| 1 | Vellore District Construction of SteelFabrigation Eraction Steel Bridge Across Naganathi River BG atThuthikadu Panchayat at Kaniyambadi Block SFC 2022-23 Package No 05 |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete. |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour chargesetc. |
| 4 | Plain Cement concrete 1:3:6 using 20mm hbg jelly for dummy column |
| 5 | Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length, |
| 6 | Supplying and erecting centring for sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete |
| 7 | Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour chargesetc. |
| 8 | Supply and Fixing 5 inch Chanal including Fixing Charges ect |
| 9 | Supply and Fixing 3.00x1.50 inch C Chanel including Fixing Charges ect |
| 10 | Supply and FixingDimond Checked Sheet including Fixing Charges ect |
| 11 | Supply and FixingLAngale 1.50x 1.50 including Fixing Charges ect |
| 12 | Supply and Fixing BaseMS Plate 1.00x1.00 including Fixing Charges ect |
| 13 | Supply and Fixing Hand Rail 1.50x1.50 including Fixing Charges ect |
| 14 | Supply and Fixing Hand Rail 1.00x1.00 including Fixing Charges ect |
| 15 | Supply and Fixing Bolt Nut And Washer including Fixing Charges ect |
| 16 | Supply and Fixing 14 inch Cutting Wheel including Fixing Charges ect |
| 17 | Supply and Fixing 4 inch Cutting Wheel including Fixing Charges ect |
| 18 | SupplyWelding Rod including Cost ect |
| 19 | SupplyGrinding Wheel including Cost ect |
| 20 | Meterial fixing Labour Charges including Cost ect |
| 21 | Supplying Meterial and Steel BridgeConveyance Chargesect |
| 22 | Painng Two Coats For New Iron Work |
| 23 | Letering and Painting Name board |
| 24 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |