New Okhla Industrial Development Authority-NOIDA has published Tender For Maintenance Of Park (Construction Of Gazebo Hut In Park Near Mandir, G Block Sector-22, 14, 70, 72, 73, 120, 121 And G Block Park Sector-20) Noida. (Total Gazebo Hut 11 Nos.). Submission Date for this Tender is 04-04-2023. Gardening Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. (DSR Code No.-2.6.1) AORRate = AOR rate + 18% GST, Rs.= 136.00 + 24.48 = 160.48 |
2 | Earth work in excavation by mechanical means (hydraulic excavater)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. All kinds of soil. (DSR Code No.-2.8.1) AORRate = AOR rate+ 18%GST.Rs. = 144.93 + 26.09 = 171.02 |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (DSR CodeNo.-4.1.8) AOR Rate = AOR rate + 18% GST,Rs.= 5746.88 + 1034.44 = 6781.32 |
4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (DSR Code No.-5.1.2)AORRate = AOR rate + 18% GST,Rs.= 7359.68 + 1324.74 = 8684.42 |
5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars(DSR Code No.-5.22.3) AOR Rate = AOR rate + 18% GST, Rs.= 65.02 + 11.70 = 76.72 |
6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete (DSR-18/ Item Code.No-5.9.1) AOR(Rate = AOR rate+ 18%GST. Rs. = 181.64 + 32.70 = 214.34) |
7 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR Code No.-5.9.5)AOR (Rate = AOR rate+ 18%GST. Rs. = 320.65 + 57.72 = 378.37) |
8 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts (DSR Code.No-5.9.6) AOR (Rate = AOR rate+ 18%GST. . Rs. = 426.85 + 76.83 = 503.68) |
9 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform (DSR Code No.-5.9.3)AOR (Rate = AOR rate+ 18%GST.. Rs. = 385.68 + 69.42 = 455.10) |
10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR Code No.-6.1.1)AOR Rate = AOR rate + 18% GST, Rs.= 5214.80 + 938.66 = 6153.46 |
11 | 12 mm cement plaster of mix 1:4 (1 Cement : 4 C. Sand). (DSR Code.No-13.4.1) AORRate = AOR rate + 18% GST, Rs.= 176.77 + 31.82 = 208.59 |
12 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shade. Area of slab over 0.50 sqm (DSR-18/ Item Code No.-8.2.2.2)AORRate = AOR rate + 18% GST, Rs.= 3106.62 + 559.19 = 3665.81 |
13 | Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. Granite work (DSR Code No-8.3.2) AOR Rate = AOR rate + 18% GST,Rs.= 237.99 + 42.84 = 280.83 |
14 | Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete. (DSR Code No.-13.26)AORRate = AOR rate + 18% GST, Rs.= 117.27 + 21.11 = 138.38 |
15 | Supply and fixing Garden benches of standard quality in cast iron frame with 11 Nos. rectangular MS pipe of 70x25mm on seat and back of size 5 foot length and 2 foot 6 inches height and seat depth 15 to 18 inches approximate with weight of 90 Kg approx. embedded with hold fast in C.C. block 6"x6"x9" duly painted & as per approved design i/c cartage loading , unloading etc complete in all respects. AOR |
16 | P/f floral and ornate decorative design cast iron base panels of thickness 20mm as per design copy enclosed having height of 760mm and length of 2700 (approx.) each cast iron panel having mild steel flat of size 40x25mm on top in framing and hold fast 150.00mm length embedded in to the column, pillar at either end with proper grinding of welded marks. Electric supply for welding work to the arranged by the contractor complete. Sprandal, spray primer and painted with enamel paint of approved brand, quility, color complete as per the direction of E/I. Total weight of one panel shall be 85.00 Kg. Approx.(MR) |
17 | Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) and finished neat complete. (DSR Code No.-12.20)AOR Rate = AOR rate + 18% GST,Rs.= 423.61 + 76.25 = 499.86 |
18 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (DSR Code.No-13.46.1) AOR Rate = AOR rate + 18% GST, Rs.= 123.65 + 22.26 = 145.91 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail