| 1 | Supply, installation, testing and commissioning ofMNRE approved off GridSolar Panels for running of motor pumps with 25 years of Linear Generation warranty, Work includes designing of solar panel area and MS frame and foundation on ground/roof of Pump house or CWR, showing arrangement of panel in available space, installation ofPV module on MS frame as per approved design and drawings. Mountingstructure shall be suitably designto withstand wind velocity up to 150km/hr. The work shall be executed as perdetailedtechnical specifications, approved drawing and direction of Engineer in Charge. Note: There shall be 5 year service warranty for solar panel and mounting structureandsuitable provision shall be included in tender document. |
| 2 | Providing, installation, testing and commissioning of AC submerssible pump sets with inbuilt or individual solar pump controllerwith Maximum power point tracking (MPPT) for optimally use the solar panel and maximize water discharge to deliver maximum water during the day including PVC flat submersible cable from controller to motor pumps.Solar pumpshall be of Stainless steel construction and performance shall be as per scope of work and minimum lift of water shall be as per defined in scope . Pump controller shall have Adequate protection against dry operation of motor pump set, and against hails and storms. Full protection against open circuit, accidental short circuit and reverse polarity should be provided. A good reliable on/off switchbe provided. The cable shall be ISI marked three core PVC flat submersible cableas per IS 694:1990 or amended up to date ( standard insulation) and conductor as per class 5 of IS 8130:1980 or amended up to date. The duty condition of pump set shall be as per scope of work and entire work shall be executed as per technical specification and direction of Engineer in charge. |
| 3 | 2.2 KW (3.0 HP) |
| 4 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting (height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. |
| 5 | Add Extra if I/rail section is used |
| 6 | Providing and Fixing of ISI marked PVC storage tank of following capacityas per IS: 12701-1989 (of approved make) with cover, 25 mm dia. 1 mtr long GI overflow pipe, 25 cm long 25 mm dia washout GI pipe with plug & socket, including P&F 32 mm dia Ball Cock (Float valve) IS 1703 marked with rod and PVC ball complete with brass weight 1000 gm, including P&F 15mm dia CI quarter turn heavy duty Bib Cocks four nos of superior quality and approved make, including interconnections complete job. |
| 7 | 2000 litres capacity |
| 8 | Supply & Fixing of ISI marked three core PVC flat submersible cableas per IS 694:1990 or amended up to date and conductor as per class 5 of IS 8130:1980including making connection etc. |
| 9 | 3 core 4.0 Sq.mm |
| 10 | Supply & Fixing M S clamp set of 50x6 mm flat from iron with nuts and bolts etc for holding the riser pipe assembly of submersible pump set. |
| 11 | Providing & Lowering in tube well ISI marked HDPE pipe as per IS 4984:1995 or amended upto date in PE 80 grade and class PN 10 of following dia. including HDPE/GI fittings and PVC rope confirming to IS 5175:1992 or amended upto date, along with clamping of submersible cable etc. complete in all respect. |
| 12 | 40 mm dia |
| 13 | Providing & Fixing pump safety cage as per specifications or as directed by Engineer in charge. |
| 14 | Supply, installation, testing and commissioning of Remote monitoring unit on off grid solar controller for remote ON/OFF, parameter setting, monitoring and troubleshooting through mobile etc. complete. Web charges and data charges for 5 year during service warranty etc. complete in all respect as per technical specification and as per direction of Engineer. |
| 15 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil |
| 16 | Providing and laying in position cement concrete M10 grade nominal mix 1:3:6 (1 Cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size) in base course complete including all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be madeas per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified,complete work as per technical specification and scope of work. |
| 17 | Providing and laying in position cement concrete in specified grade over prepared base course complete including finishing, curing, all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be madeas per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified,complete work as per technical specification and scope of work. |
| 18 | M20 grade Nominal Mix1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 19 | Providing & Lowering in tube well ISI marked GI Pipe medium duty (“B\" class), Steel tube as per IS:1239 or amended up to date and zinc coating as per IS 4736, threaded and double flanged (welded) on both ends and two number25x3mm MS flat welded on both ends between pipe & flange, rubber washer & nut bolts etc. complete in all respect. |
| 20 | 32 mm dia |
| 21 | P& F Bib cock (IS : 8931 mark), superior quality of approved make , brss 400 gm, 15 mm nominal bore. |
| 22 | Providing, lowering, laying and jointing in trenches, standard lengths HDPEISI marked Pipes as per IS-4984: 1995 (amended upto date)with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe byelectro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) .Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.Supply may be in coil or straight length in 6 M/12 M. |
| 23 | HDPE PE-80PN-6 |
| 24 | 75 mm dia |