Tender For Construction Of 400Kva, & 63Kva, 11/0.4Kv Distribution Sub-Stations And Various Other Electrical Work On Turnkey Basis To Provide Sop To Lwss To Dr. Rkgmc, Jol Sappar Under Esd Nadaun (Ed Nadaun). (Deposit Scheme)Lot-2)Augmentation Of 63Kva, 11, nadaun-Himachal Pradesh

Himachal Pradesh State Electricity Board-HPSEB has published Tender For Construction Of 400Kva, & 63Kva, 11/0.4Kv Distribution Sub-Stations And Various Other Electrical Work On Turnkey Basis To Provide Sop To Lwss To Dr. Rkgmc, Jol Sappar Under Esd Nadaun (Ed Nadaun). (Deposit Scheme)Lot-2)Augmentation Of 63Kva, 11. Submission Date for this Tender is 29-03-2023. Electrical Maintenance Tenders in nadaun Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36968512
Tender For Construction Of 400Kva, & 63Kva, 11/0.4Kv Distribution Sub-Stations And Various Other Electrical Work On Turnkey Basis To Provide Sop To Lwss To Dr. Rkgmc, Jol Sappar Under Esd Nadaun (Ed Nadaun). (Deposit Scheme)Lot-2)Augmentation Of 63Kva, 11
Open Tender
Indian
Himachal Pradesh
nadaun
29-03-2023

Tender Details

Tender For Construction Of 400Kva, & 63Kva, 11 / 0.4Kv Distribution Sub-Stations And Various Other Electrical Work On Turnkey Basis To Provide Sop To Lwss To Dr. Rkgmc, Jol Sappar Under Esd Nadaun ( Ed Nadaun ) . ( Deposit Scheme ) Lot-2 ) Augmentation Of 63Kva, 11 / 0.4Kv To 100Kva & Extension 11Kv Switch Yard

Key Value

Document Fees
INR 590 /-
EMD
INR 15000.0 /-
Tender Value
INR 14.90 Lakhs /-

BOQ Items

Name of Work: Construction of 400KVA, & 63KVA, 11/0.4KV distribution Sub-Stations and various other electrical work on turnkey basis to provide SOP to LWSS to Dr. RKGMC, Jol Sappar under ESD Nadaun (ED Nadaun). (Deposit Scheme)Lot-2)Augmentation of 63KVA, 11/0.4KV to 100KVA & Extension 11KV Switch yard.
Sl. No. Item Description
1SUPPLY PART:1. Augmentation of 63KVA Sub-Station to 100KVA: 100KVA,11/0.4KV Distribution Transformer O/D type conforming to ISI & BEE Specifications.
2LT distribution Panel Boxmade of MS Sheet od 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm) inside painted /powder coated after primar coating equiped With MCCB (160A, 35KA, 4P, 1No) & SFU(6No, rewirable Kit-Kit 200 Amp)for 100KVA transformer complete in all respect as perrelevant technical specification.
3Aluminium Thimble suitable for main LT cable
4LT Cable (3.5 Core) 185 mm² , PVC (1.1KV,3½Core, Aluminium, Unarmoured) .
53 phase 4 wire, LT/CT Type Electronic Energy Meter for 100KVA Transformer of capacity: 200/5Amps.with Accuracy Class 0.5. (for 11/0.4KV Sub-Station.)
6Aluminium Paint.
7Red Oxide
8LT Switched Capacitor (36KVAr for 63 KVA Transformer (for 11/0.4KV Sub-Station.)
92. YARD EXTENSION: 11Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56.
10RCC Muff 2000mm Long withconcrete filling material
114.2 Mtr long M.S. channel iron 100X50X5 mm 9.56 kg/m Cross arms for Sub-Station With 1 No. out going Feeder (11Kv).
12M.S. angle iron 50X50X6 mm 4.5 kg/m Cross arms for Sub-Station With 1 No. out going Feeder [ 4.2x3+5.33x2] (11kV)
13Half Clamp made of M.S. Flat of size(50 x 6mm).
14Full Clamp made of M.S. Flat of size(50 x 6mm).
15M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]
16ACSR6/1/4.72mm (100 mm²)conductor for Jumpers [approx. 4 Mtr/ phase]
17Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors)
18Clamps for 1 Nos. out going Feeder
1911 kV Isolator (12 kV, 1250 A, 25 kA, with Earth Switch, Outdoor) , Tripple Pole Gang operated Outdoor Horizontal Double break Isolator.
20Red Oxide
21Aluminium Paint
22M.S. flat 50x6 mm for ground mat including 5% wastage & weighing 2.4 kg/m (31x15+9x5)x1.05 =535.5 m or 1285.2 kg say 1.285 MT
23Earthing pipe electrode
2420 mm round, 3 Mtr Long & weighing 2.47 kg/m 10 No. Electrode 10x3x2.47 =74.1 kg, say 74 kg
25Welding etc. of points
26GI Wire 6SWG : for Screening etc. {0.102 kg/m}
27Eye block for screening
28Turnbuckle for Screening
29Megger / Insulation Tester (10000 Volts)
30Tong Tester
31Automation and digitisation equipments for 11KV System i.e. One Nos. HP All-in-One 24-cb1907in All-in-One Personal Computer having 12th Generation Intel® Core™ i5 processor Windows 11 Home 60.5 cm (23.8) diagonal FHD display 8 GB DDR4-3200 MHz RAM (2 x 4 GB) Intel® Iris® X? graphics 512 GB Intel® PCIe® NVMe™ SSDwithOne printer i.e.HP LaserJet Pro MFP M126a
323.LT LINE : AAAC 7/3.15mm (50mm²) conductor{Includes 3 conductor lengths for 3F and additional 1% (Sag, Jumpering and wastage} .
33LT, AB Cable 3x70+1x50+1x16mm²,PVC(1.1kV, 3+1 C, Al)
349 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32.
35RCC Muff 2000 mm long with concrete filling material
36Ms Channel Iron (Horizontal)- MS Channel Iron: 75x40x6mm
37Ms Angle Iron - MS Channel Iron: 75x75x6mm.
38Full Clamp made of M.S. Flat of size(50 x 6mm).
39Shackle Insulator (16 kN)
40D-Iron (U- Clamps)made of MS Flat 50x6mm.
41Earh Knob
42LT Stay Set Complete i/c Guy Assembly and Helicallyfittings)
43Stay wire 7/3.15 mm (6.00 kg. per stay set)
44Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
45Half Clamp made of MS Flat 50x6mm
46LT Earthing Set complete
47GI Wire 8SWG : Continous Earth wire and Additional 1% (Sag and wastage)}{0.102 kg/m}
48M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)].
49Red Oxide
50Aluminium Paint
51Spool Tie
52Kit Kat 200Amps, 415Volts
53ERECTION PART:1. Augmentation of 63KVA Sub-Station:Augmentation of11/0.4KV, 63KVA Sub-Station to 100KVA i.e. dismantelingof exiting Transformer, LT Panel, LT Cable, Energy meter etc. and erection of new 100KVA Transformer, LT Panel, LT Cable, Energy metere,fixing of connections.painting of Sub-Station Structure, Testing and commissioning of Transformer and allied equipments complete in all respect Including returning of whole dismantled materail at divisional store.
54Erection of 11 kV Outdoor Gantry for 1 No. 11KV Outgoing Feeder : i.e. erection of 2 Nos Poles , MS Channel X-Arms, Busbars fixing of Jumpers, Isolator, Disc. Insulator and LA etc andErection of Earthing Sets, Earthing Mat & making its connections etc. complete in all respect as per latest standard practices /specification of REC / HPSEBL.
55Erection of One Set of 11KV Auto-reclosure and allied equipments / materialincludingmaking its connections etc. complete in all respect testing and commissioning etc. as per latest standard practices /specification of REC / HPSEBL.
563. ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paintetc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
57Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
58Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same andprov. earthing connectioncompletein all respect.
59Laying of Conductor, Stringing, Sagging ofAAAC, 50mm² /7/3.15mm² and binding with Insulators (4 wires) and fixing of jumpers complete in all respect as per standard practices of HPSEBL/REC.
60Laying of LT AB Cable, Stringing, Sagging,supprting it with poles and fixing of jumpers complete in all respect as per standard practices of HPSEBL/REC..
61Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators.
62Erection Charges of fixing of Jumpers as per latest standard practices /specification of REC / HPSEBL (Per Set).
63Local Transportation Charges for the carriage material by road & through manual carriage to the site of work for 1Nos 63KVA,11/0.4KV Sub-Stations and their associated HT/LT Lines. (Complete Job)
64Testing fees & Commissioning Charges etc. for 1No. 63KVA,11/0.4KV Sub-Stations a/w associated HT/LT Lines. (Complete Job).(as per Schedule of General & Service Charges & HP Govt. Notification)
65Labour Cess (@ 1%of thetotal amount of the supply, erection, testing & commissioning of 1Nos., 63KVA, 11/0.4KV Sub-Stations and their associatedHT/LT Lines. etc. (for comlete Job).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail