| 1 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. A) Column superstructure |
| 2 | B) Plinth Band |
| 3 | C) Roof Beam |
| 4 | D) Roof Slab |
| 5 | Straightening, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect. |
| 6 | Brick work with Flyash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. (First floor) |
| 7 | Second Floor (Head room) |
| 8 | 12mm thick C.P.(1:6) on brick masonary to the smooth surface including watering, curing, cost, carriage, royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 9 | 16mm thick C.P. (1:6) over brick masonary for the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 10 | 6mm thick C.P. (1:4) over concrete surface to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 11 | Cement washing one coat including cost of all materials,labour,T&P and watering ,curing etc complete. |
| 12 | Supplying of M.S. Door, Window with grills, Grills made out of M.S. Angle frame, M.S. Flat, Sheetetc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour charges, carriage of materials to site etc. complete. MS Door |
| 13 | MS Grill |
| 14 | 25 mm thick C.C. (1:2:2) with 6mm size C.B. chips for grading concrete over roof slab including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 15 | Supplying, fitting and fixing Vitrified tile in floors of approved make conformaing to IS:13755 laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, etc. required for the work all complete as per direction ofE.I.C. |
| 16 | Fixing Ceramic tiles in dados skirting and risers of steps on 12mm thick CP (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete. |
| 17 | Finishing wall surface with Cement based wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour etc. complete. |
| 18 | Priming 1 coat with wallprimer water bond cement primer including all labour, materials etc. complete. |
| 19 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete. |
| 20 | Wall painting two coat with any approved weather coat paintincluding cost of all materials, labour and T&P require for the work etc. complete as directed by the E.I.C. |
| 21 | Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances of all materials and cost of all labour etc, complete as per specification & direction of E.I.C. |
| 22 | Supplying,fitting,fixing up window (sliding type) made up aluminium section 151-154,151-155, as windows frame section no.151-155,151-153 and 151-167 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes,labour,T&P etc complete as per direction of Engineer in charge. |
| 23 | Providing,fitting,fixing of AI door with OEL anodized AI.Door section of 9202 as vertical member ,9201 as top member & 9200 as bottom and middle member & 12mm thick prelaminated board fixed on door frame by means of tappered clip no.4660 and the frame to be compketed by means of jointing angle no.1855 including all cost of labour,hire charges of drilling machine,labour charges etc complete. |
| 24 | Supplying,fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x32mm x2mm @ 0.90 mtr C/C and stainless aquare pipe bracing of size case as per approved design and specification,buffing,polishing etc. with the cost,conveyance taxes of all materials,cost of all labour etc complete in all respect. |