Tender For Repairing Work Of Submersible Motor & Pump,Servo Stablizer,Phase Sequence Correcter. Gst Extra.
Tender Overview
Project Description
Repairing Work Of Submersible Motor & Pump, Servo Stabilizer, Phase Sequence Correcter. Gst Extra.- 1 Dismantaling Of Submersible Moter, Proper Cleaning, Replacment Of Replaceble Matarial With Following Rates, Assembling Proper Trial Testing Complete With Labour T&P And Supply And Fitting Of Following. 2 Sand / Guard 3 Thrust Plate 4 Thrustbearing ( Fix Type ) 5 Bearing Bush Uper 6 Bearing Bush Lower 7 Rotor Sleeves Upper 8 Rotor Sleeves Lower 9 Sleeve For Oil Seal 10 Oil Seal 11 Cable Grommet 12 O Ringfor Oil Seal 13 Nylock Nut For Hook Bolts 14 Nylock Nut For Adaptor Status 15 Water Filling / Drain Plug 16 Diphram Pressure Equilzer 17 S.S Washers 18 Circlip For Thrust Plate 19 Studs For Connection Piece 20 Spherical Cap 21 Hookbold Set Upper / Lower 22 Key For Thrustplate 23 Alen Bolts 24 Upper Bearing Housing 25 Lower Bearing Housing 26 Motor Base 27 Motor Base Plate 28 Adaptor Picee 29 Key For Coupling 30 Coupling 31 Pivot Segmentset Gunmetal 32 Pivot Segments.S.S.S 33 Pivot Segmentcarbonn Type 34 Self Aligning Thrust Bearing 35 Counter Thrust Bearing 36 Stator Circlip 37 Balanching Ring 38 T.B Housing C.I 39 Lead Cable Flat Copper ( 10 Sq Mm ) 40 Repariring Of Submercible Motor 41 Rotor Metallizing, Machining Andkey Way Cutting 42 Rotor Dyanmic Balancing 43 Rotor Epoxy Painting & Baking 44 Stator Slots Straightening 45 Cable Jointing 46 Impeller Metallizing 47 Impeller Rectification 48 Impeller Dyanamic Balancing 49 Dismanatling , Servicing Assembling, Testing Painting, Etc. 50 Winding Charge With Materials & Labour. 51 7.5 Hp 52 10 Hp 53 15 Hp 54 20 Hp 55 25 Hp 56 30 Hp 57 35 Hp 58 Dismantaling Of Submersible Pump, Proper Cleaning, Replacment Of Replaceble Matarial With Following Rates, Assembling Proper Trial Tasting Complete With Labour, T&P And Supply And Fitting Of Following. 59 D.O.L Sleeve 60 D.O.L Bush 61 Bearing Sleeve 62 Bearing Bushin Stage Casing 63 Neck Ring 64 Impeller 65 Key For Coupling 66 Pumpfor Coupling 67 Key For Impeller Coupling 68 Pump Shafft ( Two Stage ) 69 Ext. Charge For Each Ext. Stage 70 Runing Sleeve 71 Studs 72 Nylon Nuts 73 Shaffts Nuts 74 Stage Casing 75 Dicharge Out Let ( D.O.L ) 76 Nrv Body 3 To 6 77 Nrv Spring 78 Nrv Spring 79 Rubber Ring Insert 80 Dist. Sleeve In Suction Housing 81 Suction Housing 82 Bearing Bush In Suction Housing 83 Trust Sleeve 84 Sand Guard In Suction 85 Cable Gaurds 86 Screw For Cable Guard 87 Oil Seal 88 Folling Plug 89 Strainer 90 Key For Coller 91 Nrv Adaptor 92 Dismanatling , Servicing Assembling, Testing Painting, Etc. 93 Lifting And Lowering Of Submercible Moter Pump Assembly With Rising Pipe Including Cost Of S / F Nut Bolt, Packing, Welding / Grinding Repair And Change Of Moter Pump Assembly. 94 Repairing Ofphase Sequance Connector. 95 S / F Phase Sequance Relay. 96 S / F Contactor. 97 S / F Mcb. 98 Power Wiring. 99 Repairing Of Servo Stablizer Labour. 100 Complete Sevicing Charge Of Servo Makes Power Stablizer Complete Labour Work. 101 Complete Overhailing Of Servo Stablizer With Pointing Driwing And Reprecement Of Replacable Part ( Labour Cost Only ) Replacable Separately. 102 Replacable Parts. 103 S / F Variable Transformer Dimmer 03 Nos Stablizer. 104 S / F Corbon Brush 03 Nos Per Stablizer. 105 S / F Servometer-Syncronizing Moter Capacity 10Kg. 106 S / F Buck Boost Transformer ( Series Transformer ) ( Transformer Winding ) 03 Noseach Stablizer. 107 S / F Contactor Or Ralay 100 Amp. 108 S / F Mcb / Mccb 100 Amp. 109 S / F Electronic Circuit. 110 S / F Digital Pannel. 111 Tranformer Oil Filtration By Cerifugal Process. 112 Supply Of New Transformer Oil. 113 S / F Insulater-7Nos In Each Servostablizer ( 03 Nos In Coming Side, 03 Outgoing Side & 01 Nos Nutrable ) 114 Power Wiring. 115 Control Wiring.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantaling of submersible Moter, proper cleaning, replacment of replaceble matarial with following rates, Assembling proper trial testing complete with labour T&P and Supply and fitting of following. |
| 2 | Sand/Guard |
| 3 | Thrust plate |
| 4 | ThrustBearing (fix Type) |
| 5 | Bearing Bush Uper |
| 6 | Bearing Bush Lower |
| 7 | Rotor sleeves upper |
| 8 | Rotor sleeves lower |
| 9 | Sleeve for oil seal |
| 10 | Oil seal |
| 11 | cable Grommet |
| 12 | o ringfor oil seal |
| 13 | Nylock Nut for Hook bolts |
| 14 | Nylock Nut for Adaptor Status |
| 15 | water filling/Drain plug |
| 16 | Diphram pressure equilzer |
| 17 | s.s Washers |
| 18 | circlip for thrust plate |
| 19 | studs for connection piece |
| 20 | spherical cap |
| 21 | Hookbold set Upper/lower |
| 22 | Key for Thrustplate |
| 23 | Alen Bolts |
| 24 | upper bearing housing |
| 25 | lower bearing housing |
| 26 | Motor Base |
| 27 | Motor Base plate |
| 28 | Adaptor picee |
| 29 | key for coupling |
| 30 | coupling |
| 31 | pivot segmentset Gunmetal |
| 32 | pivot segments.s.s.s |
| 33 | pivot segmentcarbonn Type |
| 34 | Self Aligning thrust Bearing |
| 35 | Counter Thrust bearing |
| 36 | stator circlip |
| 37 | Balanching Ring |
| 38 | T.B Housing C.i |
| 39 | Lead cable Flat copper( 10 sq mm) |
| 40 | REPARIRING OF SUBMERCIBLE MOTOR |
| 41 | Rotor Metallizing, machining andKey Way Cutting |
| 42 | Rotor Dyanmic Balancing |
| 43 | Rotor Epoxy Painting & Baking |
| 44 | Stator slots Straightening |
| 45 | Cable Jointing |
| 46 | Impeller Metallizing |
| 47 | Impeller Rectification |
| 48 | Impeller Dyanamic Balancing |
| 49 | Dismanatling ,Servicing Assembling, Testing Painting, Etc. |
| 50 | Winding Charge With Materials & Labour. |
| 51 | 7.5 HP |
| 52 | 10 HP |
| 53 | 15 HP |
| 54 | 20 HP |
| 55 | 25 HP |
| 56 | 30 HP |
| 57 | 35 HP |
| 58 | Dismantaling of submersible pump, proper cleaning, replacment of replaceble matarial with following rates, Assembling proper trial tasting complete with labour, T&P and Supply and fitting of following. |
| 59 | D.O.L sleeve |
| 60 | D.O.L Bush |
| 61 | Bearing Sleeve |
| 62 | Bearing Bushin stage Casing |
| 63 | Neck ring |
| 64 | Impeller |
| 65 | key for coupling |
| 66 | Pumpfor coupling |
| 67 | key for Impeller coupling |
| 68 | Pump shafft (Two Stage) |
| 69 | EXT. charge for Each ext. stage |
| 70 | Runing sleeve |
| 71 | Studs |
| 72 | Nylon Nuts |
| 73 | shaffts Nuts |
| 74 | Stage Casing |
| 75 | Dicharge out let (D.O.L) |
| 76 | NRV Body 3\" to 6\" |
| 77 | NRV Spring |
| 78 | NRV Spring |
| 79 | Rubber Ring insert |
| 80 | Dist. Sleeve in Suction Housing |
| 81 | Suction Housing |
| 82 | Bearing Bush in suction Housing |
| 83 | Trust Sleeve |
| 84 | Sand Guard in Suction |
| 85 | Cable Gaurds |
| 86 | Screw for Cable Guard |
| 87 | Oil seal |
| 88 | Folling Plug |
| 89 | Strainer |
| 90 | Key for coller |
| 91 | NRV Adaptor |
| 92 | Dismanatling ,Servicing Assembling, Testing Painting, Etc. |
| 93 | Lifting and lowering of submercible moter pump assembly with rising pipe including Cost of S/F nut bolt, packing, welding/grinding repair and change of moter pump assembly. |
| 94 | Repairing ofPhase sequance connector. |
| 95 | S/F Phase sequance relay. |
| 96 | S/F contactor. |
| 97 | S/F MCB. |
| 98 | Power wiring. |
| 99 | Repairing of servo stablizer labour. |
| 100 | Complete sevicing charge of servo makes power stablizer complete labour work. |
| 101 | Complete overhailing of servo stablizer with pointing driwing and reprecement of replacable part (labour cost only) replacable separately. |
| 102 | Replacable parts. |
| 103 | S/F Variable transformer dimmer 03 nos stablizer. |
| 104 | S/F Corbon brush 03 nos per stablizer. |
| 105 | S/F Servometer-syncronizing moter capacity 10kg. |
| 106 | S/F Buck boost transformer (series transformer) (Transformer winding) 03 Noseach stablizer. |
| 107 | S/F Contactor or ralay 100 Amp. |
| 108 | S/F MCB/MCCB 100 Amp. |
| 109 | S/F Electronic circuit. |
| 110 | S/F Digital pannel. |
| 111 | Tranformer oil filtration by cerifugal process. |
| 112 | Supply of new transformer oil. |
| 113 | S/F Insulater-7nos in each servostablizer (03 nos in coming side, 03 outgoing side & 01 nos nutrable) |
| 114 | Power wiring. |
| 115 | Control wiring. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender