provision of water supply fittings and water connection work @5% of SI No. 01 |
| 122 | Provision of water supply fittings and water connection work @4% of SI No. 01 |
| 123 | Provision of glow sign board and notice board |
| 124 | Provision of 1000 Ltr P.V.C water storage tank/tank Rs. 6.25/Ltr |
| 125 | Add 12.5% supervision charge |
| 126 | Add 18%GST |
AI Tender Summary
Tender Timeline
Apr 01, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedApr 20, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 21, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender