Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment / Material , Design, Erection, Testing Commissioning For Sop To Govt. Iti Garnota (Building Additional Accommodation) In Tehsil Bhatiyat By Prov. 11/.4 Kv 400 Kva S/Stn. A/W 11 Kv Ht And Lt Line Section Si. Submission Date for this Tender is 27-03-2023. Overhead Line Tenders in dalhousie Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply part of 11/.4 KV 400 KVA DISTRIBUTION SUB STATION |
2 | 11/.4 KV 400KVA DTR (REC Sep. ord 11/1976 |
3 | Prov. ST PolePole 10 Mtr. Long W/L 200 Kgs |
4 | Muff for steel tubular pole with concrete filling |
5 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
6 | MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LA"s ) |
7 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
8 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
9 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
10 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. |
11 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
12 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
13 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
14 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
15 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
16 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
17 | D.O Fuse unit |
18 | Surge Arrester, 9 kV Station Class |
19 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
20 | Stay set complete |
21 | Staywire (7/3.15mm)( 10 Kg per stay set) |
22 | Pipe earthing with GI,Charcoal & Salt |
23 | Prov. LT distribution panel with ACB (630 A, 50 KA, 4P,1 No.) & SFU (100 A 6 No. rewireble) for 400KVA Trf. as per specification |
24 | Half clamp (M.S. Flat 50x6) |
25 | Full clamps (M.S. Flat 50x6) |
26 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
27 | Aluminium Thimbles |
28 | Copper Thimble |
29 | Danger Plate |
30 | Barbed wire (REC Sp F 3/1981) |
31 | LT Cable 3-1/2 core-185mm sq. |
32 | Alluminium Paint |
33 | Prov.ACSR, 6/1/3.35 mm |
34 | prov. HP make AIQ Desktop Model HP 200 G4 with intell core 3-10110U-10 Gen.processor, 8GB DDR4 RAM expenditure upto 16 GB, ITB, HDO (T2QORPM)2st antiglare LED desplay withFHD (1920x1060) integrated HD Graphics & Webcam, 2xUSB, 3.0 2xUSB, 2.0 Cardreacer. Audio part VGNHDMI/DP Port, 10x100, 1000Mcomdliant LAN USB key board & mouse internalspl. connectivity BO2 11 b/g/n/ac PL windows etc. with three years on site warranty. (II) 650VA offline UPS system with12Vx7AHx2Nos: 158VAH/SMF batteryto povide20 Min. battery back upwith three year warrantyon UPS &battery from delivery with printer |
35 | Prov. Transformer Bed plinth for 400KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. |
36 | Erection part of 11/.4 KV 400 KVA DISTRIBUTION SUB STATION |
37 | 11/.4 KV 400KVA DTR (REC Sep. ord 11/1976 |
38 | Prov. ST PolePole 10 Mtr. Long W/L 200 Kgs |
39 | Muff for steel tubular pole with concrete filling |
40 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
41 | MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LA"s ) |
42 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
43 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
44 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
45 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. |
46 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
47 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
48 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
49 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
50 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
51 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
52 | D.O Fuse unit |
53 | Surge Arrester, 9 kV Station Class |
54 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
55 | Stay set complete |
56 | Staywire (7/3.15mm)( 10 Kg per stay set) |
57 | Pipe earthing with GI,Charcoal & Salt |
58 | Prov. LT distribution panel with ACB (630 A, 50 KA, 4P,1 No.) & SFU (100 A 6 No. rewireble) for 400KVA Trf. as per specification |
59 | Half clamp (M.S. Flat 50x6) |
60 | Full clamps (M.S. Flat 50x6) |
61 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
62 | Aluminium Thimbles |
63 | Copper Thimble |
64 | Danger Plate |
65 | Barbed wire (REC Sp F 3/1981) |
66 | LT Cable 3-1/2 core-185mm sq. |
67 | Alluminium Paint |
68 | Prov.ACSR, 6/1/3.35 mm |
69 | prov. HP make AIQ Desktop Model HP 200 G4 with intell core 3-10110U-10 Gen.processor, 8GB DDR4 RAM expenditure upto 16 GB, ITB, HDO (T2QORPM)2st antiglare LED desplay withFHD (1920x1060) integrated HD Graphics & Webcam, 2xUSB, 3.0 2xUSB, 2.0 Cardreacer. Audio part VGNHDMI/DP Port, 10x100, 1000Mcomdliant LAN USB key board & mouse internalspl. connectivity BO2 11 b/g/n/ac PL windows etc. with three years on site warranty. (II) 650VA offline UPS system with12Vx7AHx2Nos: 158VAH/SMF batteryto povide20 Min. battery back upwith three year warrantyon UPS &battery from delivery with printer |
70 | Prov. Transformer Bed plinth for 400KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. |
71 | Supply Part of HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.200 KM) |
72 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} |
73 | Prov. Steel tubular poles. 10mtrs |
74 | Muff for steel tubular pole (2000mm long) with concrete filling |
75 | Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) |
76 | Angle Iron (50x50x5 mm), Length (2x750) mm x 1 structures (Run Through structure (Formation Tringle) |
77 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
78 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) |
79 | Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures |
80 | X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures |
81 | X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures |
82 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures |
83 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures |
84 | Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
85 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
86 | HT earthing set complete (REC Constr. Standared J-1) |
87 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
88 | Eye Hook for earth wire |
89 | Earth Wire Clamp |
90 | MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing/G.O Switch |
91 | Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
92 | Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
93 | Danger Plate (250X200X1.6 mm) |
94 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
95 | Barbed wire (REC Sp F 3/1981) |
96 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
97 | Alluminium Paint |
98 | 11 KV Isolator Switch (11KV, 630A, 25A w/ES) for 33 KV S/stn at Sihunta |
99 | Erection Part of HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.200KM) |
100 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} |
101 | Prov. Steel tubular poles. 10mtrs |
102 | Muff for steel tubular pole (2000mm long) with concrete filling |
103 | Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) |
104 | Angle Iron (50x50x5 mm), Length (2x750) mm x 1 structures (Run Through structure (Formation Tringle) |
105 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
106 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) |
107 | Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures |
108 | X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures |
109 | X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures |
110 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures |
111 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures |
112 | Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
113 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
114 | HT earthing set complete (REC Constr. Standared J-1) |
115 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
116 | Eye Hook for earth wire |
117 | Earth Wire Clamp |
118 | MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing/G.O Switch |
119 | Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
120 | Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
121 | Danger Plate (250X200X1.6 mm) |
122 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
123 | Barbed wire (REC Sp F 3/1981) |
124 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
125 | Alluminium Paint |
126 | 11 KV Isolator Switch (11KV, 630A, 25A w/ES) for 33 KV S/stn at Sihunta |
127 | Supply Part of CT/PT Unit |
128 | Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (3No.10-400/500A) accuracy class 0.5S. |
129 | Prov, Energy meter (3 phase, 4 wire) HT CT type for Above |
130 | Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing |
131 | X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit |
132 | CT-PT Unit Belting and Knee Bracing |
133 | MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. |
134 | MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. |
135 | Half clamp (MS Flat 50x6 mm) |
136 | Full clamp (MS Flat 50x6 mm) |
137 | Nut & Bolts off size |
138 | Aluminium Thimble |
139 | copper Thimble |
140 | Erection Part of CT/PT Unit |
141 | Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (3No.10-400/500A) accuracy class 0.5S. |
142 | Prov, Energy meter (3 phase, 4 wire) HT CT type for Above |
143 | Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing |
144 | X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit |
145 | CT-PT Unit Belting and Knee Bracing |
146 | MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. |
147 | MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. |
148 | Half clamp (MS Flat 50x6 mm) |
149 | Full clamp (MS Flat 50x6 mm) |
150 | Nut & Bolts off size |
151 | Aluminium Thimble |
152 | copper Thimble |
153 | Supply Part of THREE PHASE LT LINE WITH ABCON STEEL POLES(0.330KM) |
154 | LT AB Cable 3x120+95mm2 PVC (1.1KV, 3+1 C al.) |
155 | Steel Pole 9 Mtr. Long (1800mm long) |
156 | Muff for steel tubular pole |
157 | Suspension Assembly |
158 | Fecad hook |
159 | Anchoring Assembly |
160 | LT Saty Set CompleteREC No 31/1983 |
161 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
162 | Prov. Full clamp |
163 | Coil Earthing (spec J-1/72) |
164 | T-Jointing Kit |
165 | M.S.Nuts & Bolt off Sizes |
166 | Aluminium paint |
167 | Erection Part of THREE PHASE LT LINE WITH ABCON STEEL POLES(0.330KM) |
168 | LT AB Cable 3x120+95mm2 PVC (1.1KV, 3+1 C al.) |
169 | Steel Pole 9 Mtr. Long (1800mm long) |
170 | Muff for steel tubular pole |
171 | Suspension Assembly |
172 | Fecad hook |
173 | Anchoring Assembly |
174 | LT Saty Set CompleteREC No 31/1983 |
175 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
176 | Prov. Full clamp |
177 | Coil Earthing (spec J-1/72) |
178 | T-Jointing Kit |
179 | M.S.Nuts & Bolt off Sizes |
180 | Aluminium paint |