|
| 1 | P/F Front auxiliary \"A\" |
| 2 | P/F Front auxiliary \"B\" |
| 3 | P/F Rear auxiliary \"A\" |
| 4 | P/F Rear auxiliary \"B\" |
| 5 | P/F Helper auxiliary |
| 6 | P/F Rear clamp Bolt |
| 7 | P/F Rear U-Bolt |
| 8 | P/F New Rear & Front kamani pin |
| 9 | P/F Front clamp Bolt |
| 10 | P/F Front U-Bolt |
| 11 | P/F Rear & Front Centre Bolt |
| 12 | P/F Kamani bush each |
| 13 | Re-arching & Fixing of New Front Leaf spring labour |
| 14 | Re-arching & Fixing of New Rear Leaf Spring labour |
| 15 | Dismantling & cutting of old safety guard & P/F new safety guard on both sides of the tanker as per old |
| 16 | Front wheel greasing of 2 No.s hubs i/c oil seal, grease, washer, kerosine oil etc. |
| 17 | Rear wheel greasing of 2 No.s hubs i/c oil seal, grease, washer, kerosine oil etc. |
| 18 | Repairing of seat & P/F New seat cover including necessary fittings (Spring, sponge, etc) |
| 19 | P/F New rear bumper 4 x 2 (100 x 50) complete with towing hook i/c all necessary fittings |
| 20 | Dismantling of old Front Bumper & P/F New front bumper |
| 21 | P/F New Rear Mud Flap with nut bolt |
| 22 | P/F New Rear MS Mudguard |
| 23 | P/F Roof indicator lights, Side indicator lights, Tail lamps(BULBS only), light bracket(if required) minor wiring repair with wiper blades etc. |
| 24 | P/F Front windscreen with rubber |
| 25 | P/F Rear View Mirror Wide Angled |
| 26 | Minor Repairing of the damaged silencer. Welding new small silencer piece if required |
| 27 | Cleaning & buffing outside the SS tanker complete |
| 28 | Cabin Door lock repair |
| 29 | Written work on tanker |
| 30 | Denting of front Bonnet, Bumper, floor, door, and cabin |
| 31 | Painting of cabin, complete Chassis, Rims & Rear Bumper |
| 32 | Repairing of battery box |
| 33 | Drawbar of TT complete with hook, spring, nut bolt |
| 34 | New kamani of trailer tanker |
| 35 | U bolt of kamani |
| 36 | Naka pin of kamani new with fitting |
| 37 | P/F New rim size 7.50x16 |
| 38 | P/F Hook & spring |
| 39 | New MS container of size 3mm complete body with Front and Rear wall of 4mm MS sheet. |
| 40 | New Chassis of trailer tanker |
| 41 | Mudguard of rear trailer tanker |
| 42 | Ball bearing of size 32213/32214 |
| 43 | New hub stud bolt |
| 44 | Kamani pin/bolt |
| 45 | P/F New Manhole cover complete of TT |
| 46 | P/F New heavy duty hub of size 7.50.16 with stud for TT |
| 47 | Letter writing work of slogan colour 3 side of TT |
| 48 | Re-arching & setting of kamani of 4no.s of TT each |
| 49 | Wheel greasing of the hub (4No.s each) of TT i/c grease, oil seel, washing with kerosine oil & hub cover, etc. |
| 50 | Welding piece inside the trailer tanker bottom sheet to prevent leakage |
| 51 | Repairing of turntable complete |
| 52 | P/F New Rear Ladder of Trailer Tanker |
| 53 | Painting of trailer tanker complete paint inside: EPOXY paint inside and FIROZA BLUE paint outside |
| 54 | Less old scrap (approx. in Kgs) i/c cutting, loading & unloading charges |