| 1 | Overhauling |
| 2 | OD97051/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 3 | OD97674/2022-2023:Dismantling the 35 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 4 | OD97675/2022-2023:Dismantling the 50 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 5 | Lowering / Refitting |
| 6 | OD97065/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 7 | OD97676/2022-2023:Lowering down and erecting50 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 8 | OD97677/2022-2023:Lowering down and erecting 35 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 9 | Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement) |
| 10 | OD97069/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required |
| 11 | OD260299/2022-2023:Supply and renewal of Three Phase Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make. |
| 12 | OD260300/2022-2023:Supply and renewal of Three Phase Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make. |
| 13 | OD97070/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one |
| 14 | OD251969/2022-2023:Providing and fixing following capacity switch disconnector unit with sheet enclosure made up of 1.6mm CRCA sheet, powder coated, making connections, etc. as required.125 amps 3 pole (L&T Make FN125A TPN) |
| 15 | OD97071/2022-2023:Supply and Installing 20 W LED Tube light. |
| 16 | Periodical Maintenance |
| 17 | OD97053/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed |
| 18 | OD97680/2022-2023: Fully Comprehensive Annual Maintenance of 35 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 19 | OD136844/2022-2023:Fully Comprehensive Annual Maintenance of 35 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 20 | OD112811/2022-2023:Fully Comprehensive Annual Maintenance of 50 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 21 | Lifting |
| 22 | OD97054/2022-2023: Lifting the5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 23 | OD97681/2022-2023:Lifting the 35HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 24 | OD97682/2022-2023:Lifting the 50HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 25 | Overhauling |
| 26 | OD97063/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 27 | OD97683/2022-2023:Dismantling the 75 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 28 | OD97685/2022-2023:Dismantling the 125 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. |
| 29 | Lowering / Refitting |
| 30 | OD97064/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 31 | OD97686/2022-2023:Lowering down and erecting100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 32 | OD97687/2022-2023:Lowering down and erecting75 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 33 | OD97688/2022-2023:Lowering down and erecting 125 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 34 | Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement) |
| 35 | OD97057/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required |
| 36 | OD97058/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one |
| 37 | OD97059/2022-2023:Supply and Installing 20 W LED Tube light. |
| 38 | OD251880/2022-2023:Supply conveyance installation testing and Commissioning thecooling fan made of aluminium suitable for 100 HP , 415 V existing motor or of original make (Marathon) |
| 39 | OD252057/2022-2023:Supply and providing Iron bolts and nuts of suitable size used for 100 HP squirrel cage induction motor |
| 40 | OD120184/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6316-2z or its equivalent size |
| 41 | Periodical Maintenance |
| 42 | OD97052/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed |
| 43 | OD97689/2022-2023:Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 44 | OD97690/2022-2023:Fully Comprehensive Annual Maintenance of 75 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 45 | OD97691/2022-2023: Fully Comprehensive Annual Maintenance of 125 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 46 | Lifting |
| 47 | OD97055/2022-2023: Lifting the5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 48 | OD97692/2022-2023:Lifting the 125HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 49 | OD97693/2022-2023:Lifting the 100HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |
| 50 | OD97694/2022-2023:Lifting the 75HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. |