| 1 | AMC (monthly O&M Charges) of OWS facilities and network : Operation, Manning and Maintenance charges for operation & maintenance of OWS system (150 KL/Hr x 3, details of the equipment are mentioned in the scope of work) at IOCL, Mundra Pump Station, deployment of requiredmanpower for operation and maintenance of the system including one skilled technician as maintenance in charge, two semi-skilled labor for operation and one unskilled labor for housekeeping and upkeepment of area in general shift. All inclusive of tools and tackles including personal protective equipment for the manpower deployed at site, testing equipment including supply of all routine spares/consumables at No extra cost to IOCL, all transportation, all procurement efforts and all labour etc., carrying out routine, preventive, major overhauling, breakdown maintenance of all equipment and system network as per sound engineering, OEM recommendations, operating and maintenance practices, as per special condition of contract and directions of EIC. |
| 2 | Carriage of oily sludge (Hard or liquid sludge as directed) , bio sludge, fecal sludge, ETP sludge etc.or manure by mechanical transport for following leads or part thereof including loading, unloading and stacking and disposing of within station premises complete in all respect as per the direction of the Engineer-in-Charge. |
| 3 | Cleaning of manholes, dechoking and flushing of fecal sewage lines of different diameters between two manholes with drain cleaning rods, bamboos strips flushing with water and compressed air, removal of sludge inside 100 metres lead, all labour including transportation of required machinery tools, plants etc. complete. The compressed air and water at one point shall be supplied free of cost, if required. (Dechoking with manual labour) |
| 4 | Removal of oil spillage by sprinkling earth / sand, rubbing the surface with wire brushes, disposing the rubbish, debris, waste materials and oily sand to the melting pit or at a specified place as directed by engineer-in-charge all complete with labour, materials, tools, tackles, sand etc. including using hot water for spillage removal and final cleaning wherever required. The hot water mixed with oil, muck etc. shall be routed to the nearest industrial oil water sewage manhole. Sand shall be supplied by the engineer-incharge at a suitable place within station or shall be paid for seperately |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 6 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 7 | Cleaningofstormwatersump/oily water sump/emergency pit of old owswithhelpofchainpulleyand bucketwithmaterial,includinglabour,tools and tackles & Loading, shifting and unloading of sludge/oil from sludge sitetosludge bed with material, includinglabour, tool and tackles as per the instruction of engineer in charge |
| 8 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 9 | Testing of effeluent discharge from stations. Following tests are to be conducted on effeluent discharge and other requirements as per direction of EIC generally once in a month or as directed by EIC.1. pH2. Temperature3. Colour (Pt Co scale) in units4. Suspended Solids mg/l5. Oil and Grease mg/l6. Ammonial Nitrogen mg/l7. BOD(l 3 days at 27 deg C) mg/l8. COD mg/l9. Chlorides mg/l10. Sulphate mg/l11. Total dissolve solids mg/l12. Percent Sodium % |
| 10 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete : On steel works |
| 11 | Providing River Grass and installation of hay filters for using in the open surface drains to arrest crude oil traces in running water .The river grass has to be installed at various locations in the open surface drains with the help of materials & labours supplied by the contractor. RATES PER LOCATION BASIS |
| 12 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. Note: Unit KL stands for \"Kilo Litres\". |
| 13 | Cleaning of chocked sewer line/crude drain lines by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial desilting of manholes and dechocking of sewer lines. Dechocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150 mm dia up to 300 mm dia for all depth. |
| 14 | Textured exterior paint: New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm |
| 15 | Cleaning and desilting of drains, side slopes in or under water or above water level and along drain both sides upto 1.0 metre width including removal of grass, bushes, vegetation, debris, sludge and any other unwanted material and disposal of the same at places as directed by Engineer-in-Charge within owner\"s premises including all labour, materials, tools, tackles, transportation for all lead and lifts as directed.Cross section of drain upto 2.0 sqm. |
| 16 | Cleaning and desilting of drains, side slopes in or under water or above water level and along drain both sides upto 1.0 metre width including removal of grass, bushes, vegetation, debris, sludge and any other unwanted material and disposal of the same at places as directed by Engineer-in-Charge within owner\"s premises including all labour, materials, tools, tackles, transportation for all lead and lifts as directedCross section of drain above 2.0 sqm. and upto 4.0 sqm. |
| 17 | Cleaning and desilting of drains, side slopes in or under water or above water level and along drain both sides upto 1.0 metre width including removal of grass, bushes, vegetation, debris, sludge and any other unwanted material and disposal of the same at places as directed by Engineer-in-Charge within owner\"s premises including all labour, materials, tools, tackles, transportation for all lead and lifts as directedCross section of drain above 4.0 sqm. and upto 10.0 sqm. |
| 18 | Cleaning of equipments including auxiliaries of the equipments with cotton waste cloth (supplied by IOC) including disposing off of all oily wasteinto dustbin. Pigging motor and pump complete unit/ Drum skimmer, belt skimmer including belt complete unit (Removing of sludge also included)/ Oily water Pump/ storm water pump / ETP pump / CI pump.(along with motors) |
| 19 | Cleaning of equipments including auxiliaries of the equipments with cotton waste cloth (supplied by IOC) including disposing off of all oily wasteinto dustbin. Compressor and Air vessel, Multimedia filter, coalescer filter. |
| 20 | Providing hydraulic crane/ Hydra with skilled operator along with belts, chains, hooks etc for various jobs as per directions of EIC/ Site Engineer. Minimum capacity- 7.5 ton |
| 21 | Providing & operating JCB with skilled operator for earth work in excavation in both ordinary & Rocky soil for area grading inside pump station premises and in its periphery etc. including backfilling the same after completion of work in all respect and up to the satisfaction of Site Engineer / EIC & the cost includes all labour, materials, fuel, all Consumable complete as per direction of SiteEngineer/ EIC. |
| 22 | Teflon belt for oil skimmer. Design and MOC of cartridge as per OEM specifications. Belt length 4 meters, circumferential lenth 8.5 meters.Complete in all respect and up to the satisfaction of Site Engineer / EIC & the cost includes all labour, materials, fuel, all Consumable complete as per direction of SiteEngineer/ EIC. |