|
| 1 | Earthwork in excavation in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms,lift upto 1.5m,including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50m |
| 2 | Supplying & filling in plinth,under floors,foundation etc with sand(fine0 from local quarry with all lifts including spreading in horizontal layers,watering,grading,to required slope,ramming consolidation and compacting each layers by using plate compactor or by any suitable method complete. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of Centaring & Shuttering- All works upto plinth level1:4:8 (1 cement : 4 fine Sand : 8 graded well burnt brick aggregate 40 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering,finishing and reinforcement.--All works upto plinth level |
| 5 | Reinforced cement concrete work in walls(any thickness), including attached pilasters, buttressess, plinth and skirting courses, fillets, columns, pillars,piers, abutments,posts and struts etc upto floor five level excluding the cost of cenetering, shuttering, finishing & reinforcement |
| 6 | RCC work in beams, suspended floor, roofs having slope upto 15 degree landings, balconies, shelves, chajjas, lintels,bands,plain window sills,staircases and spiral stair cases excluding spiral staircases excluding precast spiral staircase.1:2:4 (1 cement:2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) |
| 7 | Centering shuttering including strutting,propping etc and removal of form work for: Foundations,footings,bases,for columns etc for mass concrete with timber plank |
| 8 | Reinforcement for RCC works including straightening, cutting, bending, placing in position & binding all complete upto floor five level, Thermo-Mechanically Treated bars/Cold Twisted deformed steel barsAs per item no 8,9,10 Total Quantity of RCC work= 43.632 Cum @ 120kg/Cum |
| 9 | First class brick work in foundation and plinth including cost of all materials as required completeIn cement morter 1:6 ( 1Cement : 6 fine sand) |
| 10 | Half brick masonry with first class bricks in superstructure above plinth level upto floor five level including cost of all materials required complete |
| 11 | 12 mm Cement Plaster of mixCement mortar 1:4 ( 1 Cement : 4 fine sand) |
| 12 | Providing & fixing M.S grills of required pattern in frames of windows etc with M.S flats,square or round bars etc all complete. Fixed to Openings/Wooden frames with rawl plugs screws etc. |
| 13 | Applying one coat of water thinnable cement primer ofapproved brand and manufacturer on wall surface complete.Water thinnable cement primer |
| 14 | Finishing walls with water proofing cement paint of required shade of approved brand and manufacture[Payment shall be made after submission of Test Certificate issued by the Manufacturer] |
| 15 | Applying priming coat [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel,galvanised iron/steel work |
| 16 | Finishing with epoxy paint (two or more coats) of approved brand and manufacture at all location prepared and applied as per manufacturer\"s specification on new work including appropriate priming coat,preparation of suface etc complete. |
| 17 | Painting lines,dashes,arrows,etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bitumenous/concrete surface, including cleaning the surface of all dirt,dust and other foreign matter,demarcation at site and traffic control as per drawing and MoRD Technical Specification Clause 1702 |