Tender For Design, Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada For 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor, Karnal-Haryana

Public Health Engineering Department-PHED has published Tender For Design, Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada For 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor. Submission Date for this Tender is 05-04-2023. SCADA Tenders in Karnal Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

36930630
Tender For Design, Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada For 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor
Open Tender
Indian
Haryana
Karnal
05-04-2023

Tender Details

Design, Construction , Erection , Testing And Commissioning Of Automatic And Plc Controlled With Scada For 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor

Key Value

Document Fees
INR 15000 /-
EMD
INR 1042820.0 /-
Tender Value
INR 5.21 Crore /-

BOQ Items

Name of Work: Design, Construction , Erection , Testing and Commissioning of Automatic and PLC controlled with SCADA for 2.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor technology, construction of 2.5MLD with peak factor of 3 timesMain Pumping station withautomatic and PLC controlled with SCADA, complete in all respect including disposal of treated effluent through RCC pipes NP-3 by gravity,storm water/seweragesystem in plant campus, Staff quarters, approach roads, boundary wall, land scaping, MCC panel Room, Laboratory, CCTV cameras, Transformer,DG set, HT/ LT panel room, meter room, Security room, Boundary wall, providing and installation of high mast lights and street lights withsolar panel, internal lighting, other contingent, Electrical, Mechanical, Piping & instrumentation work and all other works contingent thereto including Operation & Maintenance for 12months during defect liability period after trial run of 3months and 5years thereafter in village Barsat Distt. Karnal”
Sl. No. Item Description
1MAIN PUMPING STATIONS Design, construction, erection, testing & commissioning of MPS and following components including O&M for 5 years after one year defect liability period and 3 month trial run period:- (i). RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.50 MLD average flow with peak factor of 3.00 non clog submerssible landscaping of the campus providing and installing of 5 No. Pumping Set of i.e. 1 no. 5300 LPM (312.50 cum per hour), 2 no. 1800 LPM (104.20 cum per hour) & 2 no. 900 LPM (52.10 cum per hour) with 15 mtr. Head each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect (ii). K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 Mtr. for 2.50 MLD average flow with peak factor of 3.0:- i)The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii)All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. iii)All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC & SCADA and shall be synchronized with PLC panels at MPS & STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work including O&M of 5 years after 12 months defect liability and 3 months trail run period
2SEWAGE TREATMENT PLANT “Design, construction, erection, testing & commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including, Landscaping, MCC Panel Room & all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (Online analyzer) Piping & Instrumentation works with PLC & SCADA Arrangement for STP & MPS along with Synchronizing it with each other including furniture & laboratory equipments as per detail given in the bid document and including following components including O&M for 5 Years after 12 months defect liability period and 3 months trial run period i) Supply and installation of 2 No. fine screens of suitable size for 2.50 MLD average flow with peak factor of 3. ii) No. High Mast of 9 mtr. GI Octagonal pole of 4 mm thickness (T=100 MM, B= 200 MM, Base Plate-320x320x20mm), window at 500 mm from Base Plate) 12 Nos. Providing & fixing of Solar light 30 watt with dark & motion sensor, 2 level intelligent dimming after 3 and 6 hours of operation, IEC certified solar panel, LM80 certified LED, IP 65 complaint design to protect from rain & dust and UL certified lituimion battery with 2 year system warranty of 6 Mtr. GI pole complete in all respect, along the road and path complete in all respect Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg at STP site.As per satisfaction of Engineer-in-Charge Providing and installing 2 No. centrifuges (1working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20 kg Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period and 3 months trail run period.
3ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:- Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 2.50 MLD STP Barsat for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB & PHED.TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluent and as contained in scope of work including operation & Maintenance of 5 Years after 12 months defect liability period and 3 months trail run period Multi-parameter measuring converter, for connecting up to 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs & 4 outputs) (o/4-20 Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet/ effluent of plant of 2.50 MLD STP at village Barsat with integrated with automatic cleaning Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier & temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) Data Transfer to CPCB, HSPCB & PHED Servers during 6 year of O&M after commissioning after 3 months trial period (including 1 year of defect liability period) Providing GSM 5G, 4G Modem with mobile network connectivity including network charges for operation & Maintenance of 5 years after 12 months defect liability period and 3 months trail run period
4CCTV CAMERAS Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site.
5Construction of HT/LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 250 sqm. including operation & Maintenance of 5 years after 12 months defect liability period and 3 months trail run period
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail