Tender For Various Works Under Full Deposit Scheme In Edsd-I Ganjdundwara In The Jurisdiction Of Edd (Rural), Kasganj, kasganj-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Various Works Under Full Deposit Scheme In Edsd-I Ganjdundwara In The Jurisdiction Of Edd (Rural), Kasganj. Submission Date for this Tender is 07-04-2023. Bolts Tenders in kasganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37046316
Tender For Various Works Under Full Deposit Scheme In Edsd-I Ganjdundwara In The Jurisdiction Of Edd (Rural), Kasganj
Open Tender
Indian
Uttar Pradesh
kasganj
07-04-2023

Tender Details

Various Works Under Full Deposit Scheme In Edsd-I Ganjdundwara In The Jurisdiction Of Edd ( Rural ) , Kasganj-Safe Carriage Of Following Pcc / St Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Roadincluding The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . , Pcc Pole 8.5 Mtr , St Pole 9 / 11 Mtr , Cartage Of Line Material Viz Weasal Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . , Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5 Mtr , Stp 9 / 11 Mtr. , Erection Of Double Pole On Pcc Pole Including The Work Of Complete Line As Per Respo Norm Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Poles 8.5 Mtr. , Erection Of Stay Set Complete Including The Work Of Nuzzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&Pfixing Of Stay Insulator Etc. Required For Proper Completion Of Work. , Drilling And Cutting Of Tee Off Channel, V Cross Arms.As Per Specification Of Uppcl Construction Manual Including Including Loading And Unloading At The Both Ends. , Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The T&P, Cost Of Labour. , Safe Carriage Of Xlpe Cable Of Size 3X ( 35 / 70 / 120 / 185 ) Sq. M.M. From Store To Respective Site Of Work Including Loading Unloading At Both Ends. , Laying Of 3X ( 35 / 70 / 120 / 185 ) Sq.Mm. 11 Kv Under Ground Cable After Digging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. , Filling Of 3X70 / 120 Sq. M.M. 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Outdoor / Indoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. , Laying Sagging Stringing, Binding And Jumpering Etc. Of Following Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor / Rabbit / Dog Conductor , Lt Abc 3X50+1X35+1X16 Bunch Conductor , Lt Abc 1X16 Bunch Conductor , Carriage And Installation From Store To Site Of Following Capacity Transformer Including The Work Of Its Loading & Unloading, Dragging Etc. And Also Including The Cost Of Labour And T&P Etc. Required For Proper Completion Of Work. , 10 / 16 / 25 / 63 / 100 Kva T / F , Safe Carriage Of 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Soron ( Kasganj ) To Site Of Work Including Loading And Unloading At Both Ends. Average Distance Approx. 0 Km To 50 Km. , Erection & Grouting Of 11 Kv Pilfer-Proof Metering Cubicle Making Connections With Bus Bar, Tapping With Empire Tape With Existing Earthing. The Above Work Includes The Cost Of Labour, T&P, Carrier & Material Etc. Required For Proper Completion Of Work Except Cost Of 11 Kv Vcbs. , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Carrier Etc. Required For Proper Completion Of Work. , Cutting And Chipping Of Tree Branches Which Comes On Ht / Lt Lines. , Making The Plinth Of St Poles As Per Respo Norms. , Re-Sagging Of Loose Ht / Lt Line Conductor As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour T&P Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor / Rabbit / Dog Conductor , Re-Tightning Of Stay Complete With Nuzelling & Binding Including Cost Of Labour T&P Etc Required For Proper Completion Of Work. , Straightening Of Tilted Pole At Various Places As Per Direction Of Je. , Pcc Poles 8.5 Mtr. / Stp Pole 9 / 11 Mtr. , Grouting , Pcc Poles 8.5 Mtr. Long As Per Respo Norms , St Poles 11 Mtr. Long As Per Respo Norms , Installation Of Extra “T”On The Old Erected Poles Wherever Required. , Safe Carriage Of 11 Kv Ct / Pt Pole Mounting Unit Of Any Other Place Or From Site Of Work To The Work Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Installation Of 11 Kv Ct-Pt Combined Metering Unit On Double Pole After Fixing Of Channel With M.S. Clamps And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1 / 8X1 Finally Connected To Earthing Rod Of Size 20Mm X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae ( M ) . The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. , Painting Of St Pole As Per Respo Norms. , Safe Carriage Of Lt Distribution Box ( Three Phase ) From Store Centre Soron ( Kasganj ) To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. , Providing & Fixing Of Nut Bolt Off Size On Vendors Cost , Providing & Fixing Of F Clamp & Holding Clamp For St / Pcc Pole On Vendors Cost.

Key Value

Document Fees
INR 1180 /-
EMD
INR 2000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Various works under full deposit scheme in EDSD-I Ganjdundwara in the jurisdiction of EDD (Rural), Kasganj.
Sl. No. Item Description
1Safe carriage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
2PCC pole 8.5 Mtr
3ST pole 9/11 Mtr
4Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
5Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
6PCC pole 8.5 Mtr
7STP 9/11 Mtr.
8Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
9PCC poles 8.5 Mtr.
10Erection of stay set complete including the work of nuzzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&Pfixing of stay insulator etc. required for proper completion of work.
11Drilling and cutting of tee off channel, V cross arms.as per specification of UPPCL construction manual including including loading and unloading at the both ends.
12Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the T&P, cost of labour.
13Safe carriage of XLPE cable of size 3x(35/70/120/185) Sq. m.m. from store to respective site of work including loading unloading at both ends.
14Laying of 3x(35/70/120/185)Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
15Filling of 3x70/120 Sq. m.m. 11 KV XLPE heat shrinkable cable jointing Kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.
16Laying sagging stringing, binding and jumpering etc. of following conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
17ACSR weasel conductor/ Rabbit / Dog Conductor
18LT ABC 3x50+1x35+1x16 bunch conductor
19LT ABC 1x16 bunch conductor
20Carriage and installation from Store to site of following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
2110/16/25/63/100 KVA T/F
22Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Soron (Kasganj) to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km.
23Erection & grouting of 11 KV pilfer-proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs.
24Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P carrier etc. required for proper completion of work.
25Cutting and Chipping of Tree Branches which comes on HT/LT lines.
26Making the plinth of ST poles as per RESPO norms.
27Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work.
28ACSR weasel conductor/ Rabbit / Dog Conductor
29Re-tightning of stay complete with nuzelling & binding including cost of labour T&P etc required for proper completion of work.
30Straightening of tilted pole at various places as per direction of JE.
31PCC poles 8.5 Mtr./STP pole 9/11 Mtr.
32Grouting
33PCC poles 8.5 Mtr. Long as per RESPO norms
34ST poles 11 Mtr. Long as per RESPO norms
35Installation of extra “T”on the old erected poles wherever required.
36Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.
37Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
38Painting of ST pole as per RESPO norms.
39Safe carriage of LT distribution box (three phase) from store centre Soron (Kasganj) to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
40Providing & Fixing of nut bolt off size on vendor"s cost
41Providing & Fixing of F Clamp & holding clamp for ST/PCC pole on vendor"s cost.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail