Various Electric Works On Turn-Key Basis For Electrification And Strengthening Of Infrastructure Due To Extension Of Nagar Nigam Area Eudd-3 Aligarh, aligarh-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Various Electric Works On Turn-Key Basis For Electrification And Strengthening Of Infrastructure Due To Extension Of Nagar Nigam Area Eudd-3 Aligarh. Submission Date for this Tender is 31-03-2023. Soldering and Welding Machinery Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37011883
Various Electric Works On Turn-Key Basis For Electrification And Strengthening Of Infrastructure Due To Extension Of Nagar Nigam Area Eudd-3 Aligarh
Open Tender
Indian
Uttar Pradesh
aligarh
31-03-2023

Tender Details

Various Electric Works On Turn-Key Basis For Electrification And Strengthening Of Infrastructure Due To Extension Of Nagar Nigam Area Eudd-3 Aligarh-2 Supply Of 33 Kv Control Penal 3 Supply Of 11 Kv Vcb Outgoing ( 400 / 200 / 5A. ) 4 Supply Of Battery Charger 24Volt 5 Supply Of Battery Set 6 Supply Of 11 Kv Ct For Vcb 600 / 300 / 5A Set 7 Supply Of 11 Kv Ct For Vcb 400 / 200 / 5A Set 8 Supply Of 33 Kv Post Insulator Set 9 Supply Of Control Cable 4X2.5 Sqmm. 10 Supply Of Control Cable 2X2.5 Sqmm. 11 Supply Of 11 Mtrs. Long St Pole Is 410 Sp-55 12 Supply Of 09 Mtrs. Long St Pole 13 Supply Of 8.5 Mtrs. Long Pcc Pole 14 Supply Of Stone Pad 15 Supply Of Abc Connector 16 Supply Of Suspension Clamp With Eye Hook 17 Supply Of Dead End Clamp With Eye 18 Supply Of Distritbution Box 19 Supply Of Earthing Complete For St Pole 20 Supply Of Stay Complete ( Gi Stay Rod 16X1800mm, 5 Kgs. Stay Wire 7 / 8, Stay Clamps, Bolts, Nuts & Washers ) 21 Supply Of 11 Kv Xlpe Cable Size 3*70 Sq.Mm. 22 Supply Of 11 Kv Xlpe Cable Size 3*185 Sq.Mm. 23 Supply Of 33 Kv Xlpe Cable Size 3*300 Sq.Mm. 24 Supply Of Acsr Dog Conductor 25 Supply Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X70 Sq.Mm. Cable Outdoor Type 26 Supply Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X185 Sq.Mm. Cable Outdoor Type 27 Supply Of Heat Shrinkable Jointing Kit For 33 Kv Xlpe 3X300 Sq.Mm. Cable Outdoor Type 28 Supply Of L.T. Aeirel Bunch Cable Size 3X95+1X35+1X16 Sq.Mm. 29 Supply Of L.T. Aeirel Bunch Cable Size 3X120+1X95+1X16 Sq.Mm. 30 Supply Of 100 Kva Distribuition Transoformer 31 Supply Of 250 Kva Distribuition Transoformer 32 Supply Of 11 Kv D.O. Fuse Set 33 Supply Of 11 Kv Tpmo 34 Supply Of Al. Lugs 400Sq.Mm. 35 Supply Of 11 Kv Pin Insulator With Pin 36 Supply Of 11 Kv Disc Insulator With Fitting 37 Supply Of M.S. Top Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 38 Supply Of M.S. Dropper Channel Size 100X50x2028 Mm. 39 Supply Of M.S. Base Angle Size 75X75x6mm., 2028 Mm. Long With Clamp For T / F Base 40 Supply Of M.S. T-Off Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 41 Supply Of F-Braket With Clamp 42 Supply Of Clamps For Pole 43 Supply Danger Board With Clamp 44 Supply Of L.T. Pvc Cable 3.5X150 Sq.Mm. 45 Supply Of L.T. Pvc Cable 3.5X400 Sq.Mm. 46 Supply Of L.T. Incoming Panel With Metering Equipment 47 Supply Of 33 Kv Lightening Arrestor 48 Erection 49 Erection Of Single Support By 11 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 50 Erection Of Single Support By 09 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 51 Erection Of Single Support By 8.5 Mtrs. Pcc Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 52 Erection Of Double Pole Structure By 11 Mtrs. St Pole Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. As Per Resspo Manual 53 Laying Of 33 Kv Xlpe Cable 3X300 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 54 Laying Of 11 Kv Xlpe Cable 3X185 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 55 Laying Of 11 Kv Xlpe Cable 3X70 Sq.Mm. Including Making Proper Connectionst Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 56 Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable Size 3X120+1X95+1X16 Sq.Mm. Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : 57 Laying Of Lt Pvc Cable 3.5X150 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 58 Laying Of Lt Pvc Cable 3.5X400 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 59 Laying Sagging Stringing And Jumpering Of Acsr Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 60 Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 61 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. 62 Filling Of Heat Shrinkable Jointing Kit For 33 Kv Xlpe 3X300 Sq.Mm. Cable Indoor / Outdoor Type As Per Resspo Norms. 63 Filling Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X185 Sq.Mm. Cable Indoor / Outdoor Type As Per Resspo Norms. 64 Filling Of Heat Shrinkable Jointing Kit For 11 Kv Xlpe 3X70 Sq.Mm. Cable Indoor / Outdoor Type As Per Resspo Norms. 65 Installation Of 33 Kv Control Penal 66 Installation Of 11 Kv Vcb Outgoing ( 400 / 200 / 5A. ) 67 Installation Of Battery Charger 24Volt 68 Installation Of Battery Set 69 Fixing Of 11 Kv Ct For Vcb 600 / 300 / 5A Set 70 Fixing Of 11 Kv Ct For Vcb 400 / 200 / 5A Set 71 Fixing Of 33 Kv Post Insulator Set 72 Laying Of Control Cable 4X2.5 Sqmm. 73 Laying Of Control Cable 2X2.5 Sqmm. 74 Painting Of Double Pole Structure Of St Pole In Two Coats Of Red Oxide And Two Coats Of Silver Paint With Bottom 6 Feet By Fluorescent Paint In Strips. 75 Painting Of Single Pole Structure Of St Pole In Two Coats Of Red Oxide And Two Coats Of Silver Paint With Bottom 6 Feet By Fluorescent Paint In Strips. 76 Erection Of Pin Insulator With Pin & Nuts, 11 Kv 77 Erection Of Disc Insulator With Fittings, 11 Kv 78 Erection Of Danger Board With Nuts & Bolts And Clamps 79 Erection Of M.S. Top Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 80 Erection Of M.S. Dropper Channel Size 100X50x2028 Mm. 81 Erection Of M.S. Base Angle Size 75X75x6mm., 2028 Mm. Long With Clamp For T / F Base 82 Erection Of M.S. T-Off Channel Size 125X65x6 Mm, 2240 Mm. Long With Clamp 83 Erection Of F-Braket With Clamp 84 Neutral & Body Earthing Of 11 / 0.4 Kv Sub-Stations Installed By Digging Of Pit Upto Water Level Depth ( Approx. 125 Feet ) And Then Inserting 1-¼” Dia Gi Pipe Of ‘A’ Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 40X6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. The Aforesaid Work Shall Be Carried Out As Per Resspo Norms. 85 Erection Of Stone Pad 86 Erection Of Peircing Connector 87 Erection Of H.T. / L.T. Clamps With Nuts & Bolts 88 Erection Of Eye-Hook With Suspension Clamps 89 Erection Of 11 Kv Tpmo 90 Erection Of 11 Kv Do Fuse Set 91 Installation Of L.T. Incoming Panel With Metering Equipment 92 Installation Of 33 Kv Lightening Arrestor 93 Fixing Of Lt Distribution Box Including Making Connections Of Distribution Box With Lt Mains By Piercing Clamps For Aerial Bunched Cable.The Work Will Also Include The Opening Of The Service Connection Of The Consumer And Its Connecting In Distribution Box. 94 Installation Of 100 Kva Distribution Transformer On Double Pole / Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. 95 Installation Of 250 Kva Distribution Transformer On Double Pole / Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. 96 After Opening Of Ht & Lt Connections, Dismantalling Of10 Kva Distribution Transformer From Double Pole And Its Safe Carriage From Respective Site To Store Including Loading & Unloading At Both Ends. 97 After Opening Of Ht & Lt Connections, Dismantalling Of25 Kva Distribution Transformer From Double Pole And Its Safe Carriage From Respective Site To Store Including Loading & Unloading At Both Ends. 98 After Opening Of Ht & Lt Connections, Dismantalling Of63 Kva Distribution Transformer From Double Pole And Its Safe Carriage From Respective Site To Store Including Loading & Unloading At Both Ends. 99 After Opening Of Ht & Lt Connections, Dismantalling Of100 Kva Distribution Transformer From Double Pole And Its Safe Carriage From Respective Site To Store Including Loading & Unloading At Both Ends. 100 Removing Of 05 Mva Power Transformer From Plinth To Switchyard As Per Resspo Manual 101 Dismantling Ofold & Used St Poles 09 Mts. And Its Safe Carriage From Site To Store As Per Resspo Norms. 102 Dismantling Ofold & Used Conductor Scrap Form Existing Line And Its Safe Carriage From Site To Store As Per Resspo Norms.

Key Value

Document Fees
INR 5900 /-
EMD
INR 550000.0 /-
Tender Value
INR 5.23 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail