| 1 | SUPPLY PART:1. 400KVA Sub-Station: 400KVA,11/0.4KV Distribution Transformer O/D type conforming to ISI & BEE Specifications. |
| 2 | 9Mtr Long ISI marked Swaged Steel Tubular Pole as per IS 2713/1980 (Part-A) as ammended time to time a/w cap welded on top and Cast Iron Base Plate of designation 410-SP-47. |
| 3 | RCC Muff 2000mm Long withconcrete filling |
| 4 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] forIncomer Line. |
| 5 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA\"s ). |
| 6 | MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch. |
| 7 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Transformer Bed. |
| 8 | MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer]. |
| 9 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer |
| 10 | MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms. |
| 11 | MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings. |
| 12 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box). |
| 13 | MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 Nos |
| 14 | MS Chanel Iron (75x40x6 mm), Length: 0.460 mm x ( 2 No. for GO Switch Handle mounting). |
| 15 | GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type |
| 16 | GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm) |
| 17 | D.O Fuse Unit |
| 18 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 19 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.) |
| 20 | H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 21 | Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 22 | Stay Clamp / Full Clamp (M.S. Flat 50X6 mm) |
| 23 | Sub-Station Pipe Earthing Set (Complete in all respect) |
| 24 | LT distribution Panel Box with ACB(630A, 50KA, 3P, 1No)L&T,Schneider or ABB make at incoming and 2 Nos MCCB 400Amps, 50KA, 3PL&T,Schneider or ABB make at outgoingsuitable for for 400KVA transformer complete in all respect as perrelevant technical specification. |
| 25 | Half Clamp made of MS Flat 50x6mm |
| 26 | Full Clamp made of MS Flat 50x6mm |
| 27 | M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 28 | Aluminium Thimble of various sizes |
| 29 | Aluminium Thimble suitable for main LT cable |
| 30 | Danger Plate (250X200X1.6 mm) |
| 31 | Barbed Wire |
| 32 | LT Cable (3.5 Core) 400 mm² , PVC (1.1KV,3½Core, Aluminium, Unarmoured) . |
| 33 | 3 phase 4 wire, LT/CT Type Electronic Energy Meter for 400KVA Transformer of capacity: 800/5Amps.with Accuracy Class 0.5. (for 11/0.4KV Sub-Station.) |
| 34 | Aluminium Paint. |
| 35 | Red Oxide |
| 36 | LT Switched Capacitor (135KVAr for 400 KVA Transformer (for 11/0.4KV Sub-Station.) |
| 37 | 63KVA SUB-STATION:63KVA,11/0.4KV Distribution Transformer O/D type conforming to ISI & BEE Specifications. |
| 38 | 9Mtr Long ISI marked Swaged Steel Tubular Pole as per IS 2713/1980 (Part-A) as ammended time to time a/w cap welded on top and Cast Iron Base Plate of designation 410-SP-47. |
| 39 | RCC Muff 2000mm Long withconcrete filling |
| 40 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] forIncomer Line. |
| 41 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA\"s ). |
| 42 | MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch. |
| 43 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Transformer Bed. |
| 44 | MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer]. |
| 45 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer |
| 46 | MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms. |
| 47 | MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings. |
| 48 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box). |
| 49 | MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 Nos |
| 50 | MS Chanel Iron (75x40x6 mm), Length: 0.460 mm x ( 2 No. for GO Switch Handle mounting). |
| 51 | GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type |
| 52 | GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm) |
| 53 | D.O Fuse Unit |
| 54 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 55 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.) |
| 56 | H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 57 | Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 58 | Stay Clamp / Full Clamp (M.S. Flat 50X6 mm) |
| 59 | Sub-Station Pipe Earthing Set (Complete in all respect) |
| 60 | LT distribution Panel Box with MCCBWith MCCB(100A, 35KA, 4P, 1No) & SFU(32A, 4No, rewirable) for 63KVA transformer complete in all respect as perrelevant technical specification. (for 11/0.4KV Sub-Station.) |
| 61 | Half Clamp made of MS Flat 50x6mm |
| 62 | Full Clamp made of MS Flat 50x6mm |
| 63 | M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] |
| 64 | Aluminium Thimble of various sizes |
| 65 | Aluminium Thimble suitable for main LT cable |
| 66 | Danger Plate (250X200X1.6 mm) |
| 67 | Barbed Wire |
| 68 | LT Cable (3.5 Core) 95 mm² , PVC (1.1KV,3½Core, Aluminium, Unarmoured) . |
| 69 | 3 phase 4 wire, LT/CT Type Electronic Energy Meter for 63KVA Transformer of capacity: 100/5Amps.with Accuracy Class 0.5. (for 11/0.4KV Sub-Station.) |
| 70 | Aluminium Paint. |
| 71 | Red Oxide |
| 72 | LT Switched Capacitor (27KVAr for 63 KVA Transformer (for 11/0.4KV Sub-Station.) |
| 73 | HT LINE : AAAC 7/4.26mm (100mm²) conductor{Includes 3 conductor lengths for 3F and additional 1% (Sag, Jumpering and wastage} |
| 74 | 11Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56. |
| 75 | RCC Muff 2000mm Long withconcrete filling material |
| 76 | Ms Channel Iron (Horizontal)- MS Channel Iron: 100x50x6, Length 2340mm . |
| 77 | MSAI.Belt Set for X-Bracing set of Size (1800x50x50x6 mm)for Double Pole str. (2Nos per Set) .(for tapping Point) |
| 78 | MSAI Bracing Set for X-Bracing set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ).(for Tapping Point) |
| 79 | Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) . |
| 80 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave,Bend Stapple, Dead End Clamps etc.) |
| 81 | 11 kV Pin Insulators (Porcelain 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure) |
| 82 | H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 83 | Stay wire 7/3.15 mm@ 9.00 kG per stay set |
| 84 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 85 | HT Pipe Earthing Set complete in all respect. |
| 86 | GI Wire 8SWG : for Continous Earth wire {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)}including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 Mtr spacing] at road crossings {0.102 kg/m} |
| 87 | Eye Hook for for Earth wire |
| 88 | Earth Wire Clamp made of M.S. Flat of size (50 x 6mm). |
| 89 | MSAI.X-Arm of Size (2800x50x50x6 mm)for Guarding angle on single Pole |
| 90 | Half Clamp made of M.S. Flat of size(50 x 6mm). |
| 91 | Full Clamp made of M.S. Flat of size(50 x 6mm). |
| 92 | Danger Plate (250X200X1.6 mm) |
| 93 | M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)] |
| 94 | Barbed Wire |
| 95 | Red Oxide |
| 96 | Aluminium Paint |
| 97 | TAPPING POINT: 11Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56. |
| 98 | RCC Muff 2000mm Long withconcrete filling material |
| 99 | MS Chanel Iron (100x50x6 mm), Length: 2800 mm x ( Main Top Channels). |
| 100 | MSAI.Belt Set for X-Bracing set of Size (1800x50x50x6 mm)for Double Pole str. (2Nos per Set) .(for tapping Point) |
| 101 | MSAI Bracing Set for X-Bracing set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ).(for Tapping Point) |
| 102 | Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) . |
| 103 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave,Bend Stapple, Dead End Clamps etc.) |
| 104 | 11 kV Pin Insulators (Porcelain 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure) |
| 105 | H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 106 | Stay wire 7/3.15 mm@ 9.00 kG per stay set |
| 107 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 108 | HT Pipe Earthing Set complete in all respect. |
| 109 | GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type |
| 110 | GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm) |
| 111 | MS Chanel Iron (75x40x6 mm), Length: 2800 mm x ( 2 No. for GO Switch & DO Fuse Unit mounting). |
| 112 | MS Chanel Iron (75x40x6 mm), Length: 0.460 mm x ( 1 No. for GO Switch Handle mounting). |
| 113 | M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)] |
| 114 | CT PT Combined Unit (outdoor type) 11KV/110V, 50/5Amps, accuracy Class 0.5s, ISI Markconforming BEE specification. |
| 115 | HT Energy meter suitable CT PT Combined Unit 11KV/110V, 50/5Amps ISI Markconforming BEE specification. Accuracy Class: 0.5S, Category-C, DLMS Compliant with RS 232 & RS 485 port |
| 116 | Metal Meter Box for housing the Energy meter (item at above serial No.) ISI Mark. |
| 117 | PVC condute Pipe for the protection of 12Core, 2.5mm, Control Cable with PVC Bend etc. |
| 118 | Control Cable 12Core, 2.5mm,PVC(1.1 kV, 12C, HRFRLS, Cu, Un-Screen). |
| 119 | LT LINE : AAAC 7/3.15mm (50mm²) conductor{Includes 3 conductor lengths for 3F and additional 1% (Sag, Jumpering and wastage} . |
| 120 | AB Cable 3x70+1x50+1x16mm² |
| 121 | 9 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32. |
| 122 | RCC Muff 2000 mm long with concrete filling material |
| 123 | Ms Angle Iron - MS Channel Iron: 75x75x6mm. |
| 124 | Full Clamp made of M.S. Flat of size(50 x 6mm). |
| 125 | Shackle Insulator (16 kN) |
| 126 | D-Iron (U- Clamps)made of MS Flat 50x6mm. |
| 127 | Earh Knob |
| 128 | L.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 129 | Stay wire 7/3.15 mm (6.00 kg. per stay set) |
| 130 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 131 | Half Clamp made of MS Flat 50x6mm |
| 132 | LT Earthing Set complete |
| 133 | GI Wire 8SWG : Continous Earth wire and Additional 1% (Sag and wastage)}{0.102 kg/m} |
| 134 | M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]. |
| 135 | Red Oxide |
| 136 | Aluminium Paint |
| 137 | Spool Tie |
| 138 | Kit Kat 200Amps, 415Volts |
| 139 | ERECTION PART: Erection of11/0.4KV, 400KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing ofGO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc.,Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets (2 Nos.), Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect. |
| 140 | Construction of Concrete Cement Plateform (1:3:6)of Size (1.2x1.5x1.5) Mtr for installation of 250KV, 11/0.4KV Transformer including providing of material i.e. i) 0.54Cum Concrete 1:3:6, ii)2.16 Cum Concrete 1:1.5:3 iii) MS/Tor Steel reinforcement 175Kg. iv) MSCI 21.42Kg & cement Plaster 15mm Thick includingExcavation & Form work etc. complete in all respect as per technical specifications and drawings. |
| 141 | Providing and fixing of GI Chain link febric fencing 6.6 Mtrx 3.8 Mtr x 2Mtr of required width in mesh size 50x50mm fencing with Gate of of size 1x2Mtr made of MS Steel angle Ironincluding providing of material i.e. i) 0.40Cum Concrete 1:4:8, ii) 68Kg Structural steel work in single section iii) 83.73Kg Steel work welded in built up section iv) 41.60 m²- GI Wire mesh 50x50mm ,4mm dia wireincluding Painting with synthetic enamel paint of approved brand& erection etc complete in all respect. |
| 142 | Erection of11/0.4KV, 63KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing ofGO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc.,Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets (2 Nos.), Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect. |
| 143 | ERECTION OF 11KV HT LINE :Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paintetc.Complete in all respect. |
| 144 | Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paintetc.Complete in all respect. |
| 145 | Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 146 | Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same andprov. earthing connectioncomplete in all respect. |
| 147 | Laying of Conductor, Stringing, Sagging ofAAAC, 100mm² /7/4.26mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 148 | Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators. |
| 149 | Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set). |
| 150 | Erection of One Set of GO AB Switch Assembly and allied materialincluding MS Channel X-Arms,GO Switch Assembly & making its connections etc. complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 151 | Erection of One Set of DO Fuse Unit Assembly and allied materialincluding MS Channel X-Arms,GO Switch Assembly & making its connections etc. complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 152 | Erection of11KV metering equiment, i.e. CT/PT Unit, Energy Meter Control cable and other allied material including making its connections etc. testing & commissioningcomplete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 153 | ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paintetc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. |
| 154 | Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 155 | Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same andprov. earthing connectioncompletein all respect. |
| 156 | Laying of Conductor, Stringing, Sagging ofAAAC, 50mm² /7/3.15mm² and binding with Insulators (4 wires) and fixing of jumper. |
| 157 | Laying & Erection of LT AB Cableand fixing it with Pole and fixing of jumper. |
| 158 | Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators. |
| 159 | Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set). |
| 160 | Local Transportation Charges for the carriage material by road & through manual carriage to the site of work for 1Nos 63KVA,11/0.4KV Sub-Stations and their associated HT/LT Lines. (Complete Job) |
| 161 | Testing fees & Commissioning Charges etc. for 1No. 63KVA,11/0.4KV Sub-Stations a/w associated HT/LT Lines. (Complete Job).(as per Schedule of General & Service Charges & HP Govt. Notification) |
| 162 | Labour Cess (@ 1%of thetotal amount of the supply, erection, testing & commissioning of 1Nos., 63KVA, 11/0.4KV Sub-Stations and their associatedHT/LT Lines. etc. (for comlete Job). |