Public Administrative Department Trust & NGO Closing in 0 days TDR #37015039

Tender For Annual Maintenance Contract(Amc) For Ductable And Split Air Conditioning Systems For 2023-24

Issued by Trust & NGO · guntur, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
31 Mar 2023
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
guntur → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Contract(Amc) For Ductable And Split Air Conditioning Systems For 2023-24 , Supply Installation Testing And Commissioning Of Brand New Rotary Type Sealed Compressor For 10 15 Ton Air Conditioner In Place Of Defect Compressor,Supplyinstallationtesting And Commissioning Of Brand New Rotary Type Sealed Compressor For 20 Ton Air Conditioner In Place Of Defect Compressor,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 10 15 Ton Air Conditioner In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 20 Ton Air Conditioner In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Overload Protection Relay For 10 15 20 Air Conditioner,Supplyinstallationtesting And Commissioning Of Starting Relay For 10 15 20 Air Conditioner Refrigerator,Supply And Fixing Of 20 60 Micro Farad Starting Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 80 150 Micro Farad Starting Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 25 315 40 60 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing 80 100 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing 15 To 36 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 1Set Ms Bracket Suitable For Fixing Out Door Unit Of Split Window Ac Unit,Supply And Fixing Of Multi Speed Fan Motor Suitable For 10 15 20 Ton Split Window Acunit,Supply And Fixing Of Air Filter Suitable For 10 15 20 Ton Window Acunit Pvc Nylon,Supply And Fixing Of Air Filter Suitable For 10 15 20 Ton Split Acunit Pvc Nylon,Supply And Fixing Of Fan Blade For 10 15 20 Ton Acmachine,Installation Of 10 15 20 Ton Split Window Air Conditioners,Installation Of Tower Type Split Air Conditioners,Removing Of Existing Split Window Tower Air Conditioners Without Damaging To Copper Pipe,Repairs And Installation Of Existing Pcb Power Circuit Board In 10 15 20 Ton Split Window Acunit,Supply And Fixing Of New Power Circuit Board In 10 15 20 Ton Split Window Acunit In Place Of Defect Ones,Overhauling And Servicing The Split Type 15 20 Ton Ac Machine By Cleaning The Condensor Cooling Coil Etc By Blower And Oiling The Fan Motor And Cleaning All Parts And Putting The Machine In Working Condition,Supply Testing Installation And Commissioning Of New Compressor Flush Out The System With Nitrogen Brazing Work Replacement Of New Liquid Line Drier Pressure Testing With Nitrogen Indoor Unit Control Wiring Of Ac S Unit S Panel Contactor Vacuuming And R 22 Gas Charging And Commissioning For 55 Tr Unit,Supply And Fixing Of 05Hp Condenser Fan Motor,Chemical Servicing Charges For 55 Tr Unit,Pressure Testing With Nitrogen Leaks Finding Brazing Work Vacuuming And R 22 Gas Charging And Recommissioning Of Existing Compressor,Replacement Of Phase Failure Relays And Control Wiring,Supply Of R 22 Refrigerant,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 55 Tr Unit Air Conditioner In Place Of Defect One,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 165 Litre Refrigerator Including Capillary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 200 210 Litre Refrigerator Including Capillary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 286 310 Litre Refrigerator Including Capillary And Strainer Filter,Replacement Of Defective Compressor By Company Repaired Compressor Of 165 Litre Refrigerator Including Testing Etc As Required,Replacement Of Defective Compressor By Company Repaired Compressor Of 200 210 Litre Refrigerator Including Testing Etc As Required,Replacement Of Defective Compressor By Company Repaired Compressor Of 286 310 Litre Refrigerator Including Testing Etc As Required,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 165 Litre Refrigerator In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 200 210 Litre Refrigerator In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 286 310 Litre Refrigerator In Place Of Defect One,Replacement Of Thermostat Of Ac Refrigerator As Required,Supply And Running Of 2 Runs Of 1 2X1 4 Inches Copper Tubes For Suction And Liquid Between Indoor And Outdoor Unit For Air Conditioner Including Foaming Etccomplete,Supply And Charging Of Fresh Refrigerant And Testing Ofperformance Of 10 15 Ton Air Conditioner Window Split Including Capallary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Ofperformance Of 20 Ton Air Conditioner Window Split Including Capillary And Strainer Filter,Supply And Running Of 2 Runs Of 3 4X3 8 Inches Copper Tubes For Suction And Liquid Between Indoor And Outdoor Unit For Air Conditioner Including Foaming Etccomplete

BOQ

Sl. No. Item Name
1Supply Installation Testing and Commissioning of brand new Rotary type sealed compressor for 10 15 Ton Air conditioner in place of defect compressor
2SupplyInstallationTesting and Commissioning of brand new Rotary type sealed compressor for 20 Ton Air conditioner in place of defect compressor
3SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 10 15 Ton Air conditioner in place of defect one
4SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 20 Ton Air conditioner in place of defect one
5SupplyInstallationTesting and Commissioning of overload protection relay for 10 15 20 Air Conditioner
6SupplyInstallationTesting and Commissioning of starting relay for 10 15 20 Air Conditioner Refrigerator
7Supply and fixing of 20 60 micro farad starting capacitor of 230V 275V50Hz rating
8Supply and fixing of 80 150 micro farad starting capacitor of 230V 275V50Hz rating
9Supply and fixing of 25 315 40 60 micro farad running capacitor of 230V 275V50Hz rating
10Supply and fixing 80 100 micro farad running capacitor of 230V 275V50Hz rating
11Supply and fixing 15 to 36 micro farad running capacitor of 230V 275V50Hz rating
12Supply and fixing of 1set MS bracket suitable for fixing out door unit of split Window AC unit
13Supply and fixing of Multi speed Fan Motor suitable for 10 15 20 Ton Split Window ACUnit
14Supply and fixing of Air filter suitable for 10 15 20 Ton Window ACUnit PVC NYLON
15Supply and fixing of Air filter suitable for 10 15 20 Ton Split ACUnit PVC NYLON
16Supply and fixing of Fan blade for 10 15 20 Ton ACMachine
17Installation of 10 15 20 ton Split Window Air Conditioners
18Installation of Tower type Split Air Conditioners
19Removing of existing Split Window Tower Air Conditioners without damaging to copper pipe
20Repairs and Installation of existing PCB power circuit board in 10 15 20 Ton Split window ACUnit
21Supply and fixing of new power circuit board in 10 15 20 Ton Split window ACUnit in place of defect ones
22Overhauling and servicing the Split type 15 20 Ton AC Machine by Cleaning the condensor cooling Coil etc by blower and oiling the Fan Motor and Cleaning all parts and putting the machine in working condition
23Supply testing installation and commissioning of new compressor flush out the system with Nitrogen Brazing work replacement of new liquid line drier pressure testing with nitrogen indoor unit control wiring of AC s unit s panel contactor vacuuming and R 22 Gas charging and Commissioning for 55 tr unit
24Supply and fixing of 05Hp condenser fan motor
25Chemical Servicing charges for 55 tr unit
26Pressure testing with nitrogen leaks finding brazing work vacuuming and R 22 gas charging and recommissioning of existing compressor
27Replacement of phase failure relays and control wiring
28Supply of R 22 Refrigerant
29SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 55 TR unit Air conditioner in place of defect one
30Supply and charging of fresh refrigerant and testing of performance of 165 litre refrigerator including capillary and strainer filter
31Supply and charging of fresh refrigerant and testing of performance of 200 210 litre refrigerator including capillary and strainer filter
32Supply and charging of fresh refrigerant and testing of performance of 286 310 litre refrigerator including capillary and strainer filter
33Replacement of defective compressor by company repaired compressor of 165 litre Refrigerator including testing etc as required
34Replacement of defective compressor by company repaired compressor of 200 210 litre Refrigerator including testing etc as required
35Replacement of defective compressor by company repaired compressor of 286 310 litre Refrigerator including testing etc as required
36SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 165 litre Refrigerator in place of defect one
37SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 200 210 litre Refrigerator in place of defect one
38SupplyInstallationTesting and Commissioning of condensing cooling coil of copper fins for 286 310 litre Refrigerator in place of defect one
39Replacement of thermostat of AC Refrigerator as required
40Supply and running of 2 runs of 1 2x1 4 inches Copper tubes for suction and liquid between indoor and outdoor unit for Air Conditioner including foaming etccomplete
41Supply and charging of fresh refrigerant and testing ofperformance of 10 15 Ton air conditioner window split including capallary and strainer filter
42Supply and charging of fresh refrigerant and testing ofperformance of 20 Ton air conditioner window split including capillary and strainer filter
43Supply and running of 2 runs of 3 4x3 8 inches Copper tubes for suction and liquid between indoor and outdoor unit for Air Conditioner including foaming etccomplete

AI Tender Summary

OUR REF NO 37015039
AUTHORITY Trust & NGO
TENDER VALUE Ref. Documents
LAST DATE 31-03-2023
Authority
Authority Name Endowment Department
Work Description Annual Maintenance Contract(Amc) For Ductable And Split Air Conditioning Systems For 2023-24 , Supply Installation Testing And Commissioning Of Brand New Rotary Type Sealed Compressor For 10 15 Ton Air Conditioner In Place Of Defect Compressor,Supplyinstallationtesting And Commissioning Of Brand New Rotary Type Sealed Compressor For 20 Ton Air Conditioner In Place Of Defect Compressor,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 10 15 Ton Air Conditioner In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 20 Ton Air Conditioner In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Overload Protection Relay For 10 15 20 Air Conditioner,Supplyinstallationtesting And Commissioning Of Starting Relay For 10 15 20 Air Conditioner Refrigerator,Supply And Fixing Of 20 60 Micro Farad Starting Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 80 150 Micro Farad Starting Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 25 315 40 60 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing 80 100 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing 15 To 36 Micro Farad Running Capacitor Of 230V 275V50hz Rating,Supply And Fixing Of 1Set Ms Bracket Suitable For Fixing Out Door Unit Of Split Window Ac Unit,Supply And Fixing Of Multi Speed Fan Motor Suitable For 10 15 20 Ton Split Window Acunit,Supply And Fixing Of Air Filter Suitable For 10 15 20 Ton Window Acunit Pvc Nylon,Supply And Fixing Of Air Filter Suitable For 10 15 20 Ton Split Acunit Pvc Nylon,Supply And Fixing Of Fan Blade For 10 15 20 Ton Acmachine,Installation Of 10 15 20 Ton Split Window Air Conditioners,Installation Of Tower Type Split Air Conditioners,Removing Of Existing Split Window Tower Air Conditioners Without Damaging To Copper Pipe,Repairs And Installation Of Existing Pcb Power Circuit Board In 10 15 20 Ton Split Window Acunit,Supply And Fixing Of New Power Circuit Board In 10 15 20 Ton Split Window Acunit In Place Of Defect Ones,Overhauling And Servicing The Split Type 15 20 Ton Ac Machine By Cleaning The Condensor Cooling Coil Etc By Blower And Oiling The Fan Motor And Cleaning All Parts And Putting The Machine In Working Condition,Supply Testing Installation And Commissioning Of New Compressor Flush Out The System With Nitrogen Brazing Work Replacement Of New Liquid Line Drier Pressure Testing With Nitrogen Indoor Unit Control Wiring Of Ac S Unit S Panel Contactor Vacuuming And R 22 Gas Charging And Commissioning For 55 Tr Unit,Supply And Fixing Of 05Hp Condenser Fan Motor,Chemical Servicing Charges For 55 Tr Unit,Pressure Testing With Nitrogen Leaks Finding Brazing Work Vacuuming And R 22 Gas Charging And Recommissioning Of Existing Compressor,Replacement Of Phase Failure Relays And Control Wiring,Supply Of R 22 Refrigerant,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 55 Tr Unit Air Conditioner In Place Of Defect One,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 165 Litre Refrigerator Including Capillary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 200 210 Litre Refrigerator Including Capillary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Of Performance Of 286 310 Litre Refrigerator Including Capillary And Strainer Filter,Replacement Of Defective Compressor By Company Repaired Compressor Of 165 Litre Refrigerator Including Testing Etc As Required,Replacement Of Defective Compressor By Company Repaired Compressor Of 200 210 Litre Refrigerator Including Testing Etc As Required,Replacement Of Defective Compressor By Company Repaired Compressor Of 286 310 Litre Refrigerator Including Testing Etc As Required,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 165 Litre Refrigerator In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 200 210 Litre Refrigerator In Place Of Defect One,Supplyinstallationtesting And Commissioning Of Condensing Cooling Coil Of Copper Fins For 286 310 Litre Refrigerator In Place Of Defect One,Replacement Of Thermostat Of Ac Refrigerator As Required,Supply And Running Of 2 Runs Of 1 2X1 4 Inches Copper Tubes For Suction And Liquid Between Indoor And Outdoor Unit For Air Conditioner Including Foaming Etccomplete,Supply And Charging Of Fresh Refrigerant And Testing Ofperformance Of 10 15 Ton Air Conditioner Window Split Including Capallary And Strainer Filter,Supply And Charging Of Fresh Refrigerant And Testing Ofperformance Of 20 Ton Air Conditioner Window Split Including Capillary And Strainer Filter,Supply And Running Of 2 Runs Of 3 4X3 8 Inches Copper Tubes For Suction And Liquid Between Indoor And Outdoor Unit For Air Conditioner Including Foaming Etccomplete
Basic Detail
Tender No 27/ENG/2022-23
Bidding Type Tender
Location
City guntur
State Andhra Pradesh
Key Dates
Publish Date 28 Mar 2023
Submission Date 31 Mar 2023
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5000
Exemption Not Available
Document List
fdcc36f0-c014-47aa-9715-e848d894cdf5.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 28, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
html

fdcc36f0-c014-47aa-9715-e848d894cdf5.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders