Tender For Chainlink Fencing Work For 600 Mw Jhansi Solar Power Park
Tender Overview
Project Description
Chainlink Fencing Work For 600 Mw Jhansi Solar Power Park Appointment Of Agency For Construction Of Customized Boundary Wall With Chain Link Fencing Work Of A Length 25 Km For Development Of 600 Mw Ultra Mega Renewable Energy Power Park At Garautha, Dist. Jhansi, Uttar Pradesh
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Apr-2023 | Updated Bid documents for fencing work of 600 MW Jhansi Solar Power Park | Other | 20-Apr-2023 |
| 2 | 06-Apr-2023 | Clarification for BOQ and Bid evaluation | Financial Bid | 20-Apr-2023 |
| 3 | 10-Apr-2023 | Pre-Bid meeting for Fencing work Jhansi | Other | 20-Apr-2023 |
| 4 | 13-Apr-2023 | Changes in BoQ items | Financial Bid | 20-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbed land up to 50 m and lift up to 1.5 m |
| 3 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.2.6.1 All kinds of soil |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.2.7.1 Ordinary rock |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 7 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 4.1.31:2:4 (1 cement: 2 course sand (zone- III)4 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuttering including strutting. propping etc, and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Providing and fixing G.I. chain link tabric fencing of required width in mesh size 100X100 mm including strengthening with 4 mm dia wire or nuts, bolts and washers (Double Twisted) as required complete as per the direction of Engineer-in-charge (Made of GI wire of dia 4mm) |
| 10 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron \"Y\" shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.)/Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) |
| 11 | Painting with aluminium paint of approved brand and manufacture to give an even shade .Two or more coats on new work |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender